Sunshine Act Meeting Notice, 2519-2521 [2012-906]

Download as PDF Federal Register / Vol. 77, No. 11 / Wednesday, January 18, 2012 / Notices Description: Cherokee County Cogeneration Partners, LLC submits tariff filing per 35.12: Application for Market-Based Rate Authorization to be effective 1/7/2012. Filed Date: 1/6/12. Accession Number: 20120106–5222. Comments Due: 5 p.m. ET 1/27/12. Docket Numbers: ER12–780–000. Applicants: Northern States Power Company, a Minnesota corporation. Description: Northern States Power Company, a Minnesota corporation submits tariff filing per 35.13(a)(2)(iii: 2012–1–9_EREPC_Str 6–21_O&M_Agmt318 to be effective 12/13/2011. Filed Date: 1/9/12. Accession Number: 20120109–5113. Comments Due: 5 p.m. ET 1/30/12. Docket Numbers: ER12–781–000. Applicants: Indiana Michigan Power Company. Description: Indiana Michigan Power Company submits tariff filing per 35.1: 20120109 RS and SA Tariff to be effective 1/10/2012. Filed Date: 1/9/12. Accession Number: 20120109–5141. Comments Due: 5 p.m. ET 1/30/12. Docket Numbers: ER12–782–000. Applicants: Kingsport Power Company. Description: Kingsport Power Company submits tariff filing per 35.1: 20120109 RS and SA Tariff to be effective 1/10/2012. Filed Date: 1/9/12. Accession Number: 20120109–5143. Comments Due: 5 p.m. ET 1/30/12. Docket Numbers: ER12–783–000. Applicants: Kentucky Power Company. Description: Kentucky Power Company submits tariff filing per 35.1: 20120109 RS and SA Tariff to be effective 1/10/2012. Filed Date: 1/9/12. Accession Number: 20120109–5145. Comments Due: 5 p.m. ET 1/30/12. Docket Numbers: ER12–784–000. Applicants: Wheeling Power Company. Description: Wheeling Power Company submits tariff filing per 35.1: 20120109 RS and SA Tariff to be effective 1/10/2012. Filed Date: 1/9/12. Accession Number: 20120109–5146. Comments Due: 5 p.m. ET 1/30/12. Docket Numbers: ER12–785–000. Applicants: Public Service Company of Colorado. Description: Public Service Company of Colorado submits tariff filing per 35.13(a)(2)(iii: 2012–1–9_TSGT E&P NOC 281–PSCo Filing to be effective 3/8/2012. Filed Date: 1/9/12. Accession Number: 20120109–5152. Comments Due: 5 p.m. ET 1/30/12. Docket Numbers: ER12–786–000. Applicants: Southern California Edison Company. Description: Southern California Edison Company submits tariff filing per 35.13(a)(2)(iii: Four GIAs and Service Agreements with Windpower Partners 1993, L.P. to be effective 12/28/ 2011. Filed Date: 1/9/12. Accession Number: 20120109–5159. Comments Due: 5 p.m. ET 1/30/12. Docket Numbers: ER12–787–000. Applicants: Dogwood Energy LLC. Description: Dogwood Energy LLC submits tariff filing per 35.1: Participation Agreement by and Among the City of Independence, et al. to be effective 1/9/2012. Filed Date: 1/9/12. Accession Number: 20120109–5160. Comments Due: 5 p.m. ET 1/30/12. Docket Numbers: ER12–788–000. Applicants: California Independent System Operator Corporation. Description: California Independent System Operator Corporation submits tariff filing per 35.13(a)(2)(iii: 2012–01– 09 Amendment to Palo Verde LGIA to be effective 1/7/2012. Filed Date: 1/9/12. Accession Number: 20120109–5166. Comments Due: 5 p.m. ET 1/30/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 2519 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–793 Filed 1–17–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: January 19, 2012, 10 a.m. PLACE: Room 2C, 888 First Street NE., Washington, DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda * Note—Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 977TH—MEETING, REGULAR MEETING, JANUARY 19, 2012, 10 A.M. tkelley on DSK3SPTVN1PROD with NOTICES Item No. Docket No. Company Administrative A–1 ........ A–2 ........ AD02–1–000 ................................................................................... AD02–7–000 ................................................................................... VerDate Mar<15>2010 16:07 Jan 17, 2012 Jkt 226001 PO 00000 Frm 00012 Fmt 4703 Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. Sfmt 4703 E:\FR\FM\18JAN1.SGM 18JAN1 2520 Federal Register / Vol. 77, No. 11 / Wednesday, January 18, 2012 / Notices 977TH—MEETING, REGULAR MEETING, JANUARY 19, 2012, 10 A.M.—Continued Item No. Docket No. Company Electric E–1 ........ E–2 ........ E–3 ........ E–4 ........ E–5 ........ ER10–787–005, .............................................................................. EL10–50–003, EL10–57–003 ER10–787–006, .............................................................................. EL10–50–004 EL10–57–004, ................................................................................ ER10–787–007, EL10–50–005, EL10–57–005 ER11–4105–000 ............................................................................. ER11–4336–000, ............................................................................ ER11–4336–001, ER11–4336–002, ER11–4336–003 ER11–4338–000 ............................................................................. ER08–194–000, .............................................................................. ER08–194–001, ER08–194–002, ER08–194–003, ER08–194–004 ER08–1235–000, ............................................................................ ER08–1235–001, ER08–1309–000, ER08–1370–000 ER08–1339–000, ............................................................................ ER08–1339–001, ER08–1339–002, ER08–1345–000, ER08–1345–001, ER08–1345–002 OMITTED. RM10–5–000 .................................................................................. RD11–13–000 ................................................................................. EL11–62–000 ................................................................................. E–6 E–7 E–8 E–9 ........ ........ ........ ........ E–10 E–11 E–12 E–13 ...... ...... ...... ...... OMITTED. OMITTED. ER09–823–000 ............................................................................... EL11–63–000 ................................................................................. E–14 ...... ER11–3657–000 ............................................................................. EL11–64–000 ................................................................................. E–15 ...... ER11–12–001, ................................................................................ ER11–3445–000 EL07–86–018 ................................................................................. E–16 ...... EL07–88–018 ................................................................................. EL07–92–018 ................................................................................. tkelley on DSK3SPTVN1PROD with NOTICES E–17 ...... EL11–57–000 ................................................................................. ISO New England, Inc. and New England Power Pool Participants Committee. New England Power Generators Association v. ISO New England Inc. PSEG Energy Resources & Trade LLC, PSEG Power Connecticut LLC, NRG Power Marketing LLC, Connecticut Jet Power LLC, Devon Power LLC, Middletown Power LLC, Montville Power LLC, Norwalk Power LLC, and Somerset Power LLC v. ISO New England Inc. Southwest Power Pool, Inc. ISO New England Inc. New York Independent System Operator, Inc. Duquesne Light Company. Midwest Independent Transmission System Operator, Inc. and Duquesne Light Company. PMJ Interconnection, L.L.C. Interpretation of Protection System Reliability Standard. North American Electric Reliability Corporation. Public Service Commission of South Carolina and the South Carolina Office of Regulatory Staff. MidAmerican Energy Company. Louisiana Public Service Commission v. Entergy Corporation; Entergy Services, Inc.; Entergy Louisiana, LLC; Entergy Arkansas, Inc.; Entergy New Orleans, Inc.; Entergy Mississippi, Inc.; Entergy Gulf States Louisiana, L.L.C. and Entergy Texas, Inc. Entergy Services, Inc. Mississippi Delta Energy Agency; Clarksdale Public Utilities Commission; Public Service Commission of Yazoo City; Arkansas Electric Cooperative Corporation and South Mississippi Electric Power Association v. Entergy Services, Inc. PJM Interconnection, L.L.C. Ameren Services Company. Northern Indiana Public Service Company v. Midwest Independent Transmission System Operator, Inc. Great Lakes Utilities; Indiana Municipal Power Agency; Missouri Joint Municipal Electric Utility Commission; Missouri River Energy Services; Prairie Power, Inc.; Southern Minnesota Municipal Power Agency; Wisconsin Public Power Inc. v. Midwest Independent Transmission System Operator, Inc. Wabash Valley Power Association, Inc. v. Midwest Independent Transmission System Operator, Inc. Louisiana Public Service Commission v. Entergy Corporation; Entergy Services, Inc.; Entergy Louisiana, LLC; Entergy Arkansas, Inc.; Entergy Mississippi, Inc.; Entergy New Orleans, Inc.; Entergy Gulf States Louisiana, LLC and Entergy Texas, Inc. Miscellaneous M–1 ........ RM11–30–000 ................................................................................ VerDate Mar<15>2010 16:07 Jan 17, 2012 Jkt 226001 PO 00000 Frm 00013 Fmt 4703 Technical Corrections to Commission Regulations. Sfmt 4703 E:\FR\FM\18JAN1.SGM 18JAN1 Federal Register / Vol. 77, No. 11 / Wednesday, January 18, 2012 / Notices 2521 977TH—MEETING, REGULAR MEETING, JANUARY 19, 2012, 10 A.M.—Continued Item No. Docket No. Company Gas G–1 ........ RM11–4–000 .................................................................................. G–2 ........ OR11–21–000 ................................................................................ G–3 ........ RP11–1432–000, ............................................................................ RP11–1432–001 Storage Reporting Requirements of Interstate and Intrastate Natural Gas Companies. Kenai Pipe Line Company; Tesoro Alaska Company and Tesoro Logistics Operations, LLC. ETC Tiger Pipeline, LLC. Hydro H–1 ........ P–7269–029 ................................................................................... James B. Boyd and Janet A. Boyd. Certificates C–1 ........ C–2 ........ CP11–531–000 ............................................................................... CP11–46–000 ................................................................................. Dated: January 12, 2012. Kimberly D. Bose, Secretary. A free Web cast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its Web cast. The Capitol Connection provides technical support for the free Web casts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at (703) 993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. [FR Doc. 2012–906 Filed 1–13–12; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Southwestern Power Administration tkelley on DSK3SPTVN1PROD with NOTICES Integrated System Power Rates Southwestern Power Administration, DOE. ACTION: Notice of Rate Order. AGENCY: Pursuant to Delegation Order Nos. 00–037.00, effective December 6, 2001, and 00–001.00C, effective January SUMMARY: VerDate Mar<15>2010 16:07 Jan 17, 2012 Jkt 226001 Golden Triangle Storage, Inc. Kern River Gas Transmission Company. 31, 2007, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA–63, which increases the power rates for the Integrated System pursuant to the Integrated System Rate Schedules which supersede the existing rate schedules. DATES: The effective period for the rate schedules specified in Rate Order No. SWPA–63 is January 1, 2012, through September 30, 2015. FOR FURTHER INFORMATION CONTACT: Mr. James K. McDonald, Administrator, Southwestern Power Administration, Department of Energy, Williams Center Tower I, One West Third Street, Tulsa, Oklahoma 74103, (918) 595–6690, jim.mcdonald@swpa.gov. Rate Order No. SWPA–63, which has been approved and placed into effect on an interim basis, increases the power rates for the Integrated System pursuant to the following Integrated System Rate Schedules: Rate Schedule P–11, Wholesale Rates for Hydro Peaking Power; Rate Schedule NFTS–11, Wholesale Rates for Non-Federal Transmission/ Interconnection Facilities Service; Rate Schedule EE–11, Wholesale Rate for Excess Energy. The rate schedules supersede the existing rate schedules shown below: Rate Schedule P–09, Wholesale Rates for Hydro Peaking Power (superseded by P–11); Rate Schedule NFTS–09, Wholesale Rates for Non-Federal Transmission/ Interconnection Facilities Service (superseded by NFTS–11); Rate Schedule EE–09, Wholesale Rate for Excess Energy (superseded by EE– 11). SUPPLEMENTARY INFORMATION: Southwestern Power Administration’s (Southwestern) Administrator has PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 determined based on the 2011 Integrated System Current Power Repayment Study, that existing rates will not satisfy cost recovery criteria specified in Department of Energy Order No. RA 6120.2 and Section 5 of the Flood Control Act of 1944. The finalized 2011 Integrated System Power Repayment Studies (PRSs) indicate that an increase in annual revenue of $9,569,425, or 5.4 percent, beginning January 1, 2012, will satisfy cost recovery criteria for the Integrated System projects. The proposed Integrated System rate schedules would increase annual revenues from $177,191,800 to $186,761,225, to recover increased investments and replacements in the hydroelectric generating and transmission facilities and increased operations and maintenance costs for both Southwestern and the U.S. Army’s Corps of Engineers (Corps). Additionally, the PRS analyzes the Purchased Power Deferral Account which indicated a reduction was needed for the Purchased Power Adder which is used to recover average year purchased energy costs. This proposal also continues the size and frequency of the Administrator’s Discretionary Purchased Power Adder Adjustment (Adjustment). This Adjustment allows the Administrator to adjust the Purchased Power Adder twice annually, limited to ±$0.0062 per kilowatthour per year as necessary, at his/her discretion, under a formula-type rate, with notification to the Federal Energy Regulatory Commission, to regulate the account at a level that will recover purchased power costs. The Administrator has followed Title 10, Part 903 Subpart A, of the Code of Federal Regulations, ‘‘Procedures for Public Participation in Power and E:\FR\FM\18JAN1.SGM 18JAN1

Agencies

[Federal Register Volume 77, Number 11 (Wednesday, January 18, 2012)]
[Notices]
[Pages 2519-2521]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-906]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 
U.S.C. 552b:

Agency Holding Meeting:  Federal Energy Regulatory Commission.

Date and Time: January 19, 2012, 10 a.m.

Place:  Room 2C, 888 First Street NE., Washington, DC 20426.

Status:  Open.

Matters To Be Considered:  Agenda * Note--Items listed on the agenda 
may be deleted without further notice.

Contact Person For More Information: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

       977TH--Meeting, Regular Meeting, January 19, 2012, 10 a.m.
------------------------------------------------------------------------
     Item No.              Docket No.                   Company
------------------------------------------------------------------------
                             Administrative
------------------------------------------------------------------------
A-1..............  AD02-1-000................  Agency Business Matters.
A-2..............  AD02-7-000................  Customer Matters,
                                                Reliability, Security
                                                and Market Operations.
------------------------------------------------------------------------

[[Page 2520]]

 
                                Electric
------------------------------------------------------------------------
E-1..............  ER10-787-005,.............  ISO New England, Inc. and
                   EL10-50-003,..............   New England Power Pool
                   EL10-57-003...............   Participants Committee.
                   ER10-787-006,.............  New England Power
                   EL10-50-004...............   Generators Association
                                                v. ISO New England Inc.
                   EL10-57-004,..............  PSEG Energy Resources &
                   ER10-787-007,.............   Trade LLC, PSEG Power
                   EL10-50-005,..............   Connecticut LLC, NRG
                   EL10-57-005...............   Power Marketing LLC,
                                                Connecticut Jet Power
                                                LLC, Devon Power LLC,
                                                Middletown Power LLC,
                                                Montville Power LLC,
                                                Norwalk Power LLC, and
                                                Somerset Power LLC v.
                                                ISO New England Inc.
E-2..............  ER11-4105-000.............  Southwest Power Pool,
                                                Inc.
E-3..............  ER11-4336-000,............  ISO New England Inc.
                   ER11-4336-001,............
                   ER11-4336-002,............
                   ER11-4336-003.............
E-4..............  ER11-4338-000.............  New York Independent
                                                System Operator, Inc.
E-5..............  ER08-194-000,.............  Duquesne Light Company.
                   ER08-194-001,.............
                   ER08-194-002,.............
                   ER08-194-003,.............
                   ER08-194-004..............
                   ER08-1235-000,............  Midwest Independent
                   ER08-1235-001,............   Transmission System
                   ER08-1309-000,............   Operator, Inc. and
                   ER08-1370-000.............   Duquesne Light Company.
                   ER08-1339-000,............  PMJ Interconnection,
                   ER08-1339-001,............   L.L.C.
                   ER08-1339-002,............
                   ER08-1345-000,............
                   ER08-1345-001,............
                   ER08-1345-002.............
E-6..............  OMITTED...................
E-7..............  RM10-5-000................  Interpretation of
                                                Protection System
                                                Reliability Standard.
E-8..............  RD11-13-000...............  North American Electric
                                                Reliability Corporation.
E-9..............  EL11-62-000...............  Public Service Commission
                                                of South Carolina and
                                                the South Carolina
                                                Office of Regulatory
                                                Staff.
E-10.............  OMITTED...................
E-11.............  OMITTED...................
E-12.............  ER09-823-000..............  MidAmerican Energy
                                                Company.
E-13.............  EL11-63-000...............  Louisiana Public Service
                                                Commission v. Entergy
                                                Corporation; Entergy
                                                Services, Inc.; Entergy
                                                Louisiana, LLC; Entergy
                                                Arkansas, Inc.; Entergy
                                                New Orleans, Inc.;
                                                Entergy Mississippi,
                                                Inc.; Entergy Gulf
                                                States Louisiana, L.L.C.
                                                and Entergy Texas, Inc.
E-14.............  ER11-3657-000.............  Entergy Services, Inc.
                   EL11-64-000...............  Mississippi Delta Energy
                                                Agency; Clarksdale
                                                Public Utilities
                                                Commission; Public
                                                Service Commission of
                                                Yazoo City; Arkansas
                                                Electric Cooperative
                                                Corporation and South
                                                Mississippi Electric
                                                Power Association v.
                                                Entergy Services, Inc.
E-15.............  ER11-12-001,..............  PJM Interconnection,
                   ER11-3445-000.............   L.L.C.
E-16.............  EL07-86-018...............  Ameren Services Company.
                                               Northern Indiana Public
                                                Service Company v.
                                                Midwest Independent
                                                Transmission System
                                                Operator, Inc.
                   EL07-88-018...............  Great Lakes Utilities;
                                                Indiana Municipal Power
                                                Agency; Missouri Joint
                                                Municipal Electric
                                                Utility Commission;
                                                Missouri River Energy
                                                Services; Prairie Power,
                                                Inc.; Southern Minnesota
                                                Municipal Power Agency;
                                                Wisconsin Public Power
                                                Inc. v. Midwest
                                                Independent Transmission
                                                System Operator, Inc.
                   EL07-92-018...............  Wabash Valley Power
                                                Association, Inc. v.
                                                Midwest Independent
                                                Transmission System
                                                Operator, Inc.
E-17.............  EL11-57-000...............  Louisiana Public Service
                                                Commission v. Entergy
                                                Corporation; Entergy
                                                Services, Inc.; Entergy
                                                Louisiana, LLC; Entergy
                                                Arkansas, Inc.; Entergy
                                                Mississippi, Inc.;
                                                Entergy New Orleans,
                                                Inc.; Entergy Gulf
                                                States Louisiana, LLC
                                                and Entergy Texas, Inc.
------------------------------------------------------------------------
                              Miscellaneous
------------------------------------------------------------------------
M-1..............  RM11-30-000...............  Technical Corrections to
                                                Commission Regulations.
------------------------------------------------------------------------

[[Page 2521]]

 
                                   Gas
------------------------------------------------------------------------
G-1..............  RM11-4-000................  Storage Reporting
                                                Requirements of
                                                Interstate and
                                                Intrastate Natural Gas
                                                Companies.
G-2..............  OR11-21-000...............  Kenai Pipe Line Company;
                                                Tesoro Alaska Company
                                                and Tesoro Logistics
                                                Operations, LLC.
G-3..............  RP11-1432-000,............  ETC Tiger Pipeline, LLC.
                   RP11-1432-001.............
------------------------------------------------------------------------
                                  Hydro
------------------------------------------------------------------------
H-1..............  P-7269-029................  James B. Boyd and Janet
                                                A. Boyd.
------------------------------------------------------------------------
                              Certificates
------------------------------------------------------------------------
C-1..............  CP11-531-000..............  Golden Triangle Storage,
                                                Inc.
C-2..............  CP11-46-000...............  Kern River Gas
                                                Transmission Company.
------------------------------------------------------------------------


    Dated: January 12, 2012.
Kimberly D. Bose,
Secretary.
    A free Web cast of this event is available through www.ferc.gov. 
Anyone with Internet access who desires to view this event can do so by 
navigating to www.ferc.gov's Calendar of Events and locating this event 
in the Calendar. The event will contain a link to its Web cast. The 
Capitol Connection provides technical support for the free Web casts. 
It also offers access to this event via television in the DC area and 
via phone bridge for a fee. If you have any questions, visit 
www.CapitolConnection.org or contact Danelle Springer or David 
Reininger at (703) 993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

[FR Doc. 2012-906 Filed 1-13-12; 11:15 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.