FFP Project 39, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing, 2289 [2012-701]
Download as PDF
Federal Register / Vol. 77, No. 10 / Tuesday, January 17, 2012 / Notices
filed on February 1, 2011, at 8:30 a.m.,1
for proposed projects to be located on
the Mississippi River, near the town of
Avondale, in Jefferson Parish,
Louisiana. The applications were filed
by FFP Project 10, LLC for Project No.
12866–002, and Northland Power
Mississippi River LLC for Project No.
14071–000.
On January 17, 2012, at 9 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Northland Power Mississippi River LLC
for Project No. 14077–000.
On January 17, 2012, at 9 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 12924–002 and 14077–000]
FFP Project 33, LLC and Northland
Power Mississippi River LLC; Notice
Announcing Preliminary Permit
Drawing
The Commission has received two
preliminary permit applications deemed
filed on February 1, 2011, at 8:30 a.m.,1
for proposed projects to be located on
the Mississippi River, in Warren
County, Mississippi, and Tensas and
Madison Parishes, Louisiana. The
applications were filed by FFP Project
33, LLC for Project No. 12924–002, and
srobinson on DSK4SPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
FFP Project 39, LLC and Northland
Power Mississippi River LLC; Notice
Announcing Preliminary Permit
Drawing
DEPARTMENT OF ENERGY
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
16:12 Jan 13, 2012
[FR Doc. 2012–702 Filed 1–13–12; 8:45 am]
[Project Nos. 12925–002 and 14078–000]
BILLING CODE 6717–01–P
Jkt 226001
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–701 Filed 1–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12930–002, Project No. 14080–
000]
Federal Energy Regulatory
Commission
[FR Doc. 2012–704 Filed 1–13–12; 8:45 am]
VerDate Mar<15>2010
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
2289
The Commission has received two
preliminary permit applications deemed
filed on February 1, 2011, at 8:30 a.m.,1
for proposed projects to be located on
the Mississippi River, in Bolivar
County, Mississippi, and Desha County,
Arkansas. The applications were filed
by FFP Project 39, LLC for Project No.
12925–002, and Northland Power
Mississippi River LLC for Project No.
14078–000.
On January 17, 2012, at 9 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
CFR 4.37 (2011).
the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
FFP Project 41, LLC, Northland Power
Mississippi River LLC; Notice
Announcing Preliminary Permit
Drawing
The Commission has received two
preliminary permit applications deemed
filed on February 1, 2011, at 8:30 a.m.,1
for proposed projects to be located on
the Mississippi River, in Tunica County,
Mississippi, and Lee County, Arkansas.
The applications were filed by FFP
Project 41, LLC for Project No. 12930–
002, and Northland Power Mississippi
River LLC for Project No. 14080–000.
On January 17, 2012, at 9 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
2 18
1 Under
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
E:\FR\FM\17JAN1.SGM
17JAN1
Agencies
[Federal Register Volume 77, Number 10 (Tuesday, January 17, 2012)]
[Notices]
[Page 2289]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-701]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 12925-002 and 14078-000]
FFP Project 39, LLC and Northland Power Mississippi River LLC;
Notice Announcing Preliminary Permit Drawing
The Commission has received two preliminary permit applications
deemed filed on February 1, 2011, at 8:30 a.m.,\1\ for proposed
projects to be located on the Mississippi River, in Bolivar County,
Mississippi, and Desha County, Arkansas. The applications were filed by
FFP Project 39, LLC for Project No. 12925-002, and Northland Power
Mississippi River LLC for Project No. 14078-000.
---------------------------------------------------------------------------
\1\ Under the Commission's Rules of Practice and Procedure, any
document received after regular business hours is considered filed
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2)
(2011).
---------------------------------------------------------------------------
On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the
Commission, or her designee, will conduct a random drawing to determine
the filing priority of the applicants identified in this notice. The
Commission will select among competing permit applications as provided
in section 4.37 of its regulations.\2\ The priority established by this
drawing will be used to determine which applicant, among those with
identical filing times, will be considered to have the first-filed
application.
---------------------------------------------------------------------------
\2\ 18 CFR 4.37 (2011).
---------------------------------------------------------------------------
The drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First St. NE., Washington, DC
20426. A subsequent notice will be issued by the Secretary announcing
the results of the drawing.
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-701 Filed 1-13-12; 8:45 am]
BILLING CODE 6717-01-P