Nevada Irrigation District; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions, 3756-3757 [2012-1473]

Download as PDF srobinson on DSK4SPTVN1PROD with NOTICES 3756 Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘PRELIMINARY TERMS AND CONDITIONS,’’ or ‘‘PRELIMINARY FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions. VerDate Mar<15>2010 Date April 30, 2012. 18:09 Jan 24, 2012 Jkt 226001 Milestone Commission issues Draft Environmental Impact Statement (EIS). Comments on Draft EIS Modified Terms and Conditions. Commission Issues Final EIS. Date December 26, 2012. February 24, 2013. April 25, 2013. July 24, 2013. p. Final amendments to the application must be filed with the Commission no later than 60 days from the issuance date of this notice. q. A license applicant must file no later than 60 days following the date of issuance of the notice of acceptance and ready for environmental analysis provided for in 5.22: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Dated: January 19, 2012. Kimberly D. Bose, Secretary . [FR Doc. 2012–1469 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2266–102] Nevada Irrigation District; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2266–102. c. Date filed: April 15, 2011. d. Applicant: Nevada Irrigation District. e. Name of Project: Yuba-Bear Hydroelectric Project. f. Location: The existing Yuba-Bear Project is located on the west slope of the Sierra Nevada on the Middle Yuba River, Canyon Creek, Fall Creek, Rucker Creek, and Bear River, in Nevada, Placer and Sierra Counties, California. The project would affect 1,541 acres of federal lands managed by the U.S. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Forest Service (Tahoe National Forest) and 209 acres managed by the Bureau of Land Management (Sierra Resource Management Area). g. Filed Pursuant to: Federal Power Act 16 USC 791 (a)–825(r) . h. Applicant Contact: Ron Nelson, General Manager, Nevada Irrigation District, 1036 West Main Street, Grass Valley, CA 95945, (530) 271–6824 or email nelson@nid.dst.ca.us. i. FERC Contact: Alan Mitchnick, (202) 502–6074 or alan.mitchnick@ferc.gov j. Deadline for filing motions to intervene and protests, comments, recommendations, preliminary terms and conditions, and preliminary prescriptions: April 30, 2012; reply comments are due no later than June 13, 2012. Motions to intervene, protests, comments, recommendations, preliminary terms and conditions, and preliminary fishway prescriptions may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing and is now ready for environmental analysis. l. The project consists of four developments—Bowman, Dutch Flat, Chicago Park, and Rollins—which, in total, include: 13 main dams with a combined gross storage capacity of 207,865 acre-feet of water; four water E:\FR\FM\25JAN1.SGM 25JAN1 srobinson on DSK4SPTVN1PROD with NOTICES Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices conduits; five diversion dams; four powerhouses with a combined installed capacity of 79.32 megawatts; one 9.0mile-long, 60-kilovolt transmission line; and appurtenant facilities and structures, including recreation facilities. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at - using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits (P–2266) in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘PRELIMINARY TERMS AND CONDITIONS,’’ or ‘‘PRELIMINARY FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be VerDate Mar<15>2010 18:09 Jan 24, 2012 Jkt 226001 accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions. Commission issues Draft Environmental Impact Statement (EIS). Comments on Draft EIS Modified Terms and Conditions. Commission Issues Final EIS. Date April 30, 2012. December 26, 2012. February 24, 2013. April 25, 2013. July 24, 2013. p. Final amendments to the application must be filed with the Commission no later than 60 days from the issuance date of this notice. q. A license applicant must file no later than 60 days following the date of issuance of the notice of acceptance and ready for environmental analysis provided for in 5.22: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Dated: January 19, 2012. Kimberly D. Bose, Secretary . [FR Doc. 2012–1473 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–45–000] El Paso Natural Gas Company; Notice of Application Take notice that on January 5, 2012, El Paso Natural Gas Company (EPNG), Post Office Box 1087, Colorado Springs, Colorado 80944 filed an application in the above referenced docket pursuant to section 7(b) of the Natural Gas Act (NGA) for approval to abandon in place certain compression facilities and appurtenances at six compressor stations in San Juan County, New PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 3757 Mexico and Apache, Coconino, Navajo, and Yavapai Counties, Arizona, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Susan C. Stires, Director, Regulatory Affairs Department, El Paso Natural Gas Company, Post Office Box 1087, Colorado Springs, Colorado 80944 at (719) 667–7514. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. E:\FR\FM\25JAN1.SGM 25JAN1

Agencies

[Federal Register Volume 77, Number 16 (Wednesday, January 25, 2012)]
[Notices]
[Pages 3756-3757]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-1473]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2266-102]


Nevada Irrigation District; Notice of Application Accepted for 
Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, 
Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2266-102.
    c. Date filed: April 15, 2011.
    d. Applicant: Nevada Irrigation District.
    e. Name of Project: Yuba-Bear Hydroelectric Project.
    f. Location: The existing Yuba-Bear Project is located on the west 
slope of the Sierra Nevada on the Middle Yuba River, Canyon Creek, Fall 
Creek, Rucker Creek, and Bear River, in Nevada, Placer and Sierra 
Counties, California. The project would affect 1,541 acres of federal 
lands managed by the U.S. Forest Service (Tahoe National Forest) and 
209 acres managed by the Bureau of Land Management (Sierra Resource 
Management Area).
    g. Filed Pursuant to: Federal Power Act 16 USC 791 (a)-825(r) .
    h. Applicant Contact: Ron Nelson, General Manager, Nevada 
Irrigation District, 1036 West Main Street, Grass Valley, CA 95945, 
(530) 271-6824 or email nelson@nid.dst.ca.us.
    i. FERC Contact: Alan Mitchnick, (202) 502-6074 or 
alan.mitchnick@ferc.gov
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
prescriptions: April 30, 2012; reply comments are due no later than 
June 13, 2012.
    Motions to intervene, protests, comments, recommendations, 
preliminary terms and conditions, and preliminary fishway prescriptions 
may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-(866) 208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The project consists of four developments--Bowman, Dutch Flat, 
Chicago Park, and Rollins--which, in total, include: 13 main dams with 
a combined gross storage capacity of 207,865 acre-feet of water; four 
water

[[Page 3757]]

conduits; five diversion dams; four powerhouses with a combined 
installed capacity of 79.32 megawatts; one 9.0-mile-long, 60-kilovolt 
transmission line; and appurtenant facilities and structures, including 
recreation facilities.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at - using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits (P-2266) in the docket 
number field to access the document. For assistance, contact FERC 
Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    o. Procedural Schedule:
    The application will be processed according to the following 
revised Hydro Licensing Schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
              Milestone                               Date
------------------------------------------------------------------------
Filing of recommendations,             April 30, 2012.
 preliminary terms and conditions,
 and preliminary fishway
 prescriptions.
Commission issues Draft Environmental  December 26, 2012.
 Impact Statement (EIS).
Comments on Draft EIS................  February 24, 2013.
Modified Terms and Conditions........  April 25, 2013.
Commission Issues Final EIS..........  July 24, 2013.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 60 days from the issuance date of this notice.
    q. A license applicant must file no later than 60 days following 
the date of issuance of the notice of acceptance and ready for 
environmental analysis provided for in 5.22: (1) A copy of the water 
quality certification; (2) a copy of the request for certification, 
including proof of the date on which the certifying agency received the 
request; or (3) evidence of waiver of water quality certification.

    Dated: January 19, 2012.
 Kimberly D. Bose,
 Secretary .
[FR Doc. 2012-1473 Filed 1-24-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.