Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing, 9231 [2012-3628]

Download as PDF Federal Register / Vol. 77, No. 32 / Thursday, February 16, 2012 / Notices Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [Project Nos. 14188–000; 14200–000] [FR Doc. 2012–3633 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189–000; 14198–000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing [FR Doc. 2012–3634 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13824–000; Project No. 13826– 000] FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing srobinson on DSK4SPTVN1PROD with NOTICES Commission Meeting Room, located at 888 First Street NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. The Commission has received two preliminary permit applications deemed filed on August 6, 2010, at 8:30 a.m.,1 for proposed projects to be located on the Ouachita River, in Caldwell Parish, Louisiana. The applications were filed by FFP Missouri 17, LLC for Project No. 13824–000 and BOST2 Hydroelectric, LLC for Project No. 13826–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the 9231 The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Kentucky River, in Henry County and Owen County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund XL for Project No. 14189– 000 and FFP Project 56, LLC for Project No. 14198–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Kentucky River, in Jessamine County and Garrard County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund XXVIII for Project No. 14188–000 and FFP Project 59, LLC for Project No. 14200–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–3628 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185–000; 14196–000] Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing [FR Doc. 2012–3629 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P CFR 4.37 (2011). the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 CFR 4.37 (2011). Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. The Commission has received two preliminary permit applications deemed 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). 2 18 1 Under VerDate Mar<15>2010 16:31 Feb 15, 2012 Jkt 226001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\16FEN1.SGM 16FEN1

Agencies

[Federal Register Volume 77, Number 32 (Thursday, February 16, 2012)]
[Notices]
[Page 9231]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-3628]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 14188-000; 14200-000]


Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice 
Announcing Preliminary Permit Drawing

    The Commission has received two preliminary permit applications 
deemed filed on May 3, 2011, at 8:30 a.m.,\1\ for proposed projects to 
be located on the Kentucky River, in Jessamine County and Garrard 
County, Kentucky. The applications were filed by Lock+ Hydro Friends 
Fund XXVIII for Project No. 14188-000 and FFP Project 59, LLC for 
Project No. 14200-000.
---------------------------------------------------------------------------

    \1\ Under the Commission's Rules of Practice and Procedure, any 
document received after regular business hours is considered filed 
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) 
(2011).
---------------------------------------------------------------------------

    On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of 
the Commission, or her designee, will conduct a random drawing to 
determine the filing priority of the applicants identified in this 
notice. The Commission will select among competing permit applications 
as provided in section 4.37 of its regulations.\2\ The priority 
established by this drawing will be used to determine which applicant, 
among those with identical filing times, will be considered to have the 
first-filed application.
---------------------------------------------------------------------------

    \2\ 18 CFR 4.37 (2011).
---------------------------------------------------------------------------

    The drawing is open to the public and will be held in room 2C, the 
Commission Meeting Room, located at 888 First St. NE., Washington, DC 
20426. A subsequent notice will be issued by the Secretary announcing 
the results of the drawing.

    Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-3628 Filed 2-15-12; 8:45 am]
BILLING CODE 6717-01-P