Notice of Delays in Processing of Special Permits Applications, 8326-8327 [2012-2898]

Download as PDF 8326 Federal Register / Vol. 77, No. 30 / Tuesday, February 14, 2012 / Notices taken. Comments received after that date will be considered as far as practicable. All written communications concerning these proceedings are available for examination during regular business hours (9:00 a.m.–5:00 p.m.) at the above facility. All documents in the public docket are also available for inspection and copying on the Internet at the docket facility’s Web site at https://www.regulations.gov. Anyone is able to search the electronic form of any written communications and comments received into any of our dockets by the name of the individual submitting the comment (or signing the comment, if submitted on behalf of an association, business, labor union, etc.). You may review DOT’s complete Privacy Act Statement in the Federal Register published on April 11, 2000 (Volume 65, Number 70; Pages 19477–78). Issued in Washington, DC, on February 8, 2012. Ron Hynes, Acting Deputy Associate Administrator for Regulatory and Legislative Operations. [FR Doc. 2012–3346 Filed 2–13–12; 8:45 am] BILLING CODE 4910–06–P DEPARTMENT OF TRANSPORTATION Federal Railroad Administration [Docket Number FRA–2010–0180] mstockstill on DSK4VPTVN1PROD with NOTICES Petition for Waiver of Compliance In accordance with part 211 of title 49 of the Code of Federal Regulations (CFR), this document provides the public notice that by a document dated January 26, 2011, the Denton County Transportation Authority (DCTA) has petitioned the Federal Railroad Administration (FRA) for a waiver of compliance from certain provisions of the Federal railroad safety regulations. FRA assigned the petition Docket Number FRA–2010–0180. Specifically, DCTA has ordered 11 Stadler Bussnang AG, GTW 2⁄6 Diesel Multiple Units. These vehicles are constructed by a European manufacturer and meet European safety standards for crashworthiness and related safety measures. Currently, these vehicles are being delivered and tested at a DCTA maintenance facility. DCTA now seeks relief from certain requirements of the ‘‘Technical Criteria and Procedures for Evaluating the Crashworthiness and Occupant Protection Performance of Alternatively Designed Passenger Rail Equipment for use in Tier I Service.’’ In 2010, FRA formed an Engineering Task Force (ETF) to develop crashworthiness criteria for an alternatively designed and VerDate Mar<15>2010 21:57 Feb 13, 2012 Jkt 226001 constructed passenger vehicle to be capable of operating on the general railroad system with other compliant Tier 1 equipments. The waiver petition includes documentation on the following crashworthiness issues as required by ETF–1: • Collision with Conventional Equipment • Occupant Volume Integrity • Colliding Equipment Override • Fluid Entry Inhibition • End Structure Integrity of Cab End • End Structure Integrity of Non-Cab End • Roof Integrity • Side Structure Integrity • Truck to Carbody Attachment • Interior Fixture Attachment Interested parties are invited to participate in these proceedings by submitting written views, data, or comments. FRA does not anticipate scheduling a public hearing in connection with these proceedings since the facts do not appear to warrant a hearing. If any interested party desires an opportunity for oral comment, they should notify FRA, in writing, before the end of the comment period and specify the basis for their request. All communications concerning these proceedings should identify the appropriate docket number and may be submitted by any of the following methods: • Web site: https://www.regulations. gov. Follow the online instructions for submitting comments. • Fax: 202–493–2251. • Mail: Docket Operations Facility, U.S. Department of Transportation, 1200 New Jersey Avenue SE., W12–140, Washington, DC 20590. • Hand Delivery: 1200 New Jersey Avenue SE., Room W12–140, Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal Holidays. Communications received within 45 days of the date of this notice will be considered by FRA before final action is taken. Comments received after that date will be considered as far as practicable. All written communications concerning these proceedings are available for examination during regular business hours (9 a.m.–5 p.m.) at the above facility. All documents in the public docket are also available for inspection and copying on the Internet at the docket facility’s Web site at https://www.regulations.gov. Anyone is able to search the electronic form of any written communications and comments received into any of our dockets by the name of the individual submitting the PO 00000 Frm 00114 Fmt 4703 Sfmt 4703 comment (or signing the comment, if submitted on behalf of an association, business, labor union, etc.). You may review DOT’s complete Privacy Act Statement in the Federal Register published on April 11, 2000 (Volume 65, Number 70; Page 19477), or at https://www.dot.gov/privacy.html. Issued in Washington, DC, on February 8, 2012. Ron Hynes, Acting Deputy Associate Administrator for Regulatory and Legislative Operations. [FR Doc. 2012–3347 Filed 2–13–12; 8:45 am] BILLING CODE 4910–06–P DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration Notice of Delays in Processing of Special Permits Applications Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Hazardous Materials Safety, DOT. ACTION: List of Applications Delayed More than 180 Days. AGENCY: In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application. FOR FURTHER INFORMATION CONTACT: Ryan Paquet, Director, Office of Hazardous Materials Special Permits and Approvals, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building, PHH–30, 1200 New Jersey Avenue Southeast, Washington, DC 20590–0001, (202) 366–4535. SUPPLEMENTARY INFORMATION: SUMMARY: Key to ‘‘Reason for Delay’’ 1. Awaiting additional information from applicant. 2. Extensive public comment under review. 3. Application is technically complex and is of significant impact or precedent-setting and requires extensive analysis. 4. Staff review delayed by other priority issues or volume of special permit Applications. Meaning of Application Number Suffixes N—New application. M—Modification request. E:\FR\FM\14FEN1.SGM 14FEN1 8327 Federal Register / Vol. 77, No. 30 / Tuesday, February 14, 2012 / Notices Issued in Washington, DC, on February 2, 2012. Donald Burger, Chief, General Approvals and Permits. R—Renewal Request. P—Party To Exemption Request. Application No. Reason for delay Applicant Estimated date of completion Modification to Special Permits 8826–M ............. 14909–M ........... 10656–M ........... 11406–M ........... 12561–M ........... Phoenix Air Group, Inc. Cartersville, GA .................................................................................. Lake Clark Air, Inc. Port Alsworth, AK ..................................................................................... Conference of Radiation Control Program Directors, Inc. Frankfort, KY ................................. Conference of Radiation Control Program Directors, Inc. Frankford, KY ................................ Rhodia, Inc. Cranbury, NJ ........................................................................................................ 4 4 4 4 4 03–31–2012 03–31–2012 03–31–2012 03–31–2012 03–31–2012 4 1 1 4 4 03–31–2012 03–31–2012 03–31–2012 03–31–2012 03–31–2012 4 03–31–2012 4 4 4 4 4 4 4 4 4 4 03–31–2012 03–31–2012 03–31–2012 03–31–2012 03–31–2012 03–31–2012 03–31–2012 03–31–2012 03–31–2012 03–31–2012 4 4 4 03–31–2012 03–31–2012 03–31–2012 New Special Permit Applications 14872–N 14951–N 15080–N 15233–N 15510–N ........... ........... ........... ........... ........... Arkema, Inc. King of Prussia, PA ............................................................................................. Lincoln Composites Lincoln, NE ............................................................................................... Alaska Airlines Seattle, WA ...................................................................................................... ExpressJet Airlines, Inc. Houston, TX ...................................................................................... TEMSCO Helicopters, Inc. Ketchikan, AK ............................................................................... Party to Special Permits Application 12134–P ........... Riceland Foods, Inc. Stuttgart, AR ........................................................................................... Renewal Special Permits Applications 8445–R ............. 12443–R ........... 14482–R ........... 11759–R ........... 8723–R ............. 11749–R ........... 7891–R ............. 12283–R ........... 10709–R ........... 11227–R ........... 9929–R ............. 11903–R ........... 4850–R ............. Environmental Products & Services, Inc. Syracuse, NY .......................................................... Thatcher Company of Nevada Henderson, NV ....................................................................... Classic Helicopters Limited, L.C. Woods Cross, UT ................................................................ E.I. duPont de Neumours & Company, Inc. Wilmington, DE ................................................... Nelson Brothers Mining Services, LLC Birmingham, AL ......................................................... Occidental Chemical Corporation Dallas, TX ........................................................................... Aldrich Chemical Company Inc. Milwaukee, WI ...................................................................... Interstate Battery of Alaska Anchorage, AK ............................................................................. Schlumberger Technologies Corporation Sugar Land, TX ...................................................... Schlumberger Well Services a Division of Schlumberger Technology Corporation Sugar Land, TX. Alliant Techsystems Inc. Propulsion & Controls (Former Grantee ATK Elkton) Elkton, MD ... Comptank Corporation Bothwell, ON ....................................................................................... Schlumberger Technology Corporation Sugar Land, TX ......................................................... BILLING CODE 4910–60–M DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Joint Committee Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. AGENCY: An open meeting of the Taxpayer Advocacy Panel Joint Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and suggestions on improving customer service at the Internal Revenue Service. DATES: The meeting will be held Wednesday, March 28, 2012. FOR FURTHER INFORMATION CONTACT: Susan Gilbert at 1–888–912–1227 or (515) 564–6638. mstockstill on DSK4VPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 21:57 Feb 13, 2012 Jkt 226001 Notice is hereby given pursuant to Section 10(a)(2) of the Federal Advisory Committee Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Joint Committee will be held Wednesday, March 28, 2012, 2:00 p.m. Eastern Time via teleconference. The public is invited to make oral comments or submit written statements for consideration. Notification of intent to participate must be made with Susan Gilbert. For more information please contact Ms. Gilbert at 1–888–912–1227 or (515) 564–6638 or write: TAP Office, 210 Walnut Street, Stop 5115, Des Moines, IA 50309 or contact us at the Web site: https://www.improveirs.org. The agenda will include various IRS topics. SUPPLEMENTARY INFORMATION: [FR Doc. 2012–2898 Filed 2–13–12; 8:45 am] Dated: February 8, 2012. Shawn Collins, Director, Taxpayer Advocacy Panel. [FR Doc. 2012–3354 Filed 2–13–12; 8:45 am] BILLING CODE 4830–01–P PO 00000 Frm 00115 Fmt 4703 Sfmt 4703 DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. AGENCY: An open meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and suggestions on improving customer service at the Internal Revenue Service. DATES: The meeting will be held Thursday, March 01, 2012. FOR FURTHER INFORMATION CONTACT: Ellen Smiley at 1–888–912–1227 or 414–231–2360. SUPPLEMENTARY INFORMATION: Notice is hereby given pursuant to Section SUMMARY: E:\FR\FM\14FEN1.SGM 14FEN1

Agencies

[Federal Register Volume 77, Number 30 (Tuesday, February 14, 2012)]
[Notices]
[Pages 8326-8327]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-2898]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Pipeline and Hazardous Materials Safety Administration


Notice of Delays in Processing of Special Permits Applications

AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), 
Office of Hazardous Materials Safety, DOT.

ACTION: List of Applications Delayed More than 180 Days.

-----------------------------------------------------------------------

SUMMARY: In accordance with the requirements of 49 U.S.C. 5117(c), 
PHMSA is publishing the following list of special permit applications 
that have been in process for 180 days or more. The reason(s) for delay 
and the expected completion date for action on each application is 
provided in association with each identified application.

FOR FURTHER INFORMATION CONTACT: Ryan Paquet, Director, Office of 
Hazardous Materials Special Permits and Approvals, Pipeline and 
Hazardous Materials Safety Administration, U.S. Department of 
Transportation, East Building, PHH-30, 1200 New Jersey Avenue 
Southeast, Washington, DC 20590-0001, (202) 366-4535.

SUPPLEMENTARY INFORMATION:

Key to ``Reason for Delay''

    1. Awaiting additional information from applicant.
    2. Extensive public comment under review.
    3. Application is technically complex and is of significant impact 
or precedent-setting and requires extensive analysis.
    4. Staff review delayed by other priority issues or volume of 
special permit Applications.

Meaning of Application Number Suffixes

    N--New application.
    M--Modification request.

[[Page 8327]]

    R--Renewal Request.
    P--Party To Exemption Request.

    Issued in Washington, DC, on February 2, 2012.
Donald Burger,
Chief, General Approvals and Permits.

------------------------------------------------------------------------
                                            Reason for    Estimated date
    Application No.         Applicant          delay       of completion
------------------------------------------------------------------------
                     Modification to Special Permits
------------------------------------------------------------------------
8826-M................  Phoenix Air                    4      03-31-2012
                         Group, Inc.
                         Cartersville,
                         GA.
14909-M...............  Lake Clark Air,                4      03-31-2012
                         Inc. Port
                         Alsworth, AK.
10656-M...............  Conference of                  4      03-31-2012
                         Radiation
                         Control Program
                         Directors, Inc.
                         Frankfort, KY.
11406-M...............  Conference of                  4      03-31-2012
                         Radiation
                         Control Program
                         Directors, Inc.
                         Frankford, KY.
12561-M...............  Rhodia, Inc.                   4      03-31-2012
                         Cranbury, NJ.
------------------------------------------------------------------------
                     New Special Permit Applications
------------------------------------------------------------------------
14872-N...............  Arkema, Inc.                   4      03-31-2012
                         King of
                         Prussia, PA.
14951-N...............  Lincoln                        1      03-31-2012
                         Composites
                         Lincoln, NE.
15080-N...............  Alaska Airlines                1      03-31-2012
                         Seattle, WA.
15233-N...............  ExpressJet                     4      03-31-2012
                         Airlines, Inc.
                         Houston, TX.
15510-N...............  TEMSCO                         4      03-31-2012
                         Helicopters,
                         Inc. Ketchikan,
                         AK.
------------------------------------------------------------------------
                  Party to Special Permits Application
------------------------------------------------------------------------
12134-P...............  Riceland Foods,                4      03-31-2012
                         Inc. Stuttgart,
                         AR.
------------------------------------------------------------------------
                  Renewal Special Permits Applications
------------------------------------------------------------------------
8445-R................  Environmental                  4      03-31-2012
                         Products &
                         Services, Inc.
                         Syracuse, NY.
12443-R...............  Thatcher Company               4      03-31-2012
                         of Nevada
                         Henderson, NV.
14482-R...............  Classic                        4      03-31-2012
                         Helicopters
                         Limited, L.C.
                         Woods Cross, UT.
11759-R...............  E.I. duPont de                 4      03-31-2012
                         Neumours &
                         Company, Inc.
                         Wilmington, DE.
8723-R................  Nelson Brothers                4      03-31-2012
                         Mining
                         Services, LLC
                         Birmingham, AL.
11749-R...............  Occidental                     4      03-31-2012
                         Chemical
                         Corporation
                         Dallas, TX.
7891-R................  Aldrich Chemical               4      03-31-2012
                         Company Inc.
                         Milwaukee, WI.
12283-R...............  Interstate                     4      03-31-2012
                         Battery of
                         Alaska
                         Anchorage, AK.
10709-R...............  Schlumberger                   4      03-31-2012
                         Technologies
                         Corporation
                         Sugar Land, TX.
11227-R...............  Schlumberger                   4      03-31-2012
                         Well Services a
                         Division of
                         Schlumberger
                         Technology
                         Corporation
                         Sugar Land, TX.
9929-R................  Alliant                        4      03-31-2012
                         Techsystems
                         Inc. Propulsion
                         & Controls
                         (Former Grantee
                         ATK Elkton)
                         Elkton, MD.
11903-R...............  Comptank                       4      03-31-2012
                         Corporation
                         Bothwell, ON.
4850-R................  Schlumberger                   4      03-31-2012
                         Technology
                         Corporation
                         Sugar Land, TX.
------------------------------------------------------------------------

[FR Doc. 2012-2898 Filed 2-13-12; 8:45 am]
BILLING CODE 4910-60-M
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.