Solia 8 Hydroelectric, LLC, FFP Missouri 13, LLC, et al.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 1923-1924 [2012-420]
Download as PDF
1923
Federal Register / Vol. 77, No. 8 / Thursday, January 12, 2012 / Notices
that is not suitable for MOX fuel
fabrication is disposal at WIPP.
As stated in the 2010 Amended NOI,
DOE and TVA are evaluating use of
MOX fuel in up to five TVA reactors at
the Sequoyah and Browns Ferry Nuclear
Plants. TVA will determine whether to
pursue irradiation of MOX fuel in TVA
reactors, and will determine which
reactors to use initially for this purpose,
should TVA and DOE decide to use
MOX fuel in TVA reactors.
Potential Environmental Issues for
Analysis
DOE has tentatively identified the
following environmental issues for
analysis in the SPD Supplemental EIS.
The list is presented to facilitate
comment on the scope of the SPD
Supplemental EIS, and is not intended
to be comprehensive or to predetermine
the potential impacts to be analyzed.
• Impacts to the general population
and workers from radiological and
nonradiological releases, and other
worker health and safety impacts.
• Impacts of emissions on air and
water quality.
• Impacts on ecological systems and
threatened and endangered species.
• Impacts of waste management
activities, including storage of DWPF
canisters and transuranic waste pending
disposal.
• Impacts of the transportation of
radioactive materials, reactor fuel
assemblies, and waste.
• Impacts that could occur as a result
of postulated accidents and intentional
destructive acts (terrorist actions and
sabotage).
• Potential disproportionately high
and adverse effects on low-income and
minority populations (environmental
justice).
• Short-term and long-term land use
impacts.
• Cumulative impacts.
NEPA Process
The first scoping period for the SPD
Supplemental EIS began on March 28,
2007, and ended on May 29, 2007, with
scoping meetings in Aiken and
Columbia, SC. DOE began a second
public scoping period with publication
of an Amended NOI on July 19, 2010,
and continuing through September 17,
2010. Public scoping meetings were
held in Tanner, AL; Chattanooga, TN;
North Augusta, SC; and Carlsbad and
Santa Fe, NM.
Following the scoping period
announced in this second Amended
NOI, and after considering all scoping
comments received, DOE will prepare a
Draft SPD Supplemental EIS. DOE will
announce the availability of the Draft
SPD Supplemental EIS in the Federal
Register and local media outlets.
Comments received on the Draft SPD
Supplemental EIS will be considered
and addressed in the Final SPD
Supplemental EIS. DOE currently plans
to issue the Final SPD Supplemental EIS
in late 2012. DOE will issue a record of
decision no sooner than 30 days after
publication by the Environmental
Protection Agency of a Notice of
Availability of the Final SPD
Supplemental EIS.
Other Agency Involvement
The Tennessee Valley Authority is a
cooperating agency with DOE for
preparation and review of the sections
of the SPD Supplemental EIS that
address operation of TVA reactors using
MOX fuel assemblies. DOE invites
Federal and non-Federal agencies with
expertise in the subject matter of the
SPD Supplemental EIS to contact the
NEPA Document Manager (see
ADDRESSES) if they wish to be a
cooperating agency in the preparation of
the SPD Supplemental EIS.
Issued at Washington, DC, on January 6,
2012.
Thomas P. D’Agostino,
Undersecretary for Nuclear Security.
[FR Doc. 2012–445 Filed 1–11–12; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 13771–001, Project No. 13763–
001 et al.]
Solia 8 Hydroelectric, LLC, FFP
Missouri 13, LLC, et al.; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
Solia 8 Hydroelectric, LLC ...................................................................................................................................
FFP Missouri 13, LLC ...........................................................................................................................................
Solia 5 Hydroelectric, LLC ...................................................................................................................................
Solia 4 Hydroelectric, LLC ...................................................................................................................................
a. Type of Filing: Notice of Intent To
File License Application and Request to
Use the Traditional Licensing Process.
b. Project Nos.: P–13771–001, P–
13763–001, P–13766–001, P–13767–
001.
c. Date Filed: November 16, 2011.
d. Submitted By: Free Flow Power
Corporation on behalf of its subsidiary
Project No.
tkelley on DSK3SPTVN1PROD with NOTICES
P–13771
P–13763
P–13766
P–13767
.....................
.....................
.....................
.....................
limited liability corporations (listed
above and collectively referred to below
as ‘‘Free Flow Power’’).
e. Name of Projects: Point Marion
Lock and Dam Project, P–13771–001;
Grays Landing Lock and Dam Project,
P–13763–001; Maxwell Lock and Dam
Project, P–13766–001; and Charleroi
Lock and Dam Project, P–13767–001.
County
Point Marion Lock and Dam Hydroelectric Project ...........
Grays Landing Lock and Dam Hydroelectric Project ........
Maxwell Lock and Dam Hydroelectric Project ...................
Charleroi Lock and Dam Hydroelectric Project .................
Fayette .................................
Greene .................................
Washington ..........................
Washington ..........................
16:26 Jan 11, 2012
Jkt 226001
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
No.
No.
No.
No.
13771–001
13763–001
13766–001
13767–001
f. Location: At existing locks and
dams owned and operated by the U.S.
Army Corps of Engineers on the
Monongahela River in Pennsylvania (see
table below for specific project
locations). The projects would occupy
United States lands administered by the
U.S. Army Corps of Engineers.
Projects
g. Filed Pursuant to: 18 CFR 5.3 of the Boston, MA 02114–2130; (978) 283–
Commission’s regulations.
2822; or email at rswaminathan@freeh. Potential Applicant Contact: Ramya flow-power.com.
Swaminathan, Chief Operating Officer,
Free Flow Power, 239 Causeway Street,
VerDate Mar<15>2010
Project
Project
Project
Project
Township
Uniontown.
Greensboro.
Brownsville.
Charleroi, Monessen.
i. FERC Contact: Monir Chowdhury at
(202) 502–6736; or email at monir.
chowdhury@ferc.gov.
j. Free Flow Power filed its request to
use the Traditional Licensing Process on
E:\FR\FM\12JAN1.SGM
12JAN1
tkelley on DSK3SPTVN1PROD with NOTICES
1924
Federal Register / Vol. 77, No. 8 / Thursday, January 12, 2012 / Notices
November 16, 2011. Free Flow Power
provided public notice of its request on
November 16, 2011. In a letter dated
January 5, 2012, the Director of the
Division of Hydropower Licensing
approved Free Flow Power’s request to
use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the Pennsylvania Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Free Flow Power as the Commission’s
non-federal representative for carrying
out informal consultation, pursuant to
section 7 of the Endangered Species Act,
section 305 of the Magnuson-Stevens
Fishery Conservation and Management
Act, and section 106 of the National
Historic Preservation Act.
m. Free Flow Power filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://www.
ferc.gov), using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCONlineSupport@ferc.
gov or toll free at 1–(866) 208–3676, or
for TTY, (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in
paragraph h.
o. Register online at https://www.ferc.
gov/docs-filing/esubscription.asp to be
notified via email of new filing and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Dated: January 5, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–420 Filed 1–11–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:26 Jan 11, 2012
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project Nos. P–13235–002 and P–13355–
001]
Middlebury Electric, LLC; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
and Approving Use of the Traditional
Licensing Process
a. Type of Filings: Notice of Intent To
File License Application and Request to
Use the Traditional Licensing Process.
b. Project Nos.: P–13235–002 and P–
13355–001.
c. Dates Filed: May 5, 2011, and June
20, 2011, respectively.
d. Submitted By: Middlebury Electric,
LLC.
e. Name of Projects: Middlebury
Upper Hydroelectric Project and
Middlebury Upper East Bank
Hydroelectric Project, respectively.
f. Location: On Otter Creek, in
Addison County, Vermont. No federal
lands would be occupied by the project
works or located within the proposed
project boundaries.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Alders
Holm, Middlebury Electric, LLC, #5
Frog Hollow Alley, Middlebury, VT
05753; (802) 388–7037.
i. FERC Contact: John Ramer at (202)
502–8969; or email at john.ramer@ferc.
gov.
j. Middlebury Electric, LLC filed its
requests to use the Traditional Licensing
Process on May 5 and June 20, 2011, for
Middlebury Upper Project, P–13235–
002 and Middlebury Upper East Bank
Project, P–13355–001, respectively.
Middlebury Electric, LLC provided
public notice of its requests on May 2,
2011, and August 18, 2011, respectively.
In a letter dated October 5, 2011, the
Director of the Division of Hydropower
Licensing approved Middlebury
Electric, LLC’s requests to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) the U.S.
Fish and Wildlife Service under section
7 of the Endangered Species Act and the
joint agency regulations thereunder at
50 CFR part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the Vermont State Historic Preservation
Officer, as required by section 106,
National Historical Preservation Act,
and the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
l. Middlebury Electric, LLC filed PreApplication Documents (PADs;
including proposed process plans and
schedules) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
m. Copies of the PADs are available
for review at the Commission in the
Public Reference Room or may be
viewed on the Commission’s Web site
(https://www.ferc.gov), using the
‘‘eLibrary’’ link. For either project, enter
the docket number, excluding the last
three digits in the docket number field
to access the document. For assistance,
contact FERC Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Copies are also
available for inspection and
reproduction at the address in
paragraph h.
n. Register online at https://www.ferc.
gov/docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to these or other
pending projects. For assistance, contact
FERC Online Support.
Dated: January 5, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–424 Filed 1–11–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13762–001; Project No. 13753–
001]
FFP Missouri 15, LLC; FFP Missouri
16, LLC; Notice of Intent To File
License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent To
File License Application and Request to
Use the Traditional Licensing Process.
b. Project Nos.: P–13762–001, P–
13753–001.
c. Date Filed: November 16, 2011.
d. Submitted By: Free Flow Power
Corporation on behalf of its subsidiary
limited liability corporations (listed
above and collectively referred to below
as ‘‘Free Flow Power’’).
e. Name of Projects: Morgantown
Lock and Dam Project, P–13762–001;
and Opekiska Lock and Dam Project, P–
13753–001.
f. Location: At existing locks and
dams owned and operated by the U.S.
Army Corps of Engineers on the
Monongahela River in West Virginia
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 77, Number 8 (Thursday, January 12, 2012)]
[Notices]
[Pages 1923-1924]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-420]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[ Project No. 13771-001, Project No. 13763-001 et al.]
Solia 8 Hydroelectric, LLC, FFP Missouri 13, LLC, et al.; Notice
of Intent To File License Application, Filing of Pre-Application
Document, and Approving Use of the Traditional Licensing Process
Solia 8 Hydroelectric, LLC... Project No. 13771-001
FFP Missouri 13, LLC......... Project No. 13763-001
Solia 5 Hydroelectric, LLC... Project No. 13766-001
Solia 4 Hydroelectric, LLC... Project No. 13767-001
a. Type of Filing: Notice of Intent To File License Application and
Request to Use the Traditional Licensing Process.
b. Project Nos.: P-13771-001, P-13763-001, P-13766-001, P-13767-
001.
c. Date Filed: November 16, 2011.
d. Submitted By: Free Flow Power Corporation on behalf of its
subsidiary limited liability corporations (listed above and
collectively referred to below as ``Free Flow Power'').
e. Name of Projects: Point Marion Lock and Dam Project, P-13771-
001; Grays Landing Lock and Dam Project, P-13763-001; Maxwell Lock and
Dam Project, P-13766-001; and Charleroi Lock and Dam Project, P-13767-
001.
f. Location: At existing locks and dams owned and operated by the
U.S. Army Corps of Engineers on the Monongahela River in Pennsylvania
(see table below for specific project locations). The projects would
occupy United States lands administered by the U.S. Army Corps of
Engineers.
----------------------------------------------------------------------------------------------------------------
Project No. Projects County Township
----------------------------------------------------------------------------------------------------------------
P-13771............................ Point Marion Lock and Dam Fayette............... Uniontown.
Hydroelectric Project.
P-13763............................ Grays Landing Lock and Dam Greene................ Greensboro.
Hydroelectric Project.
P-13766............................ Maxwell Lock and Dam Washington............ Brownsville.
Hydroelectric Project.
P-13767............................ Charleroi Lock and Dam Washington............ Charleroi, Monessen.
Hydroelectric Project.
----------------------------------------------------------------------------------------------------------------
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Ramya Swaminathan, Chief Operating
Officer, Free Flow Power, 239 Causeway Street, Boston, MA 02114-2130;
(978) 283-2822; or email at flow-power.com">rswaminathan@free-flow-power.com.
i. FERC Contact: Monir Chowdhury at (202) 502-6736; or email at
monir.chowdhury@ferc.gov.
j. Free Flow Power filed its request to use the Traditional
Licensing Process on
[[Page 1924]]
November 16, 2011. Free Flow Power provided public notice of its
request on November 16, 2011. In a letter dated January 5, 2012, the
Director of the Division of Hydropower Licensing approved Free Flow
Power's request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; (b) NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920; and (c) the Pennsylvania
Historic Preservation Officer, as required by section 106, National
Historic Preservation Act, and the implementing regulations of the
Advisory Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Free Flow Power as the
Commission's non-federal representative for carrying out informal
consultation, pursuant to section 7 of the Endangered Species Act,
section 305 of the Magnuson-Stevens Fishery Conservation and Management
Act, and section 106 of the National Historic Preservation Act.
m. Free Flow Power filed a Pre-Application Document (PAD; including
a proposed process plan and schedule) with the Commission, pursuant to
18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov or toll free at 1-(866) 208-3676, or for
TTY, (202) 502-8659. A copy is also available for inspection and
reproduction at the address in paragraph h.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: January 5, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-420 Filed 1-11-12; 8:45 am]
BILLING CODE 6717-01-P