Notice of Commission Staff Attendance, 3764-3765 [2012-1479]

Download as PDF 3764 Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: January 19, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–1474 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–46–000] srobinson on DSK4SPTVN1PROD with NOTICES Kinder Morgan Interstate Gas Transmission LLC Notice of Request Under Blanket Authorization Take notice that on January 6, 2012, Kinder Morgan Interstate Gas Transmission LLC (Kinder Morgan), Post Office Box 281304, Lakewood, Colorado 800228–8304, filed in the above Docket, a prior notice request pursuant to sections 157.205, 157.208 and 157.213 of the Commission’s VerDate Mar<15>2010 18:09 Jan 24, 2012 Jkt 226001 regulations under the Natural Gas Act (NGA), for authorization to increase the current certificated maximum injection and withdrawal rates at the Huntsman Storage Facility located in Cheyenne County, Nebraska under Kinder Morgan’s blanket certificate issued March 16, 1983 and Docket Nos. CP83– 140–100 and CP83–140–001, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Kinder Morgan states that by a Commission order issued September 30, 2009 in Docket No. CP09–109–000, it was granted authorization to construct and operate additional facilities, the Huntsman 2009 Expansion Project, to increase the capability of the Huntsman Storage Facility. The September 30, 2009 order also authorized Kinder Morgan to increase the injection and withdrawal rates to the currently authorized maximum injection rate of 107 MMcf/d and withdrawal rate of 179.4 MMcf/d. Specifically, Kinder Morgan is requesting authorization to increase the maximum certificated injection rate from 107 MMcf/d to 130 MMcf/d, and to increase the maximum certificated withdrawal rate from 179.4 MMCf/d to 210 MMcf/d. Any questions concerning this application may be directed to Robert F. Harrington, Vice President, Regulatory, Kinder Morgan Interstate Gas Transmission LLC, P.O. Box 281304, Lake wood, Colorado 80228–8304 at (303) 763–3258. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: January 19, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–1476 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission hereby gives notice that members of the Commission’s staff may attend the following meeting related to the transmission planning activities of the Midwest Independent Transmission System Operator, Inc. (MISO): Order No. 1000 Right of First Refusal (ROFR) Workshop The above-referenced meeting will be held at: MISO Headquarters, 720 City Center Drive, Carmel, IN 46032. The above-referenced meeting is open to the public. Further information may be found at www.misoenergy.org. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. ER12–715, Midwest Independent Transmission System Operator, Inc. Docket No. ER12–480, Midwest Independent Transmission System, Operator, Inc. Docket No. ER11–1844, Midwest Independent Transmission System, Operator, Inc. Docket No. EL11–56, FirstEnergy Service Company. Docket No. EL11–34, Midwest Independent Transmission System Operator, Inc. Docket No. EL11–30, E.ON Climate & Renewables North America, LLC v. Midwest Independent Transmission System Operator, Inc. Docket No. OA08–53, Midwest Independent Transmission System Operator, Inc. For more information, contact Christopher Miller, Office of Energy E:\FR\FM\25JAN1.SGM 25JAN1 3765 Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices Markets Regulation, Federal Energy Regulatory Commission at (317) 249– 5936 or christopher.miller@ferc.gov. Dated: January 19, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–1479 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Staff Attendance at Southwest Power Pool Regional Entity Trustee, Regional State Committee and Board of Directors Meetings The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meetings of the Southwest Power Pool, Inc. (SPP) Regional Entity Trustee (RE), Regional State Committee (RSC) and Board of Directors, as noted below. Their attendance is part of the Commission’s ongoing outreach efforts. All meetings will be held at the Intercontinental Stephen F. Austin Hotel, 701 Congress Avenue, Austin, TX 78701. The hotel phone number is (800) 235–4670. SPP RE Dated: January 18, 2012. Kimberly D. Bose, Secretary. January 30, 2012 (8 a.m.–2 p.m.). SPP RSC srobinson on DSK4SPTVN1PROD with NOTICES January 31, 2012 (8 a.m.–3 p.m.) . The discussions may address matters at issue in the following proceedings: Docket No. ER06–451, Southwest Power Pool, Inc. Docket No. ER08–1419, Southwest Power Pool, Inc. Docket No. ER09–659, Southwest Power Pool, Inc. Docket No. ER09–1050, Southwest Power Pool, Inc. Docket No. ER10–941, Southwest Power Pool, Inc. Docket No. ER11–3627, Southwest Power Pool, Inc. Docket No. ER11–3958, Southwest Power Pool, Inc. Docket No. ER11–3967, Southwest Power Pool, Inc. Docket No. ER11–4105, Southwest Power Pool, Inc. OA07–32 EL00–66 EL01–88 EL07–52 EL08–51 VerDate Mar<15>2010 March 2012, 8:30 a.m.–12:30 p.m., Local Time (date to be determined). The above-referenced meetings will be held at: NYISO’s offices, Rensselaer, NY. The above-referenced meetings are open to stakeholders. Further information may be found at www.nyiso.com. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket No. RM10–23, Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities Docket No. ER08–1281, New York Independent System Operator, Inc. For more information, contact James Eason, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502–8622 or James.Eason@ferc.gov. Dated: January 18, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–1468 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission DEPARTMENT OF ENERGY Notice of FERC Staff Attendance at the Entergy Regional State Committee Work Group and Stakeholder Meeting Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following meetings related to the transmission planning activities of the New York Independent System Operator, Inc. (NYISO): Electric System Planning Working Group January 26, 2012, 10 a.m.–4 p.m., Local Time. ............................................................................... ................................................................................ ................................................................................ ................................................................................ ................................................................................ 18:09 Jan 24, 2012 Inter-Regional Planning Advisory Committee BILLING CODE 6717–01–P SPP Board of Directors No. No. No. No. No. February 7, 2012, 10 a.m.–4 p.m., Local Time. February 24, 2012, 10 a.m.–4 p.m., Local Time. [FR Doc. 2012–1466 Filed 1–24–12; 8:45 am] January 30, 2012 (1 p.m.–5 p.m.). Docket Docket Docket Docket Docket Docket No. ER12–140. Southwest Power Pool, Inc. Docket No. ER12–430, Southwest Power Pool, Inc. Docket No. ER12–455, Southwest Power Pool, Inc. Docket No. ER12–526, Southwest Power Pool, Inc. Docket No. ER12–528, Southwest Power Pool, Inc. Docket No. ER12–550, Southwest Power Pool, Inc. Docket No. ER12–557, Southwest Power Pool, Inc. Docket No. ER12–608, Southwest Power Pool, Inc. Docket No. ER12–801, Southwest Power Pool, Inc. Docket No. ER11–3728, Midwest Independent System Operator, Inc. Docket No. ER12–480, Midwest Independent System Operator, Inc. Docket No. ER12–600, Midwest Independent System Operator, Inc. Docket No. ER12–739, Midwest Independent System Operator, Inc. Docket No. EL11–34, Midwest Independent System Operator, Inc. These meetings are open to the public. For more information, contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249–5937 or patrick.clarey@ferc.gov. Jkt 226001 PO 00000 Frm 00037 Fmt 4703 Entergy Services, Inc. Louisiana Public Service Louisiana Public Service Louisiana Public Service Louisiana Public Service Sfmt 4703 The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting noted below. Their attendance is part of the Commission’s ongoing outreach efforts. Entergy Regional State Committee Working Group and Stakeholders Meeting January 26, 2012 (9 a.m.–3 p.m.). This meeting will be held at the Pan American Life Center, 601 Poydras Street, New Orleans, LA 70130. The discussions may address matters at issue in the following proceedings: Commission Commission Commission Commission E:\FR\FM\25JAN1.SGM 25JAN1 v. v. v. v. Entergy Entergy Entergy Entergy Services, Services, Services, Services, Inc. Inc. Inc. Inc.

Agencies

[Federal Register Volume 77, Number 16 (Wednesday, January 25, 2012)]
[Notices]
[Pages 3764-3765]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-1479]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission Staff Attendance

    The Federal Energy Regulatory Commission hereby gives notice that 
members of the Commission's staff may attend the following meeting 
related to the transmission planning activities of the Midwest 
Independent Transmission System Operator, Inc. (MISO):

Order No. 1000 Right of First Refusal (ROFR) Workshop

    The above-referenced meeting will be held at:

MISO Headquarters, 720 City Center Drive, Carmel, IN 46032.

    The above-referenced meeting is open to the public.
    Further information may be found at www.misoenergy.org.
    The discussions at the meeting described above may address matters 
at issue in the following proceedings:

Docket No. ER12-715, Midwest Independent Transmission System Operator, 
Inc.
Docket No. ER12-480, Midwest Independent Transmission System, Operator, 
Inc.
Docket No. ER11-1844, Midwest Independent Transmission System, 
Operator, Inc.
Docket No. EL11-56, FirstEnergy Service Company.
Docket No. EL11-34, Midwest Independent Transmission System Operator, 
Inc.
Docket No. EL11-30, E.ON Climate & Renewables North America, LLC v. 
Midwest Independent Transmission System Operator, Inc.
Docket No. OA08-53, Midwest Independent Transmission System Operator, 
Inc.

    For more information, contact Christopher Miller, Office of Energy

[[Page 3765]]

Markets Regulation, Federal Energy Regulatory Commission at (317) 249-
5936 or christopher.miller@ferc.gov.

    Dated: January 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-1479 Filed 1-24-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.