Notice of Intent To Prepare an Environmental Assessment for the Proposed Elba BOG Compressor Project and Request for Comments on Environmental Issues; Southern LNG Company, L.L.C., 2970-2972 [2012-1078]
Download as PDF
2970
Federal Register / Vol. 77, No. 13 / Friday, January 20, 2012 / Notices
enter the docket number, excluding the
last three digits, in the Docket Number
field i.e., CP12–33). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
action that would significantly affect the
quality of the human environment.
A copy of the final EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–(866) 208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact Matt
Cutlip at (503) 552–2762 or
matt.cutlip@ferc.gov.
Dated: January 12, 2012.
Kimberly D. Bose,
Secretary.
Dated: January 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–1084 Filed 1–19–12; 8:45 am]
[FR Doc. 2012–1072 Filed 1–19–12; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. CP12–31–000]
Federal Energy Regulatory
Commission
[Project No. 12478–003]
wreier-aviles on DSK5TPTVN1PROD with NOTICES
Gibson Dam Hydroelectric Company,
LLC, Montana; Notice of Availability of
Final Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for license for the Gibson Dam
Hydroelectric Project, located at the U.S.
Department of the Interior, Bureau of
Reclamation’s Gibson dam on the Sun
River in Lewis and Clark and Teton
Counties, Montana, and has prepared a
final environmental assessment (EA) for
the project. The project would occupy a
total of 68.5 acres of federal lands.
The final EA contains staff’s analysis
of the potential environmental impacts
of the project and concludes that
licensing the project, with appropriate
environmental protective measures,
would not constitute a major federal
VerDate Mar<15>2010
14:12 Jan 19, 2012
Jkt 226001
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Elba BOG Compressor
Project and Request for Comments on
Environmental Issues; Southern LNG
Company, L.L.C.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
Environmental Assessment (EA) that
will discuss the environmental impacts
of the Elba BOG Compressor Project
involving construction and operation of
facilities by Southern LNG Company,
L.L.C. (SLNG) in Chatham County,
Georgia. The Commission will use this
EA in its decision-making process to
determine whether the project is in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on February
13, 2012.
This notice is being sent to the
Commission’s current environmental
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
Summary of the Proposed Project
SLNG proposes to construct and
operate additional boil-off gas (BOG)
compression facilities at its liquefied
natural gas (LNG) marine terminal on
Elba Island in Chatham County, Georgia
(Terminal). The Elba BOG Compressor
Project would supplement the existing
1,500 horsepower BOG compressor and
is expected to operate any time the
overall plant vaporization rate is below
approximately 120 million cubic feet
per day. The additional compression
would increase the Terminal’s
capability to compress a total of 21
million cubic feet per day of BOG
generated within its storage tanks
without the need to re-gasify additional
LNG. The project would not increase the
LNG sendout or storage of the Terminal.
The Elba BOG Compressor Project
would consist of the following facilities:
• 2,500 horsepower electric-motor
driven reciprocating gas compressor;
• flow metering modifications;
• underground discharge piping tie-in
to the existing 30-inch-diameter sendout
pipeline;
• approximately 200 feet of 4-inchdiameter suction/discharge pipe;
• approximately 420 feet of
aboveground 10-inch-diameter piping;
• electrical modifications in the
existing compressor building; and
• valving modifications.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
The project would be located entirely
within SLNG’s existing Terminal. All
work would be performed within an
approximately 21-acre portion of the
existing Terminal boundaries, near the
existing K–5 compressor at the
Terminal. The majority of the project
land requirements would be temporary
use areas associated with fabrication,
parking, and staging areas, which have
been previously disturbed. Existing
access roads would be used for
construction and operations activities.
At completion, approximately 0.05 acre
of additional land within the Terminal
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
E:\FR\FM\20JAN1.SGM
20JAN1
Federal Register / Vol. 77, No. 13 / Friday, January 20, 2012 / Notices
wreier-aviles on DSK5TPTVN1PROD with NOTICES
boundaries would be permanently
converted to project use.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• Land use;
• Water resources, fisheries, and
wetlands;
• Cultural resources;
• Vegetation and wildlife;
• Air quality and noise;
• Endangered and threatened species;
and
• Public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
beginning on page 4.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.3 Agencies that
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
3 The Council on Environmental Quality
regulations addressing cooperating agency
VerDate Mar<15>2010
14:12 Jan 19, 2012
Jkt 226001
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with
applicable State Historic Preservation
Office (SHPO), and to solicit their views
and those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.4 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before February
13, 2012.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP12–31–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
responsibilities are at Title 40, Code of Federal
Regulations, part 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
2971
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1A,
Washington, DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
E:\FR\FM\20JAN1.SGM
20JAN1
2972
Federal Register / Vol. 77, No. 13 / Friday, January 20, 2012 / Notices
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP12–31). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: January 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–1078 Filed 1–19–12; 8:45 am]
wreier-aviles on DSK5TPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2230–044]
City and Borough of Sitka, Alaska,
Alaska; Notice of Availability of
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC’s)
regulations, 18 Code of Federal
Regulations (CFR) part 380 (Order No.
486, 52 Federal Register [FR] 47897),
Commission staff has reviewed the City
and Borough of Sitka’s application for a
capacity-related amendment to the
license for the Blue Lake Hydroelectric
Project (FERC Project No. 2230) and has
prepared an Environmental Assessment
(EA). The project is located on Sawmill
Creek, formerly the Medvetche River, in
the Borough of Sitka, Alaska. The
project currently occupies a total of
1,676 acres of federal lands
administered by the U.S. Department of
Agriculture, Forest Service, and under
the City of Sitka’s proposal, it would
occupy 1,798 acres of federal lands.
The EA contains the Commission
staff’s analysis of the potential
environmental effects of the proposed
modifications to the project and the
addition of new generating capacity and
the conclusion that authorizing the
amendment, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room 2–A of the
Commission’s offices at 888 First Street
NE., Washington, DC 20426. The EA
also may be viewed on the
Commission’s Internet Web site at
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
Additional information about the
project is available from the
Commission’s Web site using the
eLibrary link. For assistance with
eLibrary, contact
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676; for TTY contact
(202) 502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filings,
documents may also be paper-filed. To
paper-file, mail an original and seven
copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
For further information, contact
Steven Sachs by telephone at (202) 502–
8666 or by email at
Steven.Sachs@ferc.gov.
Dated: January 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–1076 Filed 1–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Thunder Bay Power Company,
Thunder Bay Power, LLC, et al.; Notice
of Application for Transfer of Licenses,
and Soliciting Comments and Motions
To Intervene
Thunder Bay Power Company ...............................................................................................................
Thunder Bay Power, LLC
Midwest Hydro, Inc. ................................................................................................................................
Midwest Hydro, LLC
Midwest Hydraulic Company, Inc ...........................................................................................................
Midwest Hydraulic Company, LLC
N.E.W. Hydro, Inc ..................................................................................................................................
Project No. 2404–095
Project Nos. 2348–035, 287–034, 2347–
049, 2373–010
Project No. 10805–054
Project Nos. 2550–026, 2689–039, 2523–
052, 2744–040
N.E.W. Hydro, LLC
VerDate Mar<15>2010
14:12 Jan 19, 2012
Jkt 226001
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
E:\FR\FM\20JAN1.SGM
20JAN1
Agencies
[Federal Register Volume 77, Number 13 (Friday, January 20, 2012)]
[Notices]
[Pages 2970-2972]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-1078]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-31-000]
Notice of Intent To Prepare an Environmental Assessment for the
Proposed Elba BOG Compressor Project and Request for Comments on
Environmental Issues; Southern LNG Company, L.L.C.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an Environmental Assessment (EA) that will
discuss the environmental impacts of the Elba BOG Compressor Project
involving construction and operation of facilities by Southern LNG
Company, L.L.C. (SLNG) in Chatham County, Georgia. The Commission will
use this EA in its decision-making process to determine whether the
project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues they need to evaluate in the EA. Please note that
the scoping period will close on February 13, 2012.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
Summary of the Proposed Project
SLNG proposes to construct and operate additional boil-off gas
(BOG) compression facilities at its liquefied natural gas (LNG) marine
terminal on Elba Island in Chatham County, Georgia (Terminal). The Elba
BOG Compressor Project would supplement the existing 1,500 horsepower
BOG compressor and is expected to operate any time the overall plant
vaporization rate is below approximately 120 million cubic feet per
day. The additional compression would increase the Terminal's
capability to compress a total of 21 million cubic feet per day of BOG
generated within its storage tanks without the need to re-gasify
additional LNG. The project would not increase the LNG sendout or
storage of the Terminal. The Elba BOG Compressor Project would consist
of the following facilities:
2,500 horsepower electric-motor driven reciprocating gas
compressor;
flow metering modifications;
underground discharge piping tie-in to the existing 30-
inch-diameter sendout pipeline;
approximately 200 feet of 4-inch-diameter suction/
discharge pipe;
approximately 420 feet of aboveground 10-inch-diameter
piping;
electrical modifications in the existing compressor
building; and
valving modifications.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
The project would be located entirely within SLNG's existing
Terminal. All work would be performed within an approximately 21-acre
portion of the existing Terminal boundaries, near the existing K-5
compressor at the Terminal. The majority of the project land
requirements would be temporary use areas associated with fabrication,
parking, and staging areas, which have been previously disturbed.
Existing access roads would be used for construction and operations
activities. At completion, approximately 0.05 acre of additional land
within the Terminal
[[Page 2971]]
boundaries would be permanently converted to project use.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping.'' The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
Land use;
Water resources, fisheries, and wetlands;
Cultural resources;
Vegetation and wildlife;
Air quality and noise;
Endangered and threatened species; and
Public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before making our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section beginning on page 4.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues of
this project to formally cooperate with us in the preparation of the
EA.\3\ Agencies that would like to request cooperating agency status
should follow the instructions for filing comments provided under the
Public Participation section of this notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, part 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with applicable State Historic Preservation Office (SHPO), and to
solicit their views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\4\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPO as the project
develops. On natural gas facility projects, the APE at a minimum
encompasses all areas subject to ground disturbance (examples include
construction right-of-way, contractor/pipe storage yards, compressor
stations, and access roads). Our EA for this project will document our
findings on the impacts on historic properties and summarize the status
of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that the Commission receives them in Washington, DC on or before
February 13, 2012.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP12-31-000) with your submission.
The Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for interested persons to
submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be
[[Page 2972]]
heard by the courts if they choose to appeal the Commission's final
ruling. An intervenor formally participates in the proceeding by filing
a request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP12-
31). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: January 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-1078 Filed 1-19-12; 8:45 am]
BILLING CODE 6717-01-P