Download as PDF 3759 Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices Dated: January 17, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–1411 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission srobinson on DSK4SPTVN1PROD with NOTICES Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–21–002. Applicants: Agua Caliente Solar, LLC. Description: Clarification of Notice of Change in Status for Agua Caliente. Filed Date: 1/13/12. Accession Number: 20120113–5365. Comments Due: 5 p.m. ET 1/27/12. Docket Numbers: ER12–33–001. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. submits tariff filing per 35: 01–17–12 Schedule 10–G Compliance Filing to be effective 12/31/2011. Filed Date: 1/17/12. Accession Number: 20120117–5011. Comments Due: 5 p.m. ET 2/7/12. Docket Numbers: ER12–101–001. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc. submits tariff filing per 35: C004–P11 FCA Compliance (1–17–12) to be effective 10/18/2011. Filed Date: 1/17/12. Accession Number: 20120117–5118. Comments Due: 5 p.m. ET 2/7/12. Docket Numbers: ER12–109–000. Applicants: Arizona Public Service Company. Description: Arizona Public Service Company submits tariff filing per 35.19a(b): Refund Calculations—NTUA, Dry Lake Wind, Dry Lake Wind II and Glendale Energy to be effective N/A. Filed Date: 1/17/12. Accession Number: 20120117–5143. Comments Due: 5 p.m. ET 2/7/12. Docket Numbers: ER12–110–000. Applicants: Arizona Public Service Company. Description: Arizona Public Service Company submits tariff filing per 35.19a(b): Refund for Rate Schedule 255 with Luke Air Force Base to be effective N/A. Filed Date: 1/17/12. Accession Number: 20120117–5142. Comments Due: 5 p.m. ET 2/7/12. Docket Numbers: ER12–281–001. VerDate Mar<15>2010 18:09 Jan 24, 2012 Jkt 226001 Applicants: Northampton Generating Company, L.P. Description: Northampton Generating Company, L.P. submits tariff filing per 35: Northampton First Revised MBR Tariff to be effective 1/18/2012. Filed Date: 1/17/12. Accession Number: 20120117–5186. Comments Due: 5 p.m. ET 2/7/12. Docket Numbers: ER12–372–000. Applicants: ITC Midwest LLC. Description: ITC Midwest LLC submits tariff filing per 35.19a(b): Filing of Refund Report to be effective N/A. Filed Date: 1/17/12. Accession Number: 20120117–5159. Comments Due: 5 p.m. ET 2/7/12. Docket Numbers: ER12–815–000. Applicants: Duke Energy Vermillion II, LLC. Description: Duke Energy Vermillion II, LLC submits tariff filing per 35.15: Cancellation of Tariff Database to be effective 1/17/2012. Filed Date: 1/17/12. Accession Number: 20120117–5012. Comments Due: 5 p.m. ET 2/7/12. Docket Numbers: ER12–816–000. Applicants: PJM Interconnection, L.L.C., American Electric Power Service Corporation. Description: PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: AEPSC submits 30th Revised SA No. 1336 among AEPSC & Buckeye to be effective 1/18/2012. Filed Date: 1/17/12. Accession Number: 20120117–5198. Comments Due: 5 p.m. ET 2/7/12. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH12–6–000. Applicants: IIF US Holding 2 GP, LLC. Description: Notification of Material Change in Facts and Update of FERC 65–A Notification of Exemption of IIF US Holding 2 GP, LLC. Filed Date: 1/17/12. Accession Number: 20120117–5099. Comments Due: 5 p.m. ET 2/7/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 17, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–1425 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Agua Caliente Solar, LLC .. Windpower Partners 1993, L.P.. South Chestnut LLC .......... Sandy Creek Energy Associates, L.P. AES New Creek, LLC ........ Coram California Development, L.P. Manzana Wind LLC ........... NaturEner Rim Rock Wind Energy, LLC. EG12–1–000 EG12–2–000 EG12–3–000 EG12–4–000 EG12–5–000 EG12–6–000 EG12–7–000 EG12–8–000 Take notice that during the month of December 2011, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Dated: January 19, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–1477 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Project No. FFP Project 30, LLC ................... Northland Power Mississippi River LLC ................................ 12927–002 14075–000 On January 17, 2012, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others E:\FR\FM\25JAN1.SGM 25JAN1 3760 Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: 1. FFP Project 30, LLC; Project No. 12927–002. 2. Northland Power Mississippi River LLC; Project No. 14075–000. DEPARTMENT OF ENERGY On January 17, 2012, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: 1. Northland Power Mississippi River LLC; Project No. 14079–000. 2. FFP Project 40, LLC; Project No. 12929–002. Federal Energy Regulatory Commission Dated: January 18, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. Dated: January 18, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–1415 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P Notice Announcing Filing Priority for Preliminary Permit Applications [FR Doc. 2012–1413 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P Project No. DEPARTMENT OF ENERGY FFP Project 39, LLC ................... Northland Power Mississippi River LLC ................................ 12925–002 14078–000 On January 17, 2012, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: 1. FFP Project 39, LLC; Project No. 12925–002. 2. Northland Power Mississippi River LLC; Project No. 14078–000. Dated: January 18, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–1414 Filed 1–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY srobinson on DSK4SPTVN1PROD with NOTICES Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Project No. FFP Project 40, LLC ................... Northland Power Mississippi River LLC ................................ VerDate Mar<15>2010 18:09 Jan 24, 2012 Notice Announcing Filing Priority for Preliminary Permit Applications Project No. FFP Project 17, LLC ................... Northland Power Mississippi River LLC ................................ 12865–002 14072–000 On January 17, 2012, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: 1. Northland Power Mississippi River LLC; Project No. 14072–000. 2. FFP Project 17, LLC; Project No. 12865–002. Dated: January 18, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–1420 Filed 1–24–12; 8:45 am] 12930–002 14080–000 On January 17, 2012, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: 1. FFP Project 41, LLC; Project No. 12930–002. 2. Northland Power Mississippi River LLC; Project No. 14080–000. Dated: January 18, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. BILLING CODE 6717–01–P 12929–002 14079–000 Jkt 226001 Federal Energy Regulatory Commission BILLING CODE 6717–01–P FFP Project 41, LLC ................... Northland Power Mississippi River LLC ................................ [FR Doc. 2012–1412 Filed 1–24–12; 8:45 am] Project No. DEPARTMENT OF ENERGY PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Project No. FFP Project 21, LLC ................... Northland Power Mississippi River LLC ................................ 12863–002 14074–000 On January 17, 2012, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: 1. Northland Power Mississippi River LLC; Project No. 14074–000. 2. FFP Project 21, LLC; Project No. 12863–002. E:\FR\FM\25JAN1.SGM 25JAN1

Agencies

[Federal Register Volume 77, Number 16 (Wednesday, January 25, 2012)]
[Notices]
[Pages 3759-3760]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-1415]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice Announcing Filing Priority for Preliminary Permit 
Applications

------------------------------------------------------------------------
                                                                Project
                                                                  No.
------------------------------------------------------------------------
FFP Project 30, LLC.........................................   12927-002
Northland Power Mississippi River LLC.......................   14075-000
------------------------------------------------------------------------

    On January 17, 2012, the Commission held a drawing to determine 
priority among competing preliminary permit applications with identical 
filing times. In the event that the Commission concludes that none of 
the applicants' plans are better adapted than the others

[[Page 3760]]

to develop, conserve, and utilize in the public interest the water 
resources of the region at issue, the priority established by this 
drawing will serve as the tiebreaker. Based on the drawing, the order 
of priority is as follows:
    1. FFP Project 30, LLC; Project No. 12927-002.
    2. Northland Power Mississippi River LLC; Project No. 14075-000.

    Dated: January 18, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-1415 Filed 1-24-12; 8:45 am]
BILLING CODE 6717-01-P