Consumers Energy Company, Detroit Edison Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 5787-5788 [2012-2574]
Download as PDF
Federal Register / Vol. 77, No. 24 / Monday, February 6, 2012 / Notices
on or before the specified deadline date
for the particular application.
q. All filings must (1) Bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’,
‘‘RECOMMENDATIONS’’, ‘‘TERMS
AND CONDITIONS’’, or
‘‘PRESCRIPTIONS’’; (2) set forth in the
heading, the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and seven copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: January 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–2570 Filed 2–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
[Project No. 2680–105]
Consumers Energy Company, Detroit
Edison Company; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
VerDate Mar<15>2010
17:27 Feb 03, 2012
Jkt 226001
a. Types of Application: Amendment
of License.
b. Project No.: 2680–105.
c. Date Filed: December 16, 2011.
d. Applicants: Consumers Energy
Company & Detroit Edison Company.
e. Name of Projects: Ludington
Pumped Storage.
f. Location: On the shore of Lake
Michigan in Mason County, Michigan.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Robert M.
Neustifter, Principal Attorney,
Consumers Energy Company, One
Energy Plaza, Jackson, MI 49201. Tel:
(517) 788–2974.
i. FERC Contact: Mr. Vedula Sarma,
(202) 502–6190, vedula.sarma@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests, is
30 days from the issuance date of this
notice. All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project numbers
(P–2680–105) on any comments,
motions, or recommendations filed.
k. Description of Request: The
licensee proposes to upgrade and
overhaul all six pump-turbine/motor
generating units of the Ludington
pumped storage project, one unit at a
time over the period 2013 through 2019.
The overhaul would increase the
authorized installed and hydraulic
capacities of the project from 1,657.5
MW to 1,785 MW and from 66,600 cfs
to 76,290 cfs, respectively.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
5787
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–(866) 208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) Bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
E:\FR\FM\06FEN1.SGM
06FEN1
5788
Federal Register / Vol. 77, No. 24 / Monday, February 6, 2012 / Notices
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: January 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–2574 Filed 2–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–50–001]
mstockstill on DSK4VPTVN1PROD with NOTICES
PetroLogistics Natural Gas Storage,
LLC; Notice of Application
Take notice that on January 27, 2012,
PetroLogistics Natural Gas Storage, LLC
(PetroLogistics), 4470 Bluebonnet Blvd.,
Baton Rouge, Louisiana 70809, filed in
Docket No. CP11–50–001, an
application pursuant to section 7(c) of
the Natural Gas Act (NGA) and Part 157
of the Commission’s regulations, to
amend its previously filed application
in Docket No. CP11–50–000.
Specifically, PetroLogistics request to
amend its certificate by removing
Cavern 102 from the PetroLogistic’s
proposed project in Iberville Parish,
Louisiana. PetroLogistics states that
Cavern 102 has been removed from the
project because the Department of
Energy has recently taken the cavern
through a condemnation proceeding.
PetroLogistics states that, aside from the
removal of Cavern 102, only slight
additional modifications are necessary,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits,
in the docket number field to access the
document. For assistance, call (866)
208–3676 or TTY, (202) 502–8659.
Any questions regarding this
application should be directed to Allen
Kirkley, PetroLogistics Natural Gas
Storage, LLC, 4470 Bluebonnet Blvd.,
Baton Rouge, Louisiana 70809, or by
calling (225) 706–2253 (telephone) or
(225) 706–7050 (fax).
Pursuant to section 157.9 of the
Commission’s regulations, 18 CFR
157.9, within 90 days of this Notice, the
Commission’s staff will either complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
VerDate Mar<15>2010
17:27 Feb 03, 2012
Jkt 226001
issued, it will indicate, among other
milestones, the anticipated date for the
Commission’s staff issuance of the EA
for this proposal. The filing of the EA
in the Commission’s public record for
this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to reach a final
decision on a request for federal
authorization within 90 days of the date
of issuance of the Commission staff’s
EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link.
Comment Date: February 21, 2012
Dated: January 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–2576 Filed 2–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12–338–000.
Applicants: Trailblazer Pipeline
Company LLC.
Description: Penalty Revenue
Crediting Report of Trailblazer Pipeline
Company LLC.
Filed Date: 1/27/12.
Accession Number: 20120127–5148.
Comments Due: 5 p.m. ET 2/8/12.
Docket Numbers: RP12–339–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: ONEOK 34951 to BG
Energy 39507 Capacity Release
Negotiated Rate Agreement Filing to be
effective 2/1/2012.
Filed Date: 1/30/12.
Accession Number: 20120130–5180.
Comments Due: 5 p.m. ET 2/13/12.
Docket Numbers: RP12–340–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: HK 37731 to Spark 39520
Capacity Release Negotiated Rate
E:\FR\FM\06FEN1.SGM
06FEN1
Agencies
[Federal Register Volume 77, Number 24 (Monday, February 6, 2012)]
[Notices]
[Pages 5787-5788]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-2574]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2680-105]
Consumers Energy Company, Detroit Edison Company; Notice of
Application Accepted for Filing, Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Types of Application: Amendment of License.
b. Project No.: 2680-105.
c. Date Filed: December 16, 2011.
d. Applicants: Consumers Energy Company & Detroit Edison Company.
e. Name of Projects: Ludington Pumped Storage.
f. Location: On the shore of Lake Michigan in Mason County,
Michigan.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Robert M. Neustifter, Principal Attorney,
Consumers Energy Company, One Energy Plaza, Jackson, MI 49201. Tel:
(517) 788-2974.
i. FERC Contact: Mr. Vedula Sarma, (202) 502-6190,
vedula.sarma@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests, is 30 days from the issuance date of this notice. All
documents may be filed electronically via the Internet. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be filed
electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments.
Please include the project numbers (P-2680-105) on any comments,
motions, or recommendations filed.
k. Description of Request: The licensee proposes to upgrade and
overhaul all six pump-turbine/motor generating units of the Ludington
pumped storage project, one unit at a time over the period 2013 through
2019. The overhaul would increase the authorized installed and
hydraulic capacities of the project from 1,657.5 MW to 1,785 MW and
from 66,600 cfs to 76,290 cfs, respectively.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-(866) 208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
Bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license surrender.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in
[[Page 5788]]
accordance with 18 CFR 4.34(b) and 385.2010.
Dated: January 31, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-2574 Filed 2-3-12; 8:45 am]