Notice Announcing Filing Priority for Preliminary Permit Applications, 3759-3760 [2012-1415]
Download as PDF
3759
Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices
Dated: January 17, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–1411 Filed 1–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
srobinson on DSK4SPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–21–002.
Applicants: Agua Caliente Solar, LLC.
Description: Clarification of Notice of
Change in Status for Agua Caliente.
Filed Date: 1/13/12.
Accession Number: 20120113–5365.
Comments Due: 5 p.m. ET 1/27/12.
Docket Numbers: ER12–33–001.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35: 01–17–12
Schedule 10–G Compliance Filing to be
effective 12/31/2011.
Filed Date: 1/17/12.
Accession Number: 20120117–5011.
Comments Due: 5 p.m. ET 2/7/12.
Docket Numbers: ER12–101–001.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35: C004–P11
FCA Compliance (1–17–12) to be
effective 10/18/2011.
Filed Date: 1/17/12.
Accession Number: 20120117–5118.
Comments Due: 5 p.m. ET 2/7/12.
Docket Numbers: ER12–109–000.
Applicants: Arizona Public Service
Company.
Description: Arizona Public Service
Company submits tariff filing per
35.19a(b): Refund Calculations—NTUA,
Dry Lake Wind, Dry Lake Wind II and
Glendale Energy to be effective N/A.
Filed Date: 1/17/12.
Accession Number: 20120117–5143.
Comments Due: 5 p.m. ET 2/7/12.
Docket Numbers: ER12–110–000.
Applicants: Arizona Public Service
Company.
Description: Arizona Public Service
Company submits tariff filing per
35.19a(b): Refund for Rate Schedule 255
with Luke Air Force Base to be effective
N/A.
Filed Date: 1/17/12.
Accession Number: 20120117–5142.
Comments Due: 5 p.m. ET 2/7/12.
Docket Numbers: ER12–281–001.
VerDate Mar<15>2010
18:09 Jan 24, 2012
Jkt 226001
Applicants: Northampton Generating
Company, L.P.
Description: Northampton Generating
Company, L.P. submits tariff filing per
35: Northampton First Revised MBR
Tariff to be effective 1/18/2012.
Filed Date: 1/17/12.
Accession Number: 20120117–5186.
Comments Due: 5 p.m. ET 2/7/12.
Docket Numbers: ER12–372–000.
Applicants: ITC Midwest LLC.
Description: ITC Midwest LLC
submits tariff filing per 35.19a(b): Filing
of Refund Report to be effective N/A.
Filed Date: 1/17/12.
Accession Number: 20120117–5159.
Comments Due: 5 p.m. ET 2/7/12.
Docket Numbers: ER12–815–000.
Applicants: Duke Energy Vermillion
II, LLC.
Description: Duke Energy Vermillion
II, LLC submits tariff filing per 35.15:
Cancellation of Tariff Database to be
effective 1/17/2012.
Filed Date: 1/17/12.
Accession Number: 20120117–5012.
Comments Due: 5 p.m. ET 2/7/12.
Docket Numbers: ER12–816–000.
Applicants: PJM Interconnection,
L.L.C., American Electric Power Service
Corporation.
Description: PJM Interconnection,
L.L.C. submits tariff filing per
35.13(a)(2)(iii: AEPSC submits 30th
Revised SA No. 1336 among AEPSC &
Buckeye to be effective 1/18/2012.
Filed Date: 1/17/12.
Accession Number: 20120117–5198.
Comments Due: 5 p.m. ET 2/7/12.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH12–6–000.
Applicants: IIF US Holding 2 GP,
LLC.
Description: Notification of Material
Change in Facts and Update of FERC
65–A Notification of Exemption of IIF
US Holding 2 GP, LLC.
Filed Date: 1/17/12.
Accession Number: 20120117–5099.
Comments Due: 5 p.m. ET 2/7/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 17, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–1425 Filed 1–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Docket Nos.
Agua Caliente Solar, LLC ..
Windpower Partners 1993,
L.P..
South Chestnut LLC ..........
Sandy Creek Energy Associates, L.P.
AES New Creek, LLC ........
Coram California Development, L.P.
Manzana Wind LLC ...........
NaturEner Rim Rock Wind
Energy, LLC.
EG12–1–000
EG12–2–000
EG12–3–000
EG12–4–000
EG12–5–000
EG12–6–000
EG12–7–000
EG12–8–000
Take notice that during the month of
December 2011, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: January 19, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–1477 Filed 1–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Filing Priority for
Preliminary Permit Applications
Project No.
FFP Project 30, LLC ...................
Northland Power Mississippi
River LLC ................................
12927–002
14075–000
On January 17, 2012, the Commission
held a drawing to determine priority
among competing preliminary permit
applications with identical filing times.
In the event that the Commission
concludes that none of the applicants’
plans are better adapted than the others
E:\FR\FM\25JAN1.SGM
25JAN1
3760
Federal Register / Vol. 77, No. 16 / Wednesday, January 25, 2012 / Notices
to develop, conserve, and utilize in the
public interest the water resources of
the region at issue, the priority
established by this drawing will serve as
the tiebreaker. Based on the drawing,
the order of priority is as follows:
1. FFP Project 30, LLC; Project No.
12927–002.
2. Northland Power Mississippi River
LLC; Project No. 14075–000.
DEPARTMENT OF ENERGY
On January 17, 2012, the Commission
held a drawing to determine priority
among competing preliminary permit
applications with identical filing times.
In the event that the Commission
concludes that none of the applicants’
plans are better adapted than the others
to develop, conserve, and utilize in the
public interest the water resources of
the region at issue, the priority
established by this drawing will serve as
the tiebreaker. Based on the drawing,
the order of priority is as follows:
1. Northland Power Mississippi River
LLC; Project No. 14079–000.
2. FFP Project 40, LLC; Project No.
12929–002.
Federal Energy Regulatory
Commission
Dated: January 18, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: January 18, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–1415 Filed 1–24–12; 8:45 am]
BILLING CODE 6717–01–P
Notice Announcing Filing Priority for
Preliminary Permit Applications
[FR Doc. 2012–1413 Filed 1–24–12; 8:45 am]
BILLING CODE 6717–01–P
Project No.
DEPARTMENT OF ENERGY
FFP Project 39, LLC ...................
Northland Power Mississippi
River LLC ................................
12925–002
14078–000
On January 17, 2012, the Commission
held a drawing to determine priority
among competing preliminary permit
applications with identical filing times.
In the event that the Commission
concludes that none of the applicants’
plans are better adapted than the others
to develop, conserve, and utilize in the
public interest the water resources of
the region at issue, the priority
established by this drawing will serve as
the tiebreaker. Based on the drawing,
the order of priority is as follows:
1. FFP Project 39, LLC; Project No.
12925–002.
2. Northland Power Mississippi River
LLC; Project No. 14078–000.
Dated: January 18, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–1414 Filed 1–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
srobinson on DSK4SPTVN1PROD with NOTICES
Federal Energy Regulatory
Commission
Notice Announcing Filing Priority for
Preliminary Permit Applications
Federal Energy Regulatory
Commission
Notice Announcing Filing Priority for
Preliminary Permit Applications
Project No.
FFP Project 40, LLC ...................
Northland Power Mississippi
River LLC ................................
VerDate Mar<15>2010
18:09 Jan 24, 2012
Notice Announcing Filing Priority for
Preliminary Permit Applications
Project No.
FFP Project 17, LLC ...................
Northland Power Mississippi
River LLC ................................
12865–002
14072–000
On January 17, 2012, the Commission
held a drawing to determine priority
among competing preliminary permit
applications with identical filing times.
In the event that the Commission
concludes that none of the applicants’
plans are better adapted than the others
to develop, conserve, and utilize in the
public interest the water resources of
the region at issue, the priority
established by this drawing will serve as
the tiebreaker. Based on the drawing,
the order of priority is as follows:
1. Northland Power Mississippi River
LLC; Project No. 14072–000.
2. FFP Project 17, LLC; Project No.
12865–002.
Dated: January 18, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–1420 Filed 1–24–12; 8:45 am]
12930–002
14080–000
On January 17, 2012, the Commission
held a drawing to determine priority
among competing preliminary permit
applications with identical filing times.
In the event that the Commission
concludes that none of the applicants’
plans are better adapted than the others
to develop, conserve, and utilize in the
public interest the water resources of
the region at issue, the priority
established by this drawing will serve as
the tiebreaker. Based on the drawing,
the order of priority is as follows:
1. FFP Project 41, LLC; Project No.
12930–002.
2. Northland Power Mississippi River
LLC; Project No. 14080–000.
Dated: January 18, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
12929–002
14079–000
Jkt 226001
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
FFP Project 41, LLC ...................
Northland Power Mississippi
River LLC ................................
[FR Doc. 2012–1412 Filed 1–24–12; 8:45 am]
Project No.
DEPARTMENT OF ENERGY
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Filing Priority for
Preliminary Permit Applications
Project No.
FFP Project 21, LLC ...................
Northland Power Mississippi
River LLC ................................
12863–002
14074–000
On January 17, 2012, the Commission
held a drawing to determine priority
among competing preliminary permit
applications with identical filing times.
In the event that the Commission
concludes that none of the applicants’
plans are better adapted than the others
to develop, conserve, and utilize in the
public interest the water resources of
the region at issue, the priority
established by this drawing will serve as
the tiebreaker. Based on the drawing,
the order of priority is as follows:
1. Northland Power Mississippi River
LLC; Project No. 14074–000.
2. FFP Project 21, LLC; Project No.
12863–002.
E:\FR\FM\25JAN1.SGM
25JAN1
Agencies
[Federal Register Volume 77, Number 16 (Wednesday, January 25, 2012)]
[Notices]
[Pages 3759-3760]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-1415]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice Announcing Filing Priority for Preliminary Permit
Applications
------------------------------------------------------------------------
Project
No.
------------------------------------------------------------------------
FFP Project 30, LLC......................................... 12927-002
Northland Power Mississippi River LLC....................... 14075-000
------------------------------------------------------------------------
On January 17, 2012, the Commission held a drawing to determine
priority among competing preliminary permit applications with identical
filing times. In the event that the Commission concludes that none of
the applicants' plans are better adapted than the others
[[Page 3760]]
to develop, conserve, and utilize in the public interest the water
resources of the region at issue, the priority established by this
drawing will serve as the tiebreaker. Based on the drawing, the order
of priority is as follows:
1. FFP Project 30, LLC; Project No. 12927-002.
2. Northland Power Mississippi River LLC; Project No. 14075-000.
Dated: January 18, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-1415 Filed 1-24-12; 8:45 am]