Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Availability of Environmental Assessment, 7142 [2012-3163]

Download as PDF srobinson on DSK4SPTVN1PROD with NOTICES 7142 Federal Register / Vol. 77, No. 28 / Friday, February 10, 2012 / Notices Filed Date: 2/3/12. Accession Number: 20120203–5071. Comments Due: 5 p.m. ET 2/24/12. Docket Numbers: ER12–987–000. Applicants: PJM Interconnection, LLC, Virginia Electric and Power Company. Description: PJM Interconnection, LLC submits tariff filing per 35.13(a)(2)(iii: PJM Service Agreement No. 3191—WDSA among Dominion and Richmond Energy LLC to be effective 1/ 4/2012. Filed Date: 2/3/12. Accession Number: 20120203–5097. Comments Due: 5 p.m. ET 2/24/12. Docket Numbers: ER12–988–000. Applicants: San Diego Gas & Electric Company. Description: San Diego Gas & Electric Company submits tariff filing per 35.13(a)(2)(iii: Desert Star Service Agreement to be effective 4/4/2012. Filed Date: 2/3/12. Accession Number: 20120203–5099. Comments Due: 5 p.m. ET 2/24/12. Docket Numbers: ER12–989–000. Applicants: California Independent System Operator Corporation. Description: California Independent System Operator Corporation submits tariff filing per 35.13(a)(2)(iii: 2012–02– 03 CAISO’s LGIA with San Diego Gas & Electric Co. to be effective 4/4/2012. Filed Date: 2/3/12. Accession Number: 20120203–5105. Comments Due: 5 p.m. ET 2/24/12. Docket Numbers: ER12–990–000. Applicants: PacifiCorp. Description: PacifiCorp submits tariff filing per 35.15: Termination of Bountiful Parrish Sub Construction Agreement to be effective 4/10/2012. Filed Date: 2/3/12. Accession Number: 20120203–5110. Comments Due: 5 p.m. ET 2/24/12. Docket Numbers: ER12–991–000. Applicants: ISO New England Inc. Description: ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: Rev to Att K and MR1 Reg Res for Reliability Treated in RSP Process to be effective 4/3/2012. Filed Date: 2/3/12. Accession Number: 20120203–5120. Comments Due: 5 p.m. ET 2/24/12. Docket Numbers: ER12–992–000. Applicants: California Independent System Operator Corporation. Description: California Independent System Operator Corporation submits tariff filing per 35.13(a)(2)(iii: 2012–02– 03 Att B—Marked Tariff MSG Enhancements.pdf to be effective 4/4/ 2012 under ER12–992. Filing Type: 10. Filed Date: 2/3/12. Accession Number: 20120203–5125. VerDate Mar<15>2010 21:29 Feb 09, 2012 Jkt 226001 Comments Due: 5 p.m. ET 2/24/12. Docket Numbers: ER12–993–000. Applicants: Robbins Energy, LLC. Description: Robbins Energy, LLC submits tariff filing per 35.1: Baseline Tariff Filing to be effective 2/3/2012. Filed Date: 2/3/12. Accession Number: 20120203–5157. Comments Due: 5 p.m. ET 2/24/12. Docket Numbers: ER12–994–000. Applicants: Parkview AMC Energy, LLC. Description: Parkview AMC Energy, LLC submits tariff filing per 35.1: Baseline Tariff Filing to be effective 2/3/2012. Filed Date: 2/3/12. Accession Number: 20120203–5158. Comments Due: 5 p.m. ET 2/24/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 3, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–3110 Filed 2–9–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2309–019] Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a new license for the 364.5-megawatt (MW) Yards Creek Pumped Storage Hydroelectric Project located on Yards PO 00000 Frm 00028 Fmt 4703 Sfmt 9990 Creek, in the townships of Hardwick and Blairstown, Warren County, New Jersey and has prepared an environmental assessment (EA). In the EA, Commission staff analyzes the potential environmental effects of licensing the project and conclude that issuing a license for the project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnline Support@ferc.gov or toll-free at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Comments on the EA should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Yards Creek Pumped Storage Hydroelectric Project No. 2309– 019’’ to all comments. Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. Although the Commission strongly encourages electronic filings, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. For further information contact Allyson Conner at (202) 502–6082. Dated: February 6, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–3163 Filed 2–9–12; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\10FEN1.SGM 10FEN1

Agencies

[Federal Register Volume 77, Number 28 (Friday, February 10, 2012)]
[Notices]
[Page 7142]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-3163]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2309-019]


Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice 
of Availability of Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's regulations, 18 CFR part 
380, the Office of Energy Projects has reviewed the application for a 
new license for the 364.5-megawatt (MW) Yards Creek Pumped Storage 
Hydroelectric Project located on Yards Creek, in the townships of 
Hardwick and Blairstown, Warren County, New Jersey and has prepared an 
environmental assessment (EA). In the EA, Commission staff analyzes the 
potential environmental effects of licensing the project and conclude 
that issuing a license for the project, with appropriate environmental 
measures, would not constitute a major federal action significantly 
affecting the quality of the human environment.
    A copy of the EA is on file with the Commission and is available 
for public inspection. The EA may also be viewed on the Commission's 
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, 
or for TTY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Comments on the EA should be filed within 30 days from the issuance 
date of this notice, and should be addressed to the Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE., Room 1-A, 
Washington, DC 20426. Please affix ``Yards Creek Pumped Storage 
Hydroelectric Project No. 2309-019'' to all comments. Comments may be 
filed electronically via Internet in lieu of paper. The Commission 
strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) 
and the instructions on the Commission's Web site under the ``eFiling'' 
link. Although the Commission strongly encourages electronic filings, 
documents may also be paper-filed. To paper-file, mail an original and 
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE., Washington, DC 20426. For further 
information contact Allyson Conner at (202) 502-6082.

    Dated: February 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-3163 Filed 2-9-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.