Download as PDF 2970 Federal Register / Vol. 77, No. 13 / Friday, January 20, 2012 / Notices enter the docket number, excluding the last three digits, in the Docket Number field i.e., CP12–33). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to www.ferc.gov/ esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. action that would significantly affect the quality of the human environment. A copy of the final EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–(866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. For further information, contact Matt Cutlip at (503) 552–2762 or matt.cutlip@ferc.gov. Dated: January 12, 2012. Kimberly D. Bose, Secretary. Dated: January 13, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–1084 Filed 1–19–12; 8:45 am] [FR Doc. 2012–1072 Filed 1–19–12; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6717–01–P BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Docket No. CP12–31–000] Federal Energy Regulatory Commission [Project No. 12478–003] wreier-aviles on DSK5TPTVN1PROD with NOTICES Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation’s Gibson dam on the Sun River in Lewis and Clark and Teton Counties, Montana, and has prepared a final environmental assessment (EA) for the project. The project would occupy a total of 68.5 acres of federal lands. The final EA contains staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal VerDate Mar<15>2010 14:12 Jan 19, 2012 Jkt 226001 Notice of Intent To Prepare an Environmental Assessment for the Proposed Elba BOG Compressor Project and Request for Comments on Environmental Issues; Southern LNG Company, L.L.C. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an Environmental Assessment (EA) that will discuss the environmental impacts of the Elba BOG Compressor Project involving construction and operation of facilities by Southern LNG Company, L.L.C. (SLNG) in Chatham County, Georgia. The Commission will use this EA in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Please note that the scoping period will close on February 13, 2012. This notice is being sent to the Commission’s current environmental PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 mailing list for this project. State and local government representatives should notify their constituents of this proposed project and encourage them to comment on their areas of concern. Summary of the Proposed Project SLNG proposes to construct and operate additional boil-off gas (BOG) compression facilities at its liquefied natural gas (LNG) marine terminal on Elba Island in Chatham County, Georgia (Terminal). The Elba BOG Compressor Project would supplement the existing 1,500 horsepower BOG compressor and is expected to operate any time the overall plant vaporization rate is below approximately 120 million cubic feet per day. The additional compression would increase the Terminal’s capability to compress a total of 21 million cubic feet per day of BOG generated within its storage tanks without the need to re-gasify additional LNG. The project would not increase the LNG sendout or storage of the Terminal. The Elba BOG Compressor Project would consist of the following facilities: • 2,500 horsepower electric-motor driven reciprocating gas compressor; • flow metering modifications; • underground discharge piping tie-in to the existing 30-inch-diameter sendout pipeline; • approximately 200 feet of 4-inchdiameter suction/discharge pipe; • approximately 420 feet of aboveground 10-inch-diameter piping; • electrical modifications in the existing compressor building; and • valving modifications. The general location of the project facilities is shown in appendix 1.1 Land Requirements for Construction The project would be located entirely within SLNG’s existing Terminal. All work would be performed within an approximately 21-acre portion of the existing Terminal boundaries, near the existing K–5 compressor at the Terminal. The majority of the project land requirements would be temporary use areas associated with fabrication, parking, and staging areas, which have been previously disturbed. Existing access roads would be used for construction and operations activities. At completion, approximately 0.05 acre of additional land within the Terminal 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. E:\FR\FM\20JAN1.SGM 20JAN1

Agencies

[Federal Register Volume 77, Number 13 (Friday, January 20, 2012)]
[Notices]
[Page 2970]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-1084]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12478-003]


Gibson Dam Hydroelectric Company, LLC, Montana; Notice of 
Availability of Final Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office 
of Energy Projects has reviewed the application for license for the 
Gibson Dam Hydroelectric Project, located at the U.S. Department of the 
Interior, Bureau of Reclamation's Gibson dam on the Sun River in Lewis 
and Clark and Teton Counties, Montana, and has prepared a final 
environmental assessment (EA) for the project. The project would occupy 
a total of 68.5 acres of federal lands.
    The final EA contains staff's analysis of the potential 
environmental impacts of the project and concludes that licensing the 
project, with appropriate environmental protective measures, would not 
constitute a major federal action that would significantly affect the 
quality of the human environment.
    A copy of the final EA is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-(866) 208-3676, or for 
TTY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    For further information, contact Matt Cutlip at (503) 552-2762 or 
matt.cutlip@ferc.gov.

    Dated: January 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-1084 Filed 1-19-12; 8:45 am]
BILLING CODE 6717-01-P