Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Availability of Environmental Assessment, 7142 [2012-3163]
Download as PDF
srobinson on DSK4SPTVN1PROD with NOTICES
7142
Federal Register / Vol. 77, No. 28 / Friday, February 10, 2012 / Notices
Filed Date: 2/3/12.
Accession Number: 20120203–5071.
Comments Due: 5 p.m. ET 2/24/12.
Docket Numbers: ER12–987–000.
Applicants: PJM Interconnection,
LLC, Virginia Electric and Power
Company.
Description: PJM Interconnection,
LLC submits tariff filing per
35.13(a)(2)(iii: PJM Service Agreement
No. 3191—WDSA among Dominion and
Richmond Energy LLC to be effective 1/
4/2012.
Filed Date: 2/3/12.
Accession Number: 20120203–5097.
Comments Due: 5 p.m. ET 2/24/12.
Docket Numbers: ER12–988–000.
Applicants: San Diego Gas & Electric
Company.
Description: San Diego Gas & Electric
Company submits tariff filing per
35.13(a)(2)(iii: Desert Star Service
Agreement to be effective 4/4/2012.
Filed Date: 2/3/12.
Accession Number: 20120203–5099.
Comments Due: 5 p.m. ET 2/24/12.
Docket Numbers: ER12–989–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
tariff filing per 35.13(a)(2)(iii: 2012–02–
03 CAISO’s LGIA with San Diego Gas &
Electric Co. to be effective 4/4/2012.
Filed Date: 2/3/12.
Accession Number: 20120203–5105.
Comments Due: 5 p.m. ET 2/24/12.
Docket Numbers: ER12–990–000.
Applicants: PacifiCorp.
Description: PacifiCorp submits tariff
filing per 35.15: Termination of
Bountiful Parrish Sub Construction
Agreement to be effective 4/10/2012.
Filed Date: 2/3/12.
Accession Number: 20120203–5110.
Comments Due: 5 p.m. ET 2/24/12.
Docket Numbers: ER12–991–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
submits tariff filing per 35.13(a)(2)(iii:
Rev to Att K and MR1 Reg Res for
Reliability Treated in RSP Process to be
effective 4/3/2012.
Filed Date: 2/3/12.
Accession Number: 20120203–5120.
Comments Due: 5 p.m. ET 2/24/12.
Docket Numbers: ER12–992–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
tariff filing per 35.13(a)(2)(iii: 2012–02–
03 Att B—Marked Tariff MSG
Enhancements.pdf to be effective 4/4/
2012 under ER12–992. Filing Type: 10.
Filed Date: 2/3/12.
Accession Number: 20120203–5125.
VerDate Mar<15>2010
21:29 Feb 09, 2012
Jkt 226001
Comments Due: 5 p.m. ET 2/24/12.
Docket Numbers: ER12–993–000.
Applicants: Robbins Energy, LLC.
Description: Robbins Energy, LLC
submits tariff filing per 35.1: Baseline
Tariff Filing to be effective 2/3/2012.
Filed Date: 2/3/12.
Accession Number: 20120203–5157.
Comments Due: 5 p.m. ET 2/24/12.
Docket Numbers: ER12–994–000.
Applicants: Parkview AMC Energy,
LLC.
Description: Parkview AMC Energy,
LLC submits tariff filing per 35.1:
Baseline Tariff Filing to be effective
2/3/2012.
Filed Date: 2/3/12.
Accession Number: 20120203–5158.
Comments Due: 5 p.m. ET 2/24/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 3, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–3110 Filed 2–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2309–019]
Jersey Central Power and Light
Company, PSEG Fossil, LLC; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380, the Office of Energy Projects has
reviewed the application for a new
license for the 364.5-megawatt (MW)
Yards Creek Pumped Storage
Hydroelectric Project located on Yards
PO 00000
Frm 00028
Fmt 4703
Sfmt 9990
Creek, in the townships of Hardwick
and Blairstown, Warren County, New
Jersey and has prepared an
environmental assessment (EA). In the
EA, Commission staff analyzes the
potential environmental effects of
licensing the project and conclude that
issuing a license for the project, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at FERCOnline
Support@ferc.gov or toll-free at (866)
208–3676, or for TTY, (202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Comments on the EA should be filed
within 30 days from the issuance date
of this notice, and should be addressed
to the Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Room 1–A, Washington, DC 20426.
Please affix ‘‘Yards Creek Pumped
Storage Hydroelectric Project No. 2309–
019’’ to all comments. Comments may
be filed electronically via Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. Although
the Commission strongly encourages
electronic filings, documents may also
be paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. For further
information contact Allyson Conner at
(202) 502–6082.
Dated: February 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–3163 Filed 2–9–12; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\10FEN1.SGM
10FEN1
Agencies
[Federal Register Volume 77, Number 28 (Friday, February 10, 2012)]
[Notices]
[Page 7142]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-3163]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2309-019]
Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice
of Availability of Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380, the Office of Energy Projects has reviewed the application for a
new license for the 364.5-megawatt (MW) Yards Creek Pumped Storage
Hydroelectric Project located on Yards Creek, in the townships of
Hardwick and Blairstown, Warren County, New Jersey and has prepared an
environmental assessment (EA). In the EA, Commission staff analyzes the
potential environmental effects of licensing the project and conclude
that issuing a license for the project, with appropriate environmental
measures, would not constitute a major federal action significantly
affecting the quality of the human environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The EA may also be viewed on the Commission's
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676,
or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Comments on the EA should be filed within 30 days from the issuance
date of this notice, and should be addressed to the Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Room 1-A,
Washington, DC 20426. Please affix ``Yards Creek Pumped Storage
Hydroelectric Project No. 2309-019'' to all comments. Comments may be
filed electronically via Internet in lieu of paper. The Commission
strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's Web site under the ``eFiling''
link. Although the Commission strongly encourages electronic filings,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426. For further
information contact Allyson Conner at (202) 502-6082.
Dated: February 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-3163 Filed 2-9-12; 8:45 am]
BILLING CODE 6717-01-P