FFP Project 18, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing, 2290 [2012-695]
Download as PDF
2290
Federal Register / Vol. 77, No. 10 / Tuesday, January 17, 2012 / Notices
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2012–699 Filed 1–13–12; 8:45 am]
BILLING CODE 6717–01–P
[Project Nos. 12927–002 and 14075–000]
DEPARTMENT OF ENERGY
FFP Project 30, LLC and Northland
Power Mississippi River LLC; Notice
Announcing Preliminary Permit
Drawing
Federal Energy Regulatory
Commission
[Project No. 12857–002; Project No. 14073–
000]
FFP Project 18, LLC, Northland Power
Mississippi River LLC; Notice
Announcing Preliminary Permit
Drawing
The Commission has received two
preliminary permit applications deemed
filed on February 1, 2011, at 8:30 a.m.,1
for proposed projects to be located on
the Mississippi River, in St. James
Parish, Louisiana. The applications
were filed by FFP Project 18, LLC for
Project No. 12857–002, and Northland
Power Mississippi River LLC for Project
No. 14073–000.
On January 17, 2012, at 9 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–691 Filed 1–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14311–000]
Modern Hydro; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
[FR Doc. 2012–695 Filed 1–13–12; 8:45 am]
BILLING CODE 6717–01–P
srobinson on DSK4SPTVN1PROD with NOTICES
The Commission has received two
preliminary permit applications deemed
filed on February 1, 2011, at 8:30 a.m.,1
for proposed projects to be located on
the Mississippi River, in West Feliciana
and Pointe Coupee Parishes, Louisiana.
The applications were filed by FFP
Project 30, LLC for Project No. 12927–
002, and Northland Power Mississippi
River LLC for Project No. 14075–000.
On January 17, 2012, at 9 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
On November 1, 2011, Modern Hydro
filed an application for a preliminary
permit, pursuant to section 4(f) of the
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
VerDate Mar<15>2010
16:12 Jan 13, 2012
Jkt 226001
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Federal Power Act (FPA), to study the
feasibility of the proposed Delhi
Milldam Water Power Project No. 14311
to be located at the existing Delhi Dam,
on the south fork of the Maquoketa
River, near the township of Delhi, in
Delaware County, Iowa. The Delhi Dam
is owned by the Lake Delhi Recreation
Association Board. There are no federal
lands associated with the project.
The proposed project would consist
of: (1) The existing Delhi Dam and
reservoir; (2) an existing 61-foot-wide
concrete powerhouse; (3) an existing 86foot-long concrete-gated ogee spillway
with three 25-foot-wide vertical sluice
gates; (4) two refurbished 2,400-volt
Westinghouse generator units powered
by two refurbished S. Morgan Smith
turbines with a combined generating
capacity of 1,500 kilowatts; (5) an
existing substation connected to an
existing 12.5-kilovolt distribution line;
and (6) appurtenant facilities. The
project would have an estimated annual
generation of 2,960,000 kilowatt-hours.
Applicant Contact: Mr. Dwight
Shanak, N3311 Sunrise Lane, Waupaca,
WI 54981, (715) 258–5720.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, and competing
applications (without notices of intent),
or notices of intent to file competing
applications: 60 days from the issuance
of this notice. Competing applications
and notices of intent must meet the
requirements of 18 CFR 4.36.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1-(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
E:\FR\FM\17JAN1.SGM
17JAN1
Agencies
[Federal Register Volume 77, Number 10 (Tuesday, January 17, 2012)]
[Notices]
[Page 2290]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-695]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12857-002; Project No. 14073-000]
FFP Project 18, LLC, Northland Power Mississippi River LLC;
Notice Announcing Preliminary Permit Drawing
The Commission has received two preliminary permit applications
deemed filed on February 1, 2011, at 8:30 a.m.,\1\ for proposed
projects to be located on the Mississippi River, in St. James Parish,
Louisiana. The applications were filed by FFP Project 18, LLC for
Project No. 12857-002, and Northland Power Mississippi River LLC for
Project No. 14073-000.
---------------------------------------------------------------------------
\1\ Under the Commission's Rules of Practice and Procedure, any
document received after regular business hours is considered filed
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2)
(2011).
---------------------------------------------------------------------------
On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the
Commission, or her designee, will conduct a random drawing to determine
the filing priority of the applicants identified in this notice. The
Commission will select among competing permit applications as provided
in section 4.37 of its regulations.\2\ The priority established by this
drawing will be used to determine which applicant, among those with
identical filing times, will be considered to have the first-filed
application.
---------------------------------------------------------------------------
\2\ 18 CFR 4.37 (2011).
---------------------------------------------------------------------------
The drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First St. NE., Washington, DC
20426. A subsequent notice will be issued by the Secretary announcing
the results of the drawing.
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-695 Filed 1-13-12; 8:45 am]
BILLING CODE 6717-01-P