Combined Notice of Filings, 2967-2968 [2012-1042]
Download as PDF
Federal Register / Vol. 77, No. 13 / Friday, January 20, 2012 / Notices
would generate an annual average of
approximately 9,000 to 18,000 kWhours.
The proposed project is currently
unlicensed and was found to be
jurisdictional because it is located on a
Commerce Clause water and affects the
interests of interstate commerce. See,
103 FERC ¶ 62,180 (2003).
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Michigan State
Historic Preservation Officer (SHPO), as
required by 106, National Historic
Preservation Act, and the regulations of
the Advisory Council on Historic
Preservation, 36 CFR 800.4.
q. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Acceptance Letter or
Deficiency Letter.
Issue Notice of Ready for
Environmental Analysis.
Comments, Recommendations, and Terms and
Conditions.
Commission issues EA .......
April 2012.
June 2012.
August 2012.
Description: Compliance Refund
Report of Entergy Arkansas, Inc.
Filed Date: 1/10/12.
Accession Number: 20120110–5096.
Comments Due: 5 p.m. ET 1/31/12.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES12–18–000.
Applicants: Rochester Gas and
Electric Corporation.
Description: Application of Rochester
Gas and Electric Corporation for
Authorization to Issue Short-Term Debt
under section 204 of the Federal Power
Act.
Filed Date: 1/11/12.
Accession Number: 20120111–5163.
Comments Due: 5 p.m. ET 2/1/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 11, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–1041 Filed 1–19–12; 8:45 am]
BILLING CODE 6717–01–P
November
2012.
DEPARTMENT OF ENERGY
Dated: January 13, 2012.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2012–1069 Filed 1–19–12; 8:45 am]
Combined Notice of Filings
BILLING CODE 6717–01–P
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP12–302–000.
Applicants: Transcontinental Gas
Pipe Line Company,
Description: Revise Sections 2.4 and
2.5 (PS and ACQ) of Rate Schedule FT
to be effective 2/11/2012.
Filed Date: 1/11/12.
Accession Number: 20120111–5115.
Comments Due: 5 p.m. ET 1/23/12.
Docket Numbers: RP12–303–000.
wreier-aviles on DSK5TPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–879–000.
Applicants: Entergy Arkansas, Inc.
VerDate Mar<15>2010
14:12 Jan 19, 2012
Jkt 226001
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
2967
Applicants: Midcontinent Express
Pipeline LLC.
Description: Annual Report of
Operational Purchases and Sales of
Midcontinent Express Pipeline LLC.
Filed Date: 1/11/12.
Accession Number: 20120111–5129.
Comments Due: 5 p.m. ET 1/23/12.
Docket Numbers: RP12–304–000.
Applicants: Dominion Transmission,
Inc.
Description: DTI—January 11, 2012—
Nonconforming Service Agreement to be
effective 1/15/2012.
Filed Date: 1/11/12.
Accession Number: 20120111–5136.
Comments Due: 5 p.m. ET 1/23/12.
Docket Numbers: RP12–305–000
Applicants: Discovery Gas
Transmission LLC.
Description: Footnote 4 Removal to be
effective 1/1/2012.
Filed Date: 1/11/12.
Accession Number: 20120111–5175.
Comments Due: 5 p.m. ET 1/23/12.
Docket Numbers: RP12–306–000.
Applicants: Equitrans, L.P.
Description: Non-Conforming
Agreement Filing—GeoMet Operating
Company, Inc. to be effective 1/1/2012.
Filed Date: 1/11/12.
Accession Number: 20120111–5225.
Comments Due: 5 p.m. ET 1/23/12.
Docket Numbers: RP12–307–000
Applicants: Texas Eastern
Transmission, LP.
Description: Submits tariff filing per
154.204: Duke Energy Indiana
Negotiated Rate to be effective 1/12/
2012.
Filed Date: 1/12/12.
Accession Number: 20120112–5055.
Comments Due: 5 p.m. ET 1/24/12.
Docket Numbers: CP12–42–000.
Applicants: Liberty Energy
(Midstates) Corporation
Description: Application for Limited
Jurisdiction Blanket Certificate, and
Approval of Rates.
Filed Date: 1/4/12.
Accession Number: 20120104–5143.
Comments Due: 5 p.m. ET 12/25/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
E:\FR\FM\20JAN1.SGM
20JAN1
2968
Federal Register / Vol. 77, No. 13 / Friday, January 20, 2012 / Notices
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: January 12, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–1042 Filed 1–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12790–001]
Pomperaug Hydro Project, Andrew
Peklo III; Notice Establishing Deadline
for Comments and Reply Comments
On December 15, 2011, the
Commission issued notice that Office of
Energy Projects staff will hold a site
visit and technical meeting on January
18, 2012. The meeting will be
transcribed by a court reporter and all
oral comments made at the meeting will
be included in the public record. Any
written comments should be filed by
February 17, 2012, and any reply
comments must be filed by March 5,
2012. If you have questions about filing
comments, please contact Steve Kartalia
at (202) 502–6131, or via email at
stephen.kartalia@ferc.gov.
Dated: January 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–1082 Filed 1–19–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–33–000]
wreier-aviles on DSK5TPTVN1PROD with NOTICES
Caledonia Energy Partners, L.L.C.;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Caledonia Delta Pressure—
DP33 Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
Environmental Assessment (EA) that
will discuss the environmental affects of
the Caledonia Delta Pressure—DP33
Project (Project) proposed by Caledonia
Energy Partners, L.L.C. (Caledonia) in
Lowndes County, Mississippi. The
Commission will use this EA in its
VerDate Mar<15>2010
14:12 Jan 19, 2012
Jkt 226001
decision-making process to determine
whether the Project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the Project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on February
13, 2012.
You may submit comments in written
form. Further details on how to submit
written comments are in the Public
Participation section of this notice.
This notice is being sent to the
Commission’s current environmental
mailing list for this Project. State and
local government representatives should
notify their constituents of this
proposed Project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Caledonia provided landowners with
a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility on My Land? What Do I Need
To Know?’’ This fact sheet addresses a
number of typically-asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC Web
site (www.ferc.gov).
Summary of the Proposed Project
The Project involves the modification
of the Caledonia Storage Facility by
upgrading the maximum allowable
operating pressure (MAOP) from 2700
pounds per square inch gauge (psig) to
3300 psig and to add sufficient
compression to increase injection and
withdrawal capacity. This would
involve construction of the following
principal facilities at the Caledonia
Storage Facility:
• Approximately 0.84 mile of 16inch-diameter high pressure injection
pipeline connecting the existing gas
storage field wells on well pads A, B
and C to the existing plant facilities;
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
• Installation of two additional
natural gas-driven reciprocating
compressor units added to the existing
compression system; and
• Addition of separators, gas piping,
modified or replacement well heads, a
gas-driven backup generator, and
electrical and instrumentation
equipment to accommodate the increase
in operating pressure.
In addition, the Project involves
changes to the measurement, and flow
control equipment and replacement of
filter separation at Caledonia’s
interconnection with Tennessee Gas
Pipeline to accommodate the increased
flow rate during injection and
withdrawal.
The general location of the Project
facilities is shown in Appendix 1.1
Land Requirements for Construction
Construction of the Project would
impact a total of approximately 48.6
acres, including lands affected for the
pipeline construction, construction of
well pads and tie-ins, aboveground
facility sites, and temporary
workspaces. All of the construction
acreage within the compressor station,
interconnect meter station, well pads, as
well as the pipeline right-of-way was
previously disturbed during installation
of the original Caledonia facility in
2007. The only new permanent right-ofway that would be required for the
Project is 0.13 acres associated with the
tie-in at Well Pad A. The remaining 48.5
acres would be temporarily affected by
construction activities and then
returned to the previous land use.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. The NEPA also requires us 2
to discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
1 The appendices referenced in this notice are not
printed in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
E:\FR\FM\20JAN1.SGM
20JAN1
Agencies
[Federal Register Volume 77, Number 13 (Friday, January 20, 2012)]
[Notices]
[Pages 2967-2968]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-1042]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: RP12-302-000.
Applicants: Transcontinental Gas Pipe Line Company,
Description: Revise Sections 2.4 and 2.5 (PS and ACQ) of Rate
Schedule FT to be effective 2/11/2012.
Filed Date: 1/11/12.
Accession Number: 20120111-5115.
Comments Due: 5 p.m. ET 1/23/12.
Docket Numbers: RP12-303-000.
Applicants: Midcontinent Express Pipeline LLC.
Description: Annual Report of Operational Purchases and Sales of
Midcontinent Express Pipeline LLC.
Filed Date: 1/11/12.
Accession Number: 20120111-5129.
Comments Due: 5 p.m. ET 1/23/12.
Docket Numbers: RP12-304-000.
Applicants: Dominion Transmission, Inc.
Description: DTI--January 11, 2012--Nonconforming Service Agreement
to be effective 1/15/2012.
Filed Date: 1/11/12.
Accession Number: 20120111-5136.
Comments Due: 5 p.m. ET 1/23/12.
Docket Numbers: RP12-305-000
Applicants: Discovery Gas Transmission LLC.
Description: Footnote 4 Removal to be effective 1/1/2012.
Filed Date: 1/11/12.
Accession Number: 20120111-5175.
Comments Due: 5 p.m. ET 1/23/12.
Docket Numbers: RP12-306-000.
Applicants: Equitrans, L.P.
Description: Non-Conforming Agreement Filing--GeoMet Operating
Company, Inc. to be effective 1/1/2012.
Filed Date: 1/11/12.
Accession Number: 20120111-5225.
Comments Due: 5 p.m. ET 1/23/12.
Docket Numbers: RP12-307-000
Applicants: Texas Eastern Transmission, LP.
Description: Submits tariff filing per 154.204: Duke Energy Indiana
Negotiated Rate to be effective 1/12/2012.
Filed Date: 1/12/12.
Accession Number: 20120112-5055.
Comments Due: 5 p.m. ET 1/24/12.
Docket Numbers: CP12-42-000.
Applicants: Liberty Energy (Midstates) Corporation
Description: Application for Limited Jurisdiction Blanket
Certificate, and Approval of Rates.
Filed Date: 1/4/12.
Accession Number: 20120104-5143.
Comments Due: 5 p.m. ET 12/25/12.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
eFiling is encouraged. More detailed information relating to filing
[[Page 2968]]
requirements, interventions, protests, and service can be found at:
https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.
Dated: January 12, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-1042 Filed 1-19-12; 8:45 am]
BILLING CODE 6717-01-P