Notice of Commission Staff Attendance, 3764-3765 [2012-1479]
Download as PDF
3764
Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 14 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: January 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–1474 Filed 1–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–46–000]
srobinson on DSK4SPTVN1PROD with NOTICES
Kinder Morgan Interstate Gas
Transmission LLC
Notice of Request Under Blanket
Authorization
Take notice that on January 6, 2012,
Kinder Morgan Interstate Gas
Transmission LLC (Kinder Morgan),
Post Office Box 281304, Lakewood,
Colorado 800228–8304, filed in the
above Docket, a prior notice request
pursuant to sections 157.205, 157.208
and 157.213 of the Commission’s
VerDate Mar<15>2010
18:09 Jan 24, 2012
Jkt 226001
regulations under the Natural Gas Act
(NGA), for authorization to increase the
current certificated maximum injection
and withdrawal rates at the Huntsman
Storage Facility located in Cheyenne
County, Nebraska under Kinder
Morgan’s blanket certificate issued
March 16, 1983 and Docket Nos. CP83–
140–100 and CP83–140–001, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Kinder Morgan states that by a
Commission order issued September 30,
2009 in Docket No. CP09–109–000, it
was granted authorization to construct
and operate additional facilities, the
Huntsman 2009 Expansion Project, to
increase the capability of the Huntsman
Storage Facility. The September 30,
2009 order also authorized Kinder
Morgan to increase the injection and
withdrawal rates to the currently
authorized maximum injection rate of
107 MMcf/d and withdrawal rate of
179.4 MMcf/d. Specifically, Kinder
Morgan is requesting authorization to
increase the maximum certificated
injection rate from 107 MMcf/d to 130
MMcf/d, and to increase the maximum
certificated withdrawal rate from 179.4
MMCf/d to 210 MMcf/d.
Any questions concerning this
application may be directed to Robert F.
Harrington, Vice President, Regulatory,
Kinder Morgan Interstate Gas
Transmission LLC, P.O. Box 281304,
Lake wood, Colorado 80228–8304 at
(303) 763–3258.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Dated: January 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–1476 Filed 1–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meeting related to
the transmission planning activities of
the Midwest Independent Transmission
System Operator, Inc. (MISO):
Order No. 1000 Right of First Refusal
(ROFR) Workshop
The above-referenced meeting will be
held at:
MISO Headquarters, 720 City Center
Drive, Carmel, IN 46032.
The above-referenced meeting is open
to the public.
Further information may be found at
www.misoenergy.org.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. ER12–715, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER12–480, Midwest
Independent Transmission System,
Operator, Inc.
Docket No. ER11–1844, Midwest
Independent Transmission System,
Operator, Inc.
Docket No. EL11–56, FirstEnergy
Service Company.
Docket No. EL11–34, Midwest
Independent Transmission System
Operator, Inc.
Docket No. EL11–30, E.ON Climate &
Renewables North America, LLC v.
Midwest Independent Transmission
System Operator, Inc.
Docket No. OA08–53, Midwest
Independent Transmission System
Operator, Inc.
For more information, contact
Christopher Miller, Office of Energy
E:\FR\FM\25JAN1.SGM
25JAN1
3765
Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices
Markets Regulation, Federal Energy
Regulatory Commission at (317) 249–
5936 or christopher.miller@ferc.gov.
Dated: January 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–1479 Filed 1–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Staff Attendance at
Southwest Power Pool Regional Entity
Trustee, Regional State Committee and
Board of Directors Meetings
The Federal Energy Regulatory
Commission hereby gives notice that
members of its staff may attend the
meetings of the Southwest Power Pool,
Inc. (SPP) Regional Entity Trustee (RE),
Regional State Committee (RSC) and
Board of Directors, as noted below.
Their attendance is part of the
Commission’s ongoing outreach efforts.
All meetings will be held at the
Intercontinental Stephen F. Austin
Hotel, 701 Congress Avenue, Austin, TX
78701. The hotel phone number is (800)
235–4670.
SPP RE
Dated: January 18, 2012.
Kimberly D. Bose,
Secretary.
January 30, 2012 (8 a.m.–2 p.m.).
SPP RSC
srobinson on DSK4SPTVN1PROD with NOTICES
January 31, 2012 (8 a.m.–3 p.m.) .
The discussions may address matters
at issue in the following proceedings:
Docket No. ER06–451, Southwest Power
Pool, Inc.
Docket No. ER08–1419, Southwest
Power Pool, Inc.
Docket No. ER09–659, Southwest Power
Pool, Inc.
Docket No. ER09–1050, Southwest
Power Pool, Inc.
Docket No. ER10–941, Southwest Power
Pool, Inc.
Docket No. ER11–3627, Southwest
Power Pool, Inc.
Docket No. ER11–3958, Southwest
Power Pool, Inc.
Docket No. ER11–3967, Southwest
Power Pool, Inc.
Docket No. ER11–4105, Southwest
Power Pool, Inc.
OA07–32
EL00–66
EL01–88
EL07–52
EL08–51
VerDate Mar<15>2010
March 2012, 8:30 a.m.–12:30 p.m.,
Local Time (date to be determined).
The above-referenced meetings will
be held at: NYISO’s offices, Rensselaer,
NY.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
www.nyiso.com.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Docket No. RM10–23, Transmission
Planning and Cost Allocation by
Transmission Owning and Operating
Public Utilities
Docket No. ER08–1281, New York
Independent System Operator, Inc.
For more information, contact James
Eason, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8622 or
James.Eason@ferc.gov.
Dated: January 18, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–1468 Filed 1–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Notice of FERC Staff Attendance at the
Entergy Regional State Committee
Work Group and Stakeholder Meeting
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meetings related to the
transmission planning activities of the
New York Independent System
Operator, Inc. (NYISO):
Electric System Planning Working
Group
January 26, 2012, 10 a.m.–4 p.m.,
Local Time.
...............................................................................
................................................................................
................................................................................
................................................................................
................................................................................
18:09 Jan 24, 2012
Inter-Regional Planning Advisory
Committee
BILLING CODE 6717–01–P
SPP Board of Directors
No.
No.
No.
No.
No.
February 7, 2012, 10 a.m.–4 p.m.,
Local Time.
February 24, 2012, 10 a.m.–4 p.m.,
Local Time.
[FR Doc. 2012–1466 Filed 1–24–12; 8:45 am]
January 30, 2012 (1 p.m.–5 p.m.).
Docket
Docket
Docket
Docket
Docket
Docket No. ER12–140. Southwest Power
Pool, Inc.
Docket No. ER12–430, Southwest Power
Pool, Inc.
Docket No. ER12–455, Southwest Power
Pool, Inc.
Docket No. ER12–526, Southwest Power
Pool, Inc.
Docket No. ER12–528, Southwest Power
Pool, Inc.
Docket No. ER12–550, Southwest Power
Pool, Inc.
Docket No. ER12–557, Southwest Power
Pool, Inc.
Docket No. ER12–608, Southwest Power
Pool, Inc.
Docket No. ER12–801, Southwest Power
Pool, Inc.
Docket No. ER11–3728, Midwest
Independent System Operator, Inc.
Docket No. ER12–480, Midwest
Independent System Operator, Inc.
Docket No. ER12–600, Midwest
Independent System Operator, Inc.
Docket No. ER12–739, Midwest
Independent System Operator, Inc.
Docket No. EL11–34, Midwest
Independent System Operator, Inc.
These meetings are open to the
public.
For more information, contact Patrick
Clarey, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov.
Jkt 226001
PO 00000
Frm 00037
Fmt 4703
Entergy Services, Inc.
Louisiana Public Service
Louisiana Public Service
Louisiana Public Service
Louisiana Public Service
Sfmt 4703
The Federal Energy Regulatory
Commission hereby gives notice that
members of its staff may attend the
meeting noted below. Their attendance
is part of the Commission’s ongoing
outreach efforts.
Entergy Regional State Committee
Working Group and Stakeholders
Meeting
January 26, 2012 (9 a.m.–3 p.m.).
This meeting will be held at the Pan
American Life Center, 601 Poydras
Street, New Orleans, LA 70130.
The discussions may address matters
at issue in the following proceedings:
Commission
Commission
Commission
Commission
E:\FR\FM\25JAN1.SGM
25JAN1
v.
v.
v.
v.
Entergy
Entergy
Entergy
Entergy
Services,
Services,
Services,
Services,
Inc.
Inc.
Inc.
Inc.
Agencies
[Federal Register Volume 77, Number 16 (Wednesday, January 25, 2012)]
[Notices]
[Pages 3764-3765]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-1479]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission's staff may attend the following meeting
related to the transmission planning activities of the Midwest
Independent Transmission System Operator, Inc. (MISO):
Order No. 1000 Right of First Refusal (ROFR) Workshop
The above-referenced meeting will be held at:
MISO Headquarters, 720 City Center Drive, Carmel, IN 46032.
The above-referenced meeting is open to the public.
Further information may be found at www.misoenergy.org.
The discussions at the meeting described above may address matters
at issue in the following proceedings:
Docket No. ER12-715, Midwest Independent Transmission System Operator,
Inc.
Docket No. ER12-480, Midwest Independent Transmission System, Operator,
Inc.
Docket No. ER11-1844, Midwest Independent Transmission System,
Operator, Inc.
Docket No. EL11-56, FirstEnergy Service Company.
Docket No. EL11-34, Midwest Independent Transmission System Operator,
Inc.
Docket No. EL11-30, E.ON Climate & Renewables North America, LLC v.
Midwest Independent Transmission System Operator, Inc.
Docket No. OA08-53, Midwest Independent Transmission System Operator,
Inc.
For more information, contact Christopher Miller, Office of Energy
[[Page 3765]]
Markets Regulation, Federal Energy Regulatory Commission at (317) 249-
5936 or christopher.miller@ferc.gov.
Dated: January 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-1479 Filed 1-24-12; 8:45 am]