FFP Project 32, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit Drawing, 2287 [2012-690]
Download as PDF
Federal Register / Vol. 77, No. 10 / Tuesday, January 17, 2012 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 12921–002 and 14076–000]
FFP Project 32, LLC and Northland
Power Mississippi River LLC; Notice
Announcing Preliminary Permit
Drawing
The Commission has received two
preliminary permit applications deemed
filed on February 1, 2011, at 8:30 a.m.,1
for proposed projects to be located on
the Mississippi River, in Tensas Parish,
Louisiana, and Jefferson County
Mississippi. The applications were filed
by FFP Project 32, LLC for Project No.
12921–002, and Northland Power
Mississippi River LLC for Project No.
14076–000.
On January 17, 2012, at 9 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[Project Nos. 12865–002 and 14072–000]
FFP Project 17, LLC and Northland
Power Mississippi River LLC; Notice
Announcing Preliminary Permit
Drawing
srobinson on DSK4SPTVN1PROD with NOTICES
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
The Commission has received two
preliminary permit applications deemed
1 Under
the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
Jkt 226001
[FR Doc. 2012–693 Filed 1–13–12; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
Frm 00031
Fmt 4703
Sfmt 4703
[FR Doc. 2012–697 Filed 1–13–12; 8:45 am]
BILLING CODE 6717–01–P
[Project Nos. 12929–002 and 14079–000]
FFP Project 40, LLC and Northland
Power Mississippi River LLC; Notice
Announcing Preliminary Permit
Drawing
DEPARTMENT OF ENERGY
PO 00000
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Federal Energy Regulatory
Commission
The Commission has received two
preliminary permit applications deemed
filed on February 1, 2011, at 8:30 a.m.,1
for proposed projects to be located on
the Mississippi River, near the town of
New Orleans, in Orleans Parish,
Louisiana. The applications were filed
by FFP Project 6, LLC for Project No.
12848–002, and Northland Power
Federal Energy Regulatory
Commission
16:12 Jan 13, 2012
Mississippi River LLC for Project No.
14081–000.
On January 17, 2012, at 9 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
FFP Project 6, LLC and Northland
Power Mississippi River LLC; Notice
Announcing Preliminary Permit
Drawing
[FR Doc. 2012–690 Filed 1–13–12; 8:45 am]
VerDate Mar<15>2010
filed on February 1, 2011, at 8:30 a.m.,1
for proposed projects to be located on
the Mississippi River, near the town of
North Vacherie, in St. James Parish,
Louisiana. The applications were filed
by FFP Project 17, LLC for Project No.
12865–002, and Northland Power
Mississippi River LLC for Project No.
14072–000.
On January 17, 2012, at 9 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
[Project Nos. 12848–002 and 14081–000]
Nathaniel J. Davis, Sr.,
Deputy Secretary.
2287
The Commission has received two
preliminary permit applications deemed
filed on February 1, 2011, at 8:30 a.m.,1
for proposed projects to be located on
the Mississippi River, near the town of
Helena, in Phillips County Arkansas,
and Tunica and Coahoma counties,
Mississippi. The applications were filed
by FFP Project 40, LLC for Project No.
12929–002, and Northland Power
Mississippi River LLC for Project No.
14079–000.
On January 17, 2012, at 9 a.m. (eastern
time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
2 18
CFR 4.37 (2011).
the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
1 Under
E:\FR\FM\17JAN1.SGM
17JAN1
Agencies
[Federal Register Volume 77, Number 10 (Tuesday, January 17, 2012)]
[Notices]
[Page 2287]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-690]
[[Page 2287]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 12921-002 and 14076-000]
FFP Project 32, LLC and Northland Power Mississippi River LLC;
Notice Announcing Preliminary Permit Drawing
The Commission has received two preliminary permit applications
deemed filed on February 1, 2011, at 8:30 a.m.,\1\ for proposed
projects to be located on the Mississippi River, in Tensas Parish,
Louisiana, and Jefferson County Mississippi. The applications were
filed by FFP Project 32, LLC for Project No. 12921-002, and Northland
Power Mississippi River LLC for Project No. 14076-000.
---------------------------------------------------------------------------
\1\ Under the Commission's Rules of Practice and Procedure, any
document received after regular business hours is considered filed
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2)
(2011).
---------------------------------------------------------------------------
On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the
Commission, or her designee, will conduct a random drawing to determine
the filing priority of the applicants identified in this notice. The
Commission will select among competing permit applications as provided
in section 4.37 of its regulations.\2\ The priority established by this
drawing will be used to determine which applicant, among those with
identical filing times, will be considered to have the first-filed
application.
---------------------------------------------------------------------------
\2\ 18 CFR 4.37 (2011).
---------------------------------------------------------------------------
The drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First St. NE., Washington, DC
20426. A subsequent notice will be issued by the Secretary announcing
the results of the drawing.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-690 Filed 1-13-12; 8:45 am]
BILLING CODE 6717-01-P