Whitestone Power and Communications; Notice of Teleconference, 9229 [2012-3632]
Download as PDF
Federal Register / Vol. 77, No. 32 / Thursday, February 16, 2012 / Notices
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 9, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–3600 Filed 2–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13305–002]
Whitestone Power and
Communications; Notice of
Teleconference
a. Date and Time of Meeting: Tuesday,
February 21, 2012, starting at 2 p.m. and
ending at 4 p.m. (Eastern Standard
Time).
b. FERC Contact: Dianne Rodman,
(202) 502–6077 or
dianne.rodman@ferc.gov.
c. Purpose of Meeting: Commission
staff will meet with Whitestone Power
and Communications (Whitestone) to
discuss the need for environmental
monitoring for the Microturbine
Hydrokinetic River-In-Stream Energy
Conversion Power Project (also known
as the Whitestone Poncelet RISEC
Project), which would be located on the
Tanana River near Delta Junction,
Alaska.
d. All local, state, and federal
agencies, Indian tribes, and other
interested parties are invited to
participate by phone. Please call Dianne
Rodman by February 16, 2012, to RSVP
and to receive specific instructions on
how to participate.
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–3632 Filed 2–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
srobinson on DSK4SPTVN1PROD with NOTICES
[Project No. 13–023]
Green Island Power Authority; Notice
of Meeting and Teleconference
a. Date and Time of Meeting:
Wednesday March 21, 2012, beginning
at 10 a.m. EST.
b. Place: Commission Headquarters,
888 First Street NE., Washington, DC
20426, Room 62–26.
VerDate Mar<15>2010
16:31 Feb 15, 2012
Jkt 226001
c. FERC Contact: Tom Dean, (202)
502–6041.
d. Purpose of Meeting: To discuss
authorizations and approvals that may
be needed for, and the U.S. Army Corps
of Engineers’ (Corps) position on,
proposed modifications to the facilities
and operation of the Corps’ Green Island
Lock and Dam (see attached agenda for
complete list of topics).
e. All local, state, and federal
agencies, Indian tribes, and other
interested parties are invited to
participate either in person or by phone.
Please call Tom Dean at (202) 502–6041
by Wednesday, March 14, 2012, to
receive specific instructions on how to
participate.
f. FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or 202–502–8659
(TTY), or send a FAX to 202–208–2106
with the required accommodations.
g. A summary of the teleconference
will be placed in the public record for
the project.
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–3631 Filed 2–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14152–000]
Reliable Storage 1 LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 25, 2011, Reliable Storage
1 LLC filed an application, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of
hydropower near the town of Monterey,
in Putnam County, Tennessee. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed pumped storage project
would consist of the following: (1) A 70foot-high, 7,500-foot-long earth
embankment dam; (2) an upper
reservoir with a surface area of 100 acres
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
9229
and an 7,100 acre-foot storage capacity;
(3) a 120-foot-high, 920-foot-long earth
embankment dam creating; (4) a lower
reservoir with a surface area of 220 acres
and an 7,300 acre-foot storage capacity;
(5) one 30-foot-diameter, 3,200-foot-long
penstock; (6) a bifurcation to three
penstocks each 16-foot-diameter, and
100-foot-long; (7) an underground
powerhouse/pumping station
containing three pump/generating units
with a total generating capacity of 600
megawatts; (8) a 30-foot-diameter, 700foot-long tailrace tunnel; (9) a 24-footdiameter, 2,000-foot-long access tunnel;
(10) a substation; (11) a 1.4-mile-long,
500 kV transmission line to an existing
distribution line; and (12) a 6,300-footlong access road. The proposed project
would have an average annual
generation of 1,500,000 megawatt-hours
(MWh), which would be sold to a local
utility.
Applicant Contact: Mr. Daniel R.
Irvin, Free Flow Power Corporation, 239
Causeway Street Suite 300, Boston MA
01244; phone (978) 252–7631.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14152–000) in the docket number
E:\FR\FM\16FEN1.SGM
16FEN1
Agencies
[Federal Register Volume 77, Number 32 (Thursday, February 16, 2012)]
[Notices]
[Page 9229]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-3632]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13305-002]
Whitestone Power and Communications; Notice of Teleconference
a. Date and Time of Meeting: Tuesday, February 21, 2012, starting
at 2 p.m. and ending at 4 p.m. (Eastern Standard Time).
b. FERC Contact: Dianne Rodman, (202) 502-6077 or
dianne.rodman@ferc.gov.
c. Purpose of Meeting: Commission staff will meet with Whitestone
Power and Communications (Whitestone) to discuss the need for
environmental monitoring for the Microturbine Hydrokinetic River-In-
Stream Energy Conversion Power Project (also known as the Whitestone
Poncelet RISEC Project), which would be located on the Tanana River
near Delta Junction, Alaska.
d. All local, state, and federal agencies, Indian tribes, and other
interested parties are invited to participate by phone. Please call
Dianne Rodman by February 16, 2012, to RSVP and to receive specific
instructions on how to participate.
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-3632 Filed 2-15-12; 8:45 am]
BILLING CODE 6717-01-P