Federal Register / Vol. 77, No. 9 / Friday, January 13, 2012 / Notices
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
VerDate Mar<15>2010
15:46 Jan 12, 2012
Jkt 226001
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: January 27, 2012.
Dated: January 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–509 Filed 1–12–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–13010–003]
Mississippi 8 Hydro LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: P–13010–003.
c. Date filed: December 27, 2011.
d. Applicant: Mississippi 8 Hydro
LLC.
e. Name of Project: Lock and Dam 8
Hydroelectric Project.
f. Location: The project would be
located on the upper Mississippi River
in Houston County, Minnesota at an
existing lock and dam owned and
operated by the U.S. Corps of Engineers
(Corps) at about river mile 679. The
project would occupy federal lands
managed by the U.S. Fish and Wildlife
Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Brent L.
Smith, Chief Operating Officer,
Symbiotics LLC, 371 Upper Terrace,
Suite 2, Bend, OR 97702, Phone: (541)
330–8779.
i. FERC Contact: Lesley Kordella at
(202) 502–6406; or email at
Lesley.Kordella@ferc.gov.
j. Cooperating agencies: Federal,
State, local, and tribal agencies with
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
2055
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to Section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: February 27, 2012.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–08–3676, or for TTY, (202)
502–8659. Although the Commission
strongly encourages electronic filing,
documents may also be paper-filed. To
paper-file, mail an original and seven
copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
m. The application is not ready for
environmental analysis at this time.
n. The proposed project would utilize
the existing U.S. Army Corps of
Engineers’ Lock & Dam Lock and Dam
8, and would consist of the following
facilities: (1) 28 0.5–MW very low head
type hydraulic turbines attached to the
dam’s existing Tainter and roller gate
structures; (2) a new 30-foot-long by 40foot-wide control house; (3) a new 175foot-long by 200-foot-wide substation;
(4) a new 175-foot-long by 100-foot-wide
storage yard; (5) a new 350-foot-long
transmission line; and (6) appurtenant
E:\FR\FM\13JAN1.SGM
13JAN1
2056
Federal Register / Vol. 77, No. 9 / Friday, January 13, 2012 / Notices
facilities. The average annual generation
would be about 42.5 gigawatt hours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance ....
Issue Scoping Document 1 for
comments.
Comments on Scoping Document 1.
Issue Scoping Document 2 .....
Issue notice of ready for environmental analysis.
Commission issues EA, draft
EA, or draft EIS.
Comments on EA, or draft EA,
or draft EIS.
Commission issues final EA or
final EIS.
April 2012.
May 2012.
June 2012.
August 2012.
August 2012.
April 2013.
May 2013.
August 2013.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: January 6, 2012.
Kimberly D. Bose,
Secretary.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 or 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: January 20, 2012.
Dated: January 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–508 Filed 1–12–12; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2012–507 Filed 1–12–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 2928–007]
[Docket No. AC12–27–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
DEPARTMENT OF ENERGY
Midwest Independent Transmission
System Operator, Inc.; Notice of Filing
Merrimac Paper Company, Inc.; Notice
of Termination of License by Implied
Surrender and Soliciting Comments
and Motions To Intervene
Take notice that on December 27,
2011, Midwest Independent
Transmission System Operator, Inc.
submitted a request for authorization to
defer for future recovery certain costs
with the integration of the Entergy
Operating Companies.
Take notice that the following
hydroelectric proceeding has been
initiated by the Commission:
a. Type of Proceeding: Termination of
License by Implied Surrender.
b. Project No.: 2928–007.
c. Date Initiated: January 06, 2012.
VerDate Mar<15>2010
17:44 Jan 12, 2012
Jkt 226001
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
d. Licensee: Merrimac Paper
Company, Inc.
e. Name and Location of Project: The
Merrimac Hydroelectric Project is
located on the Merrimack River, a
navigable waterway in the United
States, in the city of Lawrence, Essex
County, Massachusetts.
f. Proceeding Initiated Pursuant to:
Standard Article 17 of the project’s
license and 18 CFR 6.4 (2011).
g. Licensee Contact Information: Ms.
Terri Bechta, 9 South Canal Street,
Lawrence, MA 01843–1410; phone (617)
686–0342.
h. FERC Contact: Krista Sakallaris,
(202) 502–6302.
i. Deadline for filing comments,
protests, and motions to intervene is 30
days from the issuance date of this
notice. All documents may be filed
electronically via the Internet in lieu of
paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/efiling.asp.
The Commission strongly encourages
electronic filings. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be sent to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. Please include the
project number (P–2928–007) on any
documents or motions filed.
j. Description of Existing Facilities: (1)
Unit No. 1: (i) A 6.5-foot-high by 6.0foot wide head gate and trashrack
structure; (ii) a 260-foot-long, 5-footdiameter penstock connected to; (iii) a
generating unit with an installed
capacity of 200kW; (iv) an 18-foot-long
tailrace canal; and (v) other
appurtenances; (2) Unit No. 2: (i) A 6.5foot-high by 6.0-foot-wide head gate and
trashrack structure; (ii) a 288-foot-long,
5.3-foot-diameter penstock connected
to; (iii) a generating unit with an
installed capacity of 450kW; (iv) a 15foot-long tailrace canal; and (v) other
appurtenances; (3) Unit No. 3: (i) A 6.5foot-high by 6.0-foot wide head gate and
trashrack and other appurtenances; (ii) a
250-foot-long, 8.75-foot-diameter
penstock connected to; (iii) a generating
unit with an installed capacity of
600kW; (iv) a 80-foot-long tailrace canal;
and (v) other appurtenances.
k. Description of Proceeding: The
licensee is currently in violation of
standard Article 17 of its license,
E:\FR\FM\13JAN1.SGM
13JAN1
Agencies
[Federal Register Volume 77, Number 9 (Friday, January 13, 2012)]
[Notices]
[Pages 2055-2056]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-507]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-13010-003]
Mississippi 8 Hydro LLC; Notice of Application Tendered for
Filing With the Commission and Soliciting Additional Study Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: P-13010-003.
c. Date filed: December 27, 2011.
d. Applicant: Mississippi 8 Hydro LLC.
e. Name of Project: Lock and Dam 8 Hydroelectric Project.
f. Location: The project would be located on the upper Mississippi
River in Houston County, Minnesota at an existing lock and dam owned
and operated by the U.S. Corps of Engineers (Corps) at about river mile
679. The project would occupy federal lands managed by the U.S. Fish
and Wildlife Service.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Brent L. Smith, Chief Operating Officer,
Symbiotics LLC, 371 Upper Terrace, Suite 2, Bend, OR 97702, Phone:
(541) 330-8779.
i. FERC Contact: Lesley Kordella at (202) 502-6406; or email at
Lesley.Kordella@ferc.gov.
j. Cooperating agencies: Federal, State, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to Section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: February 27, 2012.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-08-3676, or for
TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
m. The application is not ready for environmental analysis at this
time.
n. The proposed project would utilize the existing U.S. Army Corps
of Engineers' Lock & Dam Lock and Dam 8, and would consist of the
following facilities: (1) 28 0.5-MW very low head type hydraulic
turbines attached to the dam's existing Tainter and roller gate
structures; (2) a new 30-foot-long by 40-foot-wide control house; (3) a
new 175-foot-long by 200-foot-wide substation; (4) a new 175-foot-long
by 100-foot-wide storage yard; (5) a new 350-foot-long transmission
line; and (6) appurtenant
[[Page 2056]]
facilities. The average annual generation would be about 42.5 gigawatt
hours.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
------------------------------------------------------------------------
------------------------------------------------------------------------
Issue Notice of Acceptance............... April 2012.
Issue Scoping Document 1 for comments.... May 2012.
Comments on Scoping Document 1........... June 2012.
Issue Scoping Document 2................. August 2012.
Issue notice of ready for environmental August 2012.
analysis.
Commission issues EA, draft EA, or draft April 2013.
EIS.
Comments on EA, or draft EA, or draft EIS May 2013.
Commission issues final EA or final EIS.. August 2013.
------------------------------------------------------------------------
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: January 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-507 Filed 1-12-12; 8:45 am]
BILLING CODE 6717-01-P