FFP Project 10, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing, 2288-2289 [2012-704]

Download as PDF 2288 Federal Register / Vol. 77, No. 10 / Tuesday, January 17, 2012 / Notices this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: January 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 12817–002 and 14083–000] Free Flow Power Corporation and Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing srobinson on DSK4SPTVN1PROD with NOTICES [FR Doc. 2012–698 Filed 1–13–12; 8:45 am] The Commission has received two preliminary permit applications deemed filed on February 1, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Mississippi River, in West Baton Rouge and East Baton Rouge Parishes, Louisiana. The applications were filed by Free Flow Power Corporation for Project No. 12817–002, and Northland Power Mississippi River LLC for Project No. 14083–000. On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). Jkt 226001 Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Project Nos. 12863–002 and 14074–000] DEPARTMENT OF ENERGY FFP Project 21, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing Federal Energy Regulatory Commission FFP Project 7, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing BILLING CODE 6717–01–P 16:12 Jan 13, 2012 DEPARTMENT OF ENERGY [Project Nos. 12851–002 and 14082–000] [FR Doc. 2012–700 Filed 1–13–12; 8:45 am] VerDate Mar<15>2010 Dated: January 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. The Commission has received two preliminary permit applications deemed filed on February 1, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Mississippi River, near the town of New Orleans, in Jefferson and Orleans Parishes, Louisiana. The applications were filed by FFP Project 7, LLC for Project No. 12851–002, and Northland Power Mississippi River LLC for Project No. 14082–000. On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: January 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. The Commission has received two preliminary permit applications deemed filed on February 1, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Mississippi River, near the town of Donaldsonville, in Ascension Parish, Louisiana. The applications were filed by FFP Project 21, LLC for Project No. 12863–002, and Northland Power Mississippi River LLC for Project No. 14074–000. On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: January 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–694 Filed 1–13–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14071–000; Project No. 12866– 002] [FR Doc. 2012–696 Filed 1–13–12; 8:45 am] BILLING CODE 6717–01–P FFP Project 10, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing The Commission has received two preliminary permit applications deemed 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). E:\FR\FM\17JAN1.SGM 17JAN1 Federal Register / Vol. 77, No. 10 / Tuesday, January 17, 2012 / Notices filed on February 1, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Mississippi River, near the town of Avondale, in Jefferson Parish, Louisiana. The applications were filed by FFP Project 10, LLC for Project No. 12866–002, and Northland Power Mississippi River LLC for Project No. 14071–000. On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Northland Power Mississippi River LLC for Project No. 14077–000. On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: January 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 12924–002 and 14077–000] FFP Project 33, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing The Commission has received two preliminary permit applications deemed filed on February 1, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Mississippi River, in Warren County, Mississippi, and Tensas and Madison Parishes, Louisiana. The applications were filed by FFP Project 33, LLC for Project No. 12924–002, and srobinson on DSK4SPTVN1PROD with NOTICES BILLING CODE 6717–01–P FFP Project 39, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing DEPARTMENT OF ENERGY 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 16:12 Jan 13, 2012 [FR Doc. 2012–702 Filed 1–13–12; 8:45 am] [Project Nos. 12925–002 and 14078–000] BILLING CODE 6717–01–P Jkt 226001 which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: January 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–701 Filed 1–13–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12930–002, Project No. 14080– 000] Federal Energy Regulatory Commission [FR Doc. 2012–704 Filed 1–13–12; 8:45 am] VerDate Mar<15>2010 Dated: January 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. 2289 The Commission has received two preliminary permit applications deemed filed on February 1, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Mississippi River, in Bolivar County, Mississippi, and Desha County, Arkansas. The applications were filed by FFP Project 39, LLC for Project No. 12925–002, and Northland Power Mississippi River LLC for Project No. 14078–000. On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine CFR 4.37 (2011). the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). FFP Project 41, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing The Commission has received two preliminary permit applications deemed filed on February 1, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Mississippi River, in Tunica County, Mississippi, and Lee County, Arkansas. The applications were filed by FFP Project 41, LLC for Project No. 12930– 002, and Northland Power Mississippi River LLC for Project No. 14080–000. On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. 2 18 1 Under PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). E:\FR\FM\17JAN1.SGM 17JAN1

Agencies

[Federal Register Volume 77, Number 10 (Tuesday, January 17, 2012)]
[Notices]
[Pages 2288-2289]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-704]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14071-000; Project No. 12866-002]


FFP Project 10, LLC, Northland Power Mississippi River LLC; 
Notice Announcing Preliminary Permit Drawing

    The Commission has received two preliminary permit applications 
deemed

[[Page 2289]]

filed on February 1, 2011, at 8:30 a.m.,\1\ for proposed projects to be 
located on the Mississippi River, near the town of Avondale, in 
Jefferson Parish, Louisiana. The applications were filed by FFP Project 
10, LLC for Project No. 12866-002, and Northland Power Mississippi 
River LLC for Project No. 14071-000.
---------------------------------------------------------------------------

    \1\ Under the Commission's Rules of Practice and Procedure, any 
document received after regular business hours is considered filed 
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) 
(2011).
---------------------------------------------------------------------------

    On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the 
Commission, or her designee, will conduct a random drawing to determine 
the filing priority of the applicants identified in this notice. The 
Commission will select among competing permit applications as provided 
in section 4.37 of its regulations.\2\ The priority established by this 
drawing will be used to determine which applicant, among those with 
identical filing times, will be considered to have the first-filed 
application.
---------------------------------------------------------------------------

    \2\ 18 CFR 4.37 (2011).
---------------------------------------------------------------------------

    The drawing is open to the public and will be held in room 2C, the 
Commission Meeting Room, located at 888 First St. NE., Washington, DC 
20426. A subsequent notice will be issued by the Secretary announcing 
the results of the drawing.

    Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-704 Filed 1-13-12; 8:45 am]