Federal Register / Vol. 77, No. 14 / Monday, January 23, 2012 / Notices
SUSQUEHANNA RIVER BASIN
COMMISSION
Public Hearing
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
The Susquehanna River Basin
Commission will hold a public hearing
on February 16, 2012, in Harrisburg,
Pennsylvania. At this public hearing,
the Commission will hear testimony on
the projects listed in the Supplementary
Information section of this notice. Such
projects are intended to be scheduled
for Commission action at its next
business meeting, tentatively scheduled
for March 15, 2012, which will be
noticed separately. Included in the list
of projects scheduled for comment at
the public hearing are both new projects
and certain projects that were acted
upon at the Commission’s December 15,
2011, public hearing held in WilkesBarre, Pennsylvania. The Commission is
affording this opportunity for additional
comment due to the disruptive behavior
of certain individuals that prevented
many interested persons from being able
to offer testimony at the December 15,
2011, public hearing. To give due
consideration of any new oral or written
comment received on such projects, the
Commission will reconsider, at its
March 2012, meeting, the actions taken
on December 15, 2011. Details
concerning the list of all projects that
are the subject of the public hearing are
contained in the SUPPLEMENTARY
INFORMATION section of this notice. The
public should take note that this public
hearing will be the only opportunity to
offer oral comment to the Commission
for the listed projects. There will be no
opportunity for further comment on
these projects at the Commission’s
business meeting in March 2012, where
the Commission is expected to take
action thereon. The deadline for written
comments on all such projects is
February 27, 2012.
DATES: The public hearing will convene
on February 16, 2012, at 2:30 p.m.
Written comments on the listed projects
are due on or before February 27, 2012.
ADDRESSES: The public hearing will be
conducted at the Pennsylvania State
Capitol, Room 8E–B, East Wing,
Commonwealth Avenue, Harrisburg, Pa.
FOR FURTHER INFORMATION CONTACT:
Richard A. Cairo, General Counsel,
telephone: (717) 238–0423, ext. 306; fax:
(717) 238–2436; email: rcairo@srbc.net
or Stephanie L. Richardson, Secretary to
the Commission, telephone: (717) 238–
0423, ext. 304; fax: (717) 238–2436;
email: srichardson@srbc.net.
TKELLEY on DSK3SPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:58 Jan 20, 2012
Jkt 226001
Information concerning the applications
for these projects is available at the
SRBC Water Resource Portal at www.
srbc.net/wrp. Materials and supporting
documents are available to inspect and
copy in accordance with the
Commission’s Access to Records Policy
at www.srbc.net/pubinfo/docs/200902%20Access%20to%20Records%20
Policy%209-10-09.PDF.
SUPPLEMENTARY INFORMATION: The
public hearing will cover the following
projects:
Projects Originally Considered at the
December 15, 2011, Public Hearing
1. Project Sponsor: Anadarko E&P
Company LP. Project Facility: Sproul
State Forest—Council Run, Snow Shoe
Township, Centre County, Pa.
Application for groundwater
withdrawal of up to 0.715 mgd (30-day
average) from Well PW–11.
2. Project Sponsor: Bioenergy
International, LLC. Project Facility:
Bionol Clearfield, LLC, Clearfield
Borough, Clearfield County, Pa.
Modification to conditions of the
surface water withdrawal approval
(Docket No. 20070904).
3. Project Sponsor: Borough of
Ephrata. Project Facility: Ephrata Area
Joint Authority, Ephrata Borough,
Lancaster County, Pa. Modification to
conditions of the groundwater
withdrawal approval (Docket No.
20110902).
4. Project Sponsor and Facility:
Carrizo (Marcellus), LLC (Mosquito
Creek–2), Karthaus Township,
Clearfield County, Pa. Application for
surface water withdrawal of up to 2.160
mgd.
5. Project Sponsor and Facility:
Central New York Oil and Gas
Company, LLC (Susquehanna River),
Wilmot Township, Bradford County, Pa.
Application for surface water
withdrawal of up to 0.540 mgd.
6. Project Sponsor and Facility:
Central New York Oil and Gas
Company, LLC, Wilmot Township,
Bradford County, Pa. Application for
consumptive water use of up to 0.105
mgd.
7. Project Sponsor and Facility:
Chesapeake Appalachia, LLC
(Susquehanna River—Babcock), Ulster
Township, Bradford County, Pa.
Application for surface water
withdrawal of up to 3.000 mgd.
8. Project Sponsor and Facility:
Chesapeake Appalachia, LLC
(Susquehanna River—Elmglade),
Wilmot Township, Bradford County, Pa.
Application for surface water
withdrawal of up to 2.016 mgd.
9. Project Sponsor and Facility:
Chesapeake Appalachia, LLC (Towanda
PO 00000
Frm 00096
Fmt 4703
Sfmt 4703
3321
Creek—Sechrist), Canton Township,
Bradford County, Pa. Application for
surface water withdrawal of up to 0.504
mgd.
10. Project Sponsor: Clark Trucking,
LLC. Project Facility: Northeast Division
(Lycoming Creek), Lewis Township,
Lycoming County, Pa. Application for
surface water withdrawal of up to 0.500
mgd.
11. Project Sponsor: Clark Trucking,
LLC. Project Facility: Northeast Division
(Muncy Creek), Muncy Creek Township,
Lycoming County, Pa. Application for
surface water withdrawal of up to 0.700
mgd.
12. Project Sponsor and Facility:
Dunn Lake LLC (Dunn Pond), Ararat
Township, Susquehanna County, Pa.
Application for surface water
withdrawal of up to 0.999 mgd.
13. Project Sponsor and Facility:
EXCO Resources (PA), LLC (Muncy
Creek—McClintock), Penn Township,
Lycoming County, Pa. Application for
surface water withdrawal of up to 1.500
mgd.
14. Project Sponsor: Glenn O.
Hawbaker, Inc. Project Facility: Greens
Landing Aggregate Plant, Athens
Township, Bradford County, Pa.
Application for surface water
withdrawal of up to 0.249 mgd.
15. Project Sponsor: Glenn O.
Hawbaker, Inc. Project Facility: Greens
Landing Aggregate Plant, Athens
Township, Bradford County, Pa.
Application for consumptive water use
of up to 0.249 mgd.
16. Project Sponsor: Hazleton Creek
Properties, LLC. Project Facility:
Hazleton Mine Reclamation, Hazleton
City, Luzerne County, Pa. Modification
to increase groundwater withdrawal by
an additional 0.145 mgd, for a total of
0.200 mgd (30-day average) (Docket No.
20110307).
17. Project Sponsor and Facility:
Keystone Clearwater Solutions, LLC
(Babb Creek), Morris Township, Tioga
County, Pa. Application for surface
water withdrawal of up to 0.950 mgd.
18. Project Sponsor and Facility:
Stanley S. Karp Sr. (Tunkhannock
Creek), Nicholson Township, Wyoming
County, Pa. Application for surface
water withdrawal of up to 0.510 mgd.
19. Project Sponsor and Facility:
Sugar Hollow Trout Park and Hatchery,
Eaton Township, Wyoming County, Pa.
Modification to project features and
conditions of the groundwater
withdrawal approval (Docket No.
20100913).
20. Project Sponsor and Facility:
Sugar Hollow Water Services, LLC
(Susquehanna River—Chellis), Eaton
Township, Wyoming County, Pa.
E:\FR\FM\23JAN1.SGM
23JAN1
3322
Federal Register / Vol. 77, No. 14 / Monday, January 23, 2012 / Notices
Application for surface water
withdrawal of up to 1.500 mgd.
21. Project Sponsor: The Municipal
Authority of the Borough of Berlin.
Project Facility: Berlin Borough
Municipal Authority, Allegheny
Township, Somerset County, Pa.
Modification to conditions of the
groundwater withdrawal approval
(Docket No. 19980702).
22. Project Sponsor and Facility:
Walker Township Water Association,
Walker Township, Centre County, Pa.
Modification to increase the total
groundwater system withdrawal limit
from 0.523 mgd to 0.753 mgd (30-day
average) (Docket No. 20070905).
23. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Middle Branch Wyalusing Creek),
Forest Lake Township, Susquehanna
County, Pa. Application for surface
water withdrawal of up to 0.750 mgd.
24. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Snake Creek-2), Franklin Township,
Susquehanna County, Pa. Application
for surface water withdrawal of up to
0.999 mgd.
25. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Susquehanna River), Great Bend
Township, Susquehanna County, Pa.
Commission-initiated modification to
project features and conditions of the
surface water withdrawal approval
(Docket No. 20090303), making a
correction and reducing the approved
surface water withdrawal amount from
3.00 mgd to 1.00 mgd.
26. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Susquehanna River-2), Great Bend
Township, Susquehanna County, Pa.
Application for surface water
withdrawal of up to 2.000 mgd.
Additional Project for Rescission
Action
1. Project Sponsor and Facility: Texas
Eastern Transmission LP (Susquehanna
River) (Docket No. 20110314), East
Donegal Township, Lancaster County,
Pa.
TKELLEY on DSK3SPTVN1PROD with NOTICES
Additional Projects
1. Project Sponsor and Facility:
Anadarko E&P Company LP (Lycoming
Creek), Lewis Township, Lycoming
County, Pa. Application for surface
water withdrawal of up to 1.340 mgd
(peak day).
2. Project Sponsor and Facility: Aqua
Infrastructure, LLC (West Branch
Susquehanna River), Piatt Township,
Lycoming County, Pa. Application for
surface water withdrawal of up to 3.000
mgd (peak day).
VerDate Mar<15>2010
17:58 Jan 20, 2012
Jkt 226001
3. Project Sponsor and Facility: Aqua
Resources, Inc. (Susquehanna River),
Athens Township, Bradford County, Pa.
Application for surface water
withdrawal of up to 0.900 mgd (peak
day).
4. Project Sponsor and Facility: Black
Bear Waters, LLC (Lycoming Creek),
Lewis Township, Lycoming County, Pa.
Application for surface water
withdrawal of up to 0.400 mgd (peak
day).
5. Project Sponsor and Facility:
Blossburg Municipal Authority, Bloss
Township, Tioga County, Pa.
Application for groundwater
withdrawal of up to 0.396 mgd (30-day
average) from Route 15 Well.
6. Project Sponsor and Facility: Buck
Ridge Stone, LLC (Salt Lick Creek), New
Milford Township, Susquehanna
County, Pa. Modification to increase
surface water withdrawal by an
additional 0.637 mgd, for a total of 0.720
mgd (peak day) (Docket No. 20100905).
7. Project Sponsor and Facility: Cabot
Oil & Gas Corporation (Susquehanna
River), Susquehanna Depot Borough,
Susquehanna County, Pa. Modification
to increase surface water withdrawal by
an additional 0.780 mgd, for a total of
1.500 mgd (peak day) (Docket No.
20080908).
8. Project Sponsor and Facility: Cabot
Oil & Gas Corporation (Susquehanna
River), Great Bend Borough,
Susquehanna County, Pa. Modification
to increase surface water withdrawal by
an additional 1.280 mgd, for a total of
2.000 mgd (peak day) (Docket No.
20080905).
9. Project Sponsor and Facility:
Carrizo (Marcellus), LLC (Middle
Branch Wyalusing Creek), Forest Lake
Township, Susquehanna County, Pa.
Modification to conditions of the
surface water withdrawal approval
(Docket No. 20110604).
10. Project Sponsor and Facility:
Carrizo (Marcellus), LLC (Moshannon
Creek), Decatur Township, Clearfield
County, Pa. Application for surface
water withdrawal of up to 2.590 mgd
(peak day).
11. Project Sponsor and Facility:
Carrizo (Marcellus), LLC (Unnamed
Tributary of Middle Branch Wyalusing
Creek), Forest Lake Township,
Susquehanna County, Pa. Modification
to conditions of the surface water
withdrawal approval (Docket No.
20110605).
12. Project Sponsor and Facility:
Empire Kosher Poultry, Inc., Walker
Township, Juniata County, Pa.
Modification to increase total
groundwater system withdrawal by an
additional 0.499 mgd, for a total of 1.269
PO 00000
Frm 00097
Fmt 4703
Sfmt 4703
mgd (30-day average) (Docket No.
20030809).
13. Project Sponsor and Facility: EQT
Production Company (Bennett Branch
Power), Jay Township, Elk County, Pa.
Application for surface water
withdrawal of up to 2.500 mgd (peak
day).
14. Project Sponsor and Facility: EQT
Production Company (Wilson Creek),
Duncan Township, Tioga County, Pa.
Application for surface water
withdrawal of up to 0.740 mgd (peak
day).
15. Project Sponsor: IBM Corporation.
Project Facility: Endicott Facility,
Village of Endicott, Broome County,
N.Y. Modification to increase total
groundwater system withdrawal by an
additional 0.499 mgd, for a total of 1.509
mgd (30-day average) (Docket No.
20090329).
16. Project Sponsor and Facility: Jo Jo
Oil Company, Inc. (Tunkhannock
Creek), Tunkhannock Township,
Wyoming County, Pa. Application for
surface water withdrawal of up to 0.999
mgd (peak day).
17. Project Sponsor and Facility:
Keystone Landfill, Inc., Dunmore
Borough, Lackawanna County, Pa.
Modification to increase groundwater
withdrawal by an additional 0.150 mgd,
for a total of 0.160 mgd (30-day average)
(Docket No. 20080611).
18. Project Sponsor and Facility:
Keystone Landfill, Inc., Dunmore
Borough, Lackawanna County, Pa.
Modification to increase consumptive
water use by an additional 0.260 mgd,
for a total of up to 0.360 mgd (30-day
average) (Docket No. 20080611).
19. Project Sponsor and Facility:
Northwestern Lancaster County
Authority, Penn Township, Lancaster
County, Pa. Application for
groundwater withdrawal of up to 0.324
mgd (30-day average) from Well 2.
20. Project Sponsor and Facility:
Northwestern Lancaster County
Authority, Penn Township, Lancaster
County, Pa. Application for
groundwater withdrawal of up to 1.000
mgd (30-day average) from Well 3.
21. Project Sponsor: Pine Creek
Municipal Authority. Project Facility:
Wastewater Treatment Plant, Pine Creek
Township, Clinton County, Pa.
Application for withdrawal of treated
wastewater effluent of up to 0.999 mgd.
22. Project Sponsor and Facility:
Roaring Spring Water—Division of
Roaring Spring Blank Book (Roaring
Spring), Roaring Spring Borough, Blair
County, Pa. Application for surface
water withdrawal of up to 0.302 mgd
(peak day).
23. Project Sponsor and Facility:
Roaring Spring Water—Division of
E:\FR\FM\23JAN1.SGM
23JAN1
TKELLEY on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 14 / Monday, January 23, 2012 / Notices
Roaring Spring Blank Book, Roaring
Spring Borough, Blair County, Pa.
Application for consumptive water use
of up to 0.255 mgd (30-day average).
24. Project Sponsor and Facility:
Southwestern Energy Production
Company (Blockhouse Creek), Jackson
Township, Lycoming County, Pa.
Application for surface water
withdrawal of up to 0.999 mgd (peak
day).
25. Project Sponsor and Facility:
Southwestern Energy Production
Company (East Branch Tunkhannock
Creek), Lenox Township, Susquehanna
County, Pa. Application for surface
water withdrawal of up to 1.500 mgd
(peak day).
26. Project Sponsor and Facility:
Southwestern Energy Production
Company (Susquehanna River), Oakland
Township, Susquehanna County, Pa.
Application for surface water
withdrawal of up to 3.000 mgd (peak
day).
27. Project Sponsor and Facility:
Southwestern Energy Production
Company (Tunkhannock Creek), Lenox
Township, Susquehanna County, Pa.
Application for surface water
withdrawal of up to 1.500 mgd (peak
day).
28. Project Sponsor and Facility:
Stanley S. Karp Sr. (Tunkhannock
Creek), Nicholson Township, Wyoming
County, Pa. Application for surface
water withdrawal of up to 0.510 mgd
(peak day).
29. Project Sponsor and Facility:
SWEPI LP (Cowanesque River—
Egleston), Nelson Township, Tioga
County, Pa. Modification to increase
surface water withdrawal by an
additional 0.267 mgd, for a total of 0.534
mgd (peak day) (Docket No. 20100604).
30. Project Sponsor: Viking Energy of
Northumberland, LLC. Project Facility:
Power Plant, Point Township,
Northumberland County, Pa.
Application for consumptive water use
of up to 0.387 mgd (30-day average).
31. Project Sponsor: Viking Energy of
Northumberland, LLC. Project Facility:
Power Plant, Point Township,
Northumberland County, Pa.
Application for groundwater
withdrawal of up to 0.172 mgd from
Well 1, and a total system withdrawal
limit of up to 0.391 mgd (30-day
average).
32. Project Sponsor: Viking Energy of
Northumberland, LLC. Project Facility:
Power Plant, Point Township,
Northumberland County, Pa.
Application for groundwater
withdrawal of up to 0.172 mgd from
Well 2, and a total system withdrawal
limit of up to 0.391 mgd (30-day
average).
VerDate Mar<15>2010
17:58 Jan 20, 2012
Jkt 226001
33. Project Sponsor: Viking Energy of
Northumberland, LLC. Project Facility:
Power Plant, Point Township,
Northumberland County, Pa.
Application for groundwater
withdrawal of up to 0.172 mgd from
Well 4, and a total system withdrawal
limit of up to 0.391 mgd (30-day
average).
34. Project Sponsor and Facility:
Water Treatment Solutions, LLC (South
Mountain Lake), Wood Township,
Lycoming County, Pa. Application for
surface water withdrawal of up to 0.499
mgd (peak day).
Opportunity To Appear and Comment
Interested parties may appear at the
hearing to offer comments to the
Commission on any project listed above.
The presiding officer reserves the right
to limit oral statements in the interest of
time and to otherwise control the course
of the hearing. Ground rules for the
hearing will be clearly stated prior to
the hearing and disruptive behavior will
not be tolerated. Ground rules will be
posted on the Commission’s Web site,
www.srbc.net, prior to the hearing for
review. The presiding officer reserves
the right to modify or supplement such
rules at the hearing. Written comments
on any project listed above may also be
mailed to the Susquehanna River Basin
Commission, 1721 North Front Street,
Harrisburg, Pa. 17102–2391, or
submitted electronically to Richard A.
Cairo, General Counsel, rcairo@srbc.net,
or Stephanie L. Richardson, Secretary to
the Commission, srichardson@srbc.net.
Comments mailed or electronically
submitted must be received by the
Commission on or before February 27,
2012, to be considered.
Authority: Pub. L. 91–575, 84 Stat. 1509
et seq., 18 CFR parts 806–808.
Dated: January 12, 2012.
Thomas W. Beauduy,
Deputy Executive Director.
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Office of the Secretary
Applications of Universal Jet Aviation,
Inc. for Certificate Authority
Department of Transportation.
Notice of Order to Show Cause
(Order 2012–1–11); Dockets DOT–OST–
2011–0150 and DOT–OST–2011–0151.
AGENCY:
ACTION:
The Department of
Transportation is directing all interested
persons to show cause why it should
not issue orders finding Universal Jet
SUMMARY:
PO 00000
Frm 00098
Fmt 4703
Sfmt 4703
Aviation, Inc., fit, willing, and able, and
to provide interstate and foreign charter
air transportation of persons, property
and mail, using one large aircraft.
DATES: Persons wishing to file
objections should do so no later than
January 31, 2012.
ADDRESSES: Objections and answers to
objections should be filed in Dockets
DOT–OST–2011–0150 and DOT–OST–
2011–0151 and addressed to U.S.
Department of Transportation, Docket
Operations, (M–30, Room W12–140),
1200 New Jersey Avenue, SE., West
Building Ground Floor, Washington, DC
20590, and should be served upon the
parties listed in Attachment A to the
order.
FOR FURTHER INFORMATION CONTACT:
Catherine J. O’Toole, Air Carrier Fitness
Division (X–56, Room W86–489), U.S.
Department of Transportation, 1200
New Jersey Avenue SE., Washington,
DC 20590, (202) 366–9721.
Dated: January 13, 2012.
Robert A. Letteney,
Deputy Assistant Secretary for Aviation and
International Affairs.
[FR Doc. 2012–1201 Filed 1–20–12; 8:45 am]
BILLING CODE P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Airborne Radar Altimeter Equipment
(For Air Carrier Aircraft)
Federal Aviation
Administration (FAA), DOT.
ACTION: Notice of intent to cancel
Technical Standard Order (TSO)–C67,
Airborne Radar Altimeter Equipment
(For Air Carrier Aircraft).
AGENCY:
This notice announces the
FAA’s intent to cancel TSO–C67,
Airborne Radar Altimeter Equipment
(For Air Carrier Aircraft). The effect of
the cancelled TSO will result in no new
TSO–C67 design or production
approvals. However, cancellation will
not affect any current production of an
existing TSO authorization (TSOA).
Articles produced under an existing
TSOA can still be installed per the
existing airworthiness approvals, and all
applications for new airworthiness
approvals will still be processed.
DATES: Comments must be received on
or before February 22, 2012.
FOR FURTHER INFORMATION CONTACT: Mr.
Albert Sayadian, AIR–130, Federal
Aviation Administration, 470 L’Enfant
Plaza, Suite 4102, Washington, DC
20024. Telephone (202) 385–4652, fax
SUMMARY:
[FR Doc. 2012–1185 Filed 1–20–12; 8:45 am]
3323
E:\FR\FM\23JAN1.SGM
23JAN1
Agencies
[Federal Register Volume 77, Number 14 (Monday, January 23, 2012)]
[Notices]
[Pages 3321-3323]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-1185]
[[Page 3321]]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Public Hearing
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Susquehanna River Basin Commission will hold a public
hearing on February 16, 2012, in Harrisburg, Pennsylvania. At this
public hearing, the Commission will hear testimony on the projects
listed in the Supplementary Information section of this notice. Such
projects are intended to be scheduled for Commission action at its next
business meeting, tentatively scheduled for March 15, 2012, which will
be noticed separately. Included in the list of projects scheduled for
comment at the public hearing are both new projects and certain
projects that were acted upon at the Commission's December 15, 2011,
public hearing held in Wilkes-Barre, Pennsylvania. The Commission is
affording this opportunity for additional comment due to the disruptive
behavior of certain individuals that prevented many interested persons
from being able to offer testimony at the December 15, 2011, public
hearing. To give due consideration of any new oral or written comment
received on such projects, the Commission will reconsider, at its March
2012, meeting, the actions taken on December 15, 2011. Details
concerning the list of all projects that are the subject of the public
hearing are contained in the Supplementary Information section of this
notice. The public should take note that this public hearing will be
the only opportunity to offer oral comment to the Commission for the
listed projects. There will be no opportunity for further comment on
these projects at the Commission's business meeting in March 2012,
where the Commission is expected to take action thereon. The deadline
for written comments on all such projects is February 27, 2012.
DATES: The public hearing will convene on February 16, 2012, at 2:30
p.m. Written comments on the listed projects are due on or before
February 27, 2012.
ADDRESSES: The public hearing will be conducted at the Pennsylvania
State Capitol, Room 8E-B, East Wing, Commonwealth Avenue, Harrisburg,
Pa.
FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel,
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436; email:
rcairo@srbc.net or Stephanie L. Richardson, Secretary to the
Commission, telephone: (717) 238-0423, ext. 304; fax: (717) 238-2436;
email: srichardson@srbc.net. Information concerning the applications
for these projects is available at the SRBC Water Resource Portal at
www.srbc.net/wrp. Materials and supporting documents are available to
inspect and copy in accordance with the Commission's Access to Records
Policy at www.srbc.net/pubinfo/docs/2009-02%20Access%20to%20Records%20Policy%209-10-09.PDF.
SUPPLEMENTARY INFORMATION: The public hearing will cover the following
projects:
Projects Originally Considered at the December 15, 2011, Public Hearing
1. Project Sponsor: Anadarko E&P Company LP. Project Facility:
Sproul State Forest--Council Run, Snow Shoe Township, Centre County,
Pa. Application for groundwater withdrawal of up to 0.715 mgd (30-day
average) from Well PW-11.
2. Project Sponsor: Bioenergy International, LLC. Project Facility:
Bionol Clearfield, LLC, Clearfield Borough, Clearfield County, Pa.
Modification to conditions of the surface water withdrawal approval
(Docket No. 20070904).
3. Project Sponsor: Borough of Ephrata. Project Facility: Ephrata
Area Joint Authority, Ephrata Borough, Lancaster County, Pa.
Modification to conditions of the groundwater withdrawal approval
(Docket No. 20110902).
4. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Mosquito
Creek-2), Karthaus Township, Clearfield County, Pa. Application for
surface water withdrawal of up to 2.160 mgd.
5. Project Sponsor and Facility: Central New York Oil and Gas
Company, LLC (Susquehanna River), Wilmot Township, Bradford County, Pa.
Application for surface water withdrawal of up to 0.540 mgd.
6. Project Sponsor and Facility: Central New York Oil and Gas
Company, LLC, Wilmot Township, Bradford County, Pa. Application for
consumptive water use of up to 0.105 mgd.
7. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Susquehanna River--Babcock), Ulster Township, Bradford County, Pa.
Application for surface water withdrawal of up to 3.000 mgd.
8. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Susquehanna River--Elmglade), Wilmot Township, Bradford County, Pa.
Application for surface water withdrawal of up to 2.016 mgd.
9. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Towanda Creek--Sechrist), Canton Township, Bradford County, Pa.
Application for surface water withdrawal of up to 0.504 mgd.
10. Project Sponsor: Clark Trucking, LLC. Project Facility:
Northeast Division (Lycoming Creek), Lewis Township, Lycoming County,
Pa. Application for surface water withdrawal of up to 0.500 mgd.
11. Project Sponsor: Clark Trucking, LLC. Project Facility:
Northeast Division (Muncy Creek), Muncy Creek Township, Lycoming
County, Pa. Application for surface water withdrawal of up to 0.700
mgd.
12. Project Sponsor and Facility: Dunn Lake LLC (Dunn Pond), Ararat
Township, Susquehanna County, Pa. Application for surface water
withdrawal of up to 0.999 mgd.
13. Project Sponsor and Facility: EXCO Resources (PA), LLC (Muncy
Creek--McClintock), Penn Township, Lycoming County, Pa. Application for
surface water withdrawal of up to 1.500 mgd.
14. Project Sponsor: Glenn O. Hawbaker, Inc. Project Facility:
Greens Landing Aggregate Plant, Athens Township, Bradford County, Pa.
Application for surface water withdrawal of up to 0.249 mgd.
15. Project Sponsor: Glenn O. Hawbaker, Inc. Project Facility:
Greens Landing Aggregate Plant, Athens Township, Bradford County, Pa.
Application for consumptive water use of up to 0.249 mgd.
16. Project Sponsor: Hazleton Creek Properties, LLC. Project
Facility: Hazleton Mine Reclamation, Hazleton City, Luzerne County, Pa.
Modification to increase groundwater withdrawal by an additional 0.145
mgd, for a total of 0.200 mgd (30-day average) (Docket No. 20110307).
17. Project Sponsor and Facility: Keystone Clearwater Solutions,
LLC (Babb Creek), Morris Township, Tioga County, Pa. Application for
surface water withdrawal of up to 0.950 mgd.
18. Project Sponsor and Facility: Stanley S. Karp Sr. (Tunkhannock
Creek), Nicholson Township, Wyoming County, Pa. Application for surface
water withdrawal of up to 0.510 mgd.
19. Project Sponsor and Facility: Sugar Hollow Trout Park and
Hatchery, Eaton Township, Wyoming County, Pa. Modification to project
features and conditions of the groundwater withdrawal approval (Docket
No. 20100913).
20. Project Sponsor and Facility: Sugar Hollow Water Services, LLC
(Susquehanna River--Chellis), Eaton Township, Wyoming County, Pa.
[[Page 3322]]
Application for surface water withdrawal of up to 1.500 mgd.
21. Project Sponsor: The Municipal Authority of the Borough of
Berlin. Project Facility: Berlin Borough Municipal Authority, Allegheny
Township, Somerset County, Pa. Modification to conditions of the
groundwater withdrawal approval (Docket No. 19980702).
22. Project Sponsor and Facility: Walker Township Water
Association, Walker Township, Centre County, Pa. Modification to
increase the total groundwater system withdrawal limit from 0.523 mgd
to 0.753 mgd (30-day average) (Docket No. 20070905).
23. Project Sponsor and Facility: Williams Production Appalachia,
LLC (Middle Branch Wyalusing Creek), Forest Lake Township, Susquehanna
County, Pa. Application for surface water withdrawal of up to 0.750
mgd.
24. Project Sponsor and Facility: Williams Production Appalachia,
LLC (Snake Creek-2), Franklin Township, Susquehanna County, Pa.
Application for surface water withdrawal of up to 0.999 mgd.
25. Project Sponsor and Facility: Williams Production Appalachia,
LLC (Susquehanna River), Great Bend Township, Susquehanna County, Pa.
Commission-initiated modification to project features and conditions of
the surface water withdrawal approval (Docket No. 20090303), making a
correction and reducing the approved surface water withdrawal amount
from 3.00 mgd to 1.00 mgd.
26. Project Sponsor and Facility: Williams Production Appalachia,
LLC (Susquehanna River-2), Great Bend Township, Susquehanna County, Pa.
Application for surface water withdrawal of up to 2.000 mgd.
Additional Project for Rescission Action
1. Project Sponsor and Facility: Texas Eastern Transmission LP
(Susquehanna River) (Docket No. 20110314), East Donegal Township,
Lancaster County, Pa.
Additional Projects
1. Project Sponsor and Facility: Anadarko E&P Company LP (Lycoming
Creek), Lewis Township, Lycoming County, Pa. Application for surface
water withdrawal of up to 1.340 mgd (peak day).
2. Project Sponsor and Facility: Aqua Infrastructure, LLC (West
Branch Susquehanna River), Piatt Township, Lycoming County, Pa.
Application for surface water withdrawal of up to 3.000 mgd (peak day).
3. Project Sponsor and Facility: Aqua Resources, Inc. (Susquehanna
River), Athens Township, Bradford County, Pa. Application for surface
water withdrawal of up to 0.900 mgd (peak day).
4. Project Sponsor and Facility: Black Bear Waters, LLC (Lycoming
Creek), Lewis Township, Lycoming County, Pa. Application for surface
water withdrawal of up to 0.400 mgd (peak day).
5. Project Sponsor and Facility: Blossburg Municipal Authority,
Bloss Township, Tioga County, Pa. Application for groundwater
withdrawal of up to 0.396 mgd (30-day average) from Route 15 Well.
6. Project Sponsor and Facility: Buck Ridge Stone, LLC (Salt Lick
Creek), New Milford Township, Susquehanna County, Pa. Modification to
increase surface water withdrawal by an additional 0.637 mgd, for a
total of 0.720 mgd (peak day) (Docket No. 20100905).
7. Project Sponsor and Facility: Cabot Oil & Gas Corporation
(Susquehanna River), Susquehanna Depot Borough, Susquehanna County, Pa.
Modification to increase surface water withdrawal by an additional
0.780 mgd, for a total of 1.500 mgd (peak day) (Docket No. 20080908).
8. Project Sponsor and Facility: Cabot Oil & Gas Corporation
(Susquehanna River), Great Bend Borough, Susquehanna County, Pa.
Modification to increase surface water withdrawal by an additional
1.280 mgd, for a total of 2.000 mgd (peak day) (Docket No. 20080905).
9. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Middle
Branch Wyalusing Creek), Forest Lake Township, Susquehanna County, Pa.
Modification to conditions of the surface water withdrawal approval
(Docket No. 20110604).
10. Project Sponsor and Facility: Carrizo (Marcellus), LLC
(Moshannon Creek), Decatur Township, Clearfield County, Pa. Application
for surface water withdrawal of up to 2.590 mgd (peak day).
11. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Unnamed
Tributary of Middle Branch Wyalusing Creek), Forest Lake Township,
Susquehanna County, Pa. Modification to conditions of the surface water
withdrawal approval (Docket No. 20110605).
12. Project Sponsor and Facility: Empire Kosher Poultry, Inc.,
Walker Township, Juniata County, Pa. Modification to increase total
groundwater system withdrawal by an additional 0.499 mgd, for a total
of 1.269 mgd (30-day average) (Docket No. 20030809).
13. Project Sponsor and Facility: EQT Production Company (Bennett
Branch Power), Jay Township, Elk County, Pa. Application for surface
water withdrawal of up to 2.500 mgd (peak day).
14. Project Sponsor and Facility: EQT Production Company (Wilson
Creek), Duncan Township, Tioga County, Pa. Application for surface
water withdrawal of up to 0.740 mgd (peak day).
15. Project Sponsor: IBM Corporation. Project Facility: Endicott
Facility, Village of Endicott, Broome County, N.Y. Modification to
increase total groundwater system withdrawal by an additional 0.499
mgd, for a total of 1.509 mgd (30-day average) (Docket No. 20090329).
16. Project Sponsor and Facility: Jo Jo Oil Company, Inc.
(Tunkhannock Creek), Tunkhannock Township, Wyoming County, Pa.
Application for surface water withdrawal of up to 0.999 mgd (peak day).
17. Project Sponsor and Facility: Keystone Landfill, Inc., Dunmore
Borough, Lackawanna County, Pa. Modification to increase groundwater
withdrawal by an additional 0.150 mgd, for a total of 0.160 mgd (30-day
average) (Docket No. 20080611).
18. Project Sponsor and Facility: Keystone Landfill, Inc., Dunmore
Borough, Lackawanna County, Pa. Modification to increase consumptive
water use by an additional 0.260 mgd, for a total of up to 0.360 mgd
(30-day average) (Docket No. 20080611).
19. Project Sponsor and Facility: Northwestern Lancaster County
Authority, Penn Township, Lancaster County, Pa. Application for
groundwater withdrawal of up to 0.324 mgd (30-day average) from Well 2.
20. Project Sponsor and Facility: Northwestern Lancaster County
Authority, Penn Township, Lancaster County, Pa. Application for
groundwater withdrawal of up to 1.000 mgd (30-day average) from Well 3.
21. Project Sponsor: Pine Creek Municipal Authority. Project
Facility: Wastewater Treatment Plant, Pine Creek Township, Clinton
County, Pa. Application for withdrawal of treated wastewater effluent
of up to 0.999 mgd.
22. Project Sponsor and Facility: Roaring Spring Water--Division of
Roaring Spring Blank Book (Roaring Spring), Roaring Spring Borough,
Blair County, Pa. Application for surface water withdrawal of up to
0.302 mgd (peak day).
23. Project Sponsor and Facility: Roaring Spring Water--Division of
[[Page 3323]]
Roaring Spring Blank Book, Roaring Spring Borough, Blair County, Pa.
Application for consumptive water use of up to 0.255 mgd (30-day
average).
24. Project Sponsor and Facility: Southwestern Energy Production
Company (Blockhouse Creek), Jackson Township, Lycoming County, Pa.
Application for surface water withdrawal of up to 0.999 mgd (peak day).
25. Project Sponsor and Facility: Southwestern Energy Production
Company (East Branch Tunkhannock Creek), Lenox Township, Susquehanna
County, Pa. Application for surface water withdrawal of up to 1.500 mgd
(peak day).
26. Project Sponsor and Facility: Southwestern Energy Production
Company (Susquehanna River), Oakland Township, Susquehanna County, Pa.
Application for surface water withdrawal of up to 3.000 mgd (peak day).
27. Project Sponsor and Facility: Southwestern Energy Production
Company (Tunkhannock Creek), Lenox Township, Susquehanna County, Pa.
Application for surface water withdrawal of up to 1.500 mgd (peak day).
28. Project Sponsor and Facility: Stanley S. Karp Sr. (Tunkhannock
Creek), Nicholson Township, Wyoming County, Pa. Application for surface
water withdrawal of up to 0.510 mgd (peak day).
29. Project Sponsor and Facility: SWEPI LP (Cowanesque River--
Egleston), Nelson Township, Tioga County, Pa. Modification to increase
surface water withdrawal by an additional 0.267 mgd, for a total of
0.534 mgd (peak day) (Docket No. 20100604).
30. Project Sponsor: Viking Energy of Northumberland, LLC. Project
Facility: Power Plant, Point Township, Northumberland County, Pa.
Application for consumptive water use of up to 0.387 mgd (30-day
average).
31. Project Sponsor: Viking Energy of Northumberland, LLC. Project
Facility: Power Plant, Point Township, Northumberland County, Pa.
Application for groundwater withdrawal of up to 0.172 mgd from Well 1,
and a total system withdrawal limit of up to 0.391 mgd (30-day
average).
32. Project Sponsor: Viking Energy of Northumberland, LLC. Project
Facility: Power Plant, Point Township, Northumberland County, Pa.
Application for groundwater withdrawal of up to 0.172 mgd from Well 2,
and a total system withdrawal limit of up to 0.391 mgd (30-day
average).
33. Project Sponsor: Viking Energy of Northumberland, LLC. Project
Facility: Power Plant, Point Township, Northumberland County, Pa.
Application for groundwater withdrawal of up to 0.172 mgd from Well 4,
and a total system withdrawal limit of up to 0.391 mgd (30-day
average).
34. Project Sponsor and Facility: Water Treatment Solutions, LLC
(South Mountain Lake), Wood Township, Lycoming County, Pa. Application
for surface water withdrawal of up to 0.499 mgd (peak day).
Opportunity To Appear and Comment
Interested parties may appear at the hearing to offer comments to
the Commission on any project listed above. The presiding officer
reserves the right to limit oral statements in the interest of time and
to otherwise control the course of the hearing. Ground rules for the
hearing will be clearly stated prior to the hearing and disruptive
behavior will not be tolerated. Ground rules will be posted on the
Commission's Web site, www.srbc.net, prior to the hearing for review.
The presiding officer reserves the right to modify or supplement such
rules at the hearing. Written comments on any project listed above may
also be mailed to the Susquehanna River Basin Commission, 1721 North
Front Street, Harrisburg, Pa. 17102-2391, or submitted electronically
to Richard A. Cairo, General Counsel, rcairo@srbc.net, or Stephanie L.
Richardson, Secretary to the Commission, srichardson@srbc.net. Comments
mailed or electronically submitted must be received by the Commission
on or before February 27, 2012, to be considered.
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806-808.
Dated: January 12, 2012.
Thomas W. Beauduy,
Deputy Executive Director.