Notice of Commission Staff Attendance, 791 [2012-8]
Download as PDF
pmangrum on DSK3VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 4 / Friday, January 6, 2012 / Notices
U.S. Forest Service within the Chugach
National Forest. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) Either (a) a 2-foot-high by 120foot-long, concrete gravity dam at Grant
Lake, or (b) a natural lake outlet, with
a 48-inch-diameter pipe extending back
into Grant lake, a gate house, regulating
gate, controls, and monitoring
equipment; (2) Grant Lake, the project
reservoir, with a total storage capacity of
15,900 acre-feet and a water surface area
of 1,790 acres at full pool elevation of
700 feet above mean seal level; (3) a
3,200-foot-long, 10-foot-diameter
horseshoe tunnel; (4) a 72-inchdiameter, 360-foot-long, welded steel
penstock; (5) a 200-foot-long open
channel tailrace; (6) a 45-foot by 60-foot
by 30-foot-high powerhouse containing
two horizontal Francis type turbine
units totaling 5 megawatts (MW) (1 x 4
MW unit and 1 x 1 MW unit) of
generating capacity; and (7) a
transmission line consisting of either a
3.5-mile-long, 24.9 kilovolt (kV)
transmission line, or a 1-mile-long, 115
kV transmission line, connecting the
powerhouse to the City of Seward’s or
to Chugach Electric’s transmission line.
The total energy output would be 19,700
megawatthours.
Applicant Contact: Mr. Mike Salzetti,
Kenai Hydro, LLC, 3977 Lake Street,
Homer, AK 99603; phone (907) 283–
2375.
FERC Contact: Kenneth Hogan;
phone: (202) 502–8434.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
VerDate Mar<15>2010
14:40 Jan 05, 2012
Jkt 226001
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13212) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: December 29, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–4 Filed 1–5–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
December 29, 2011.
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the PJM Interconnection, L.L.C. (PJM):
Combined PJM Regional Transmission
Planning Task Force/PJM
Interconnection Process Senior Task
Force
January 6, 2012, 9:30 a.m.–3 p.m.,
Local Time.
January 27, 2012, 9:30 a.m.–3 p.m.,
Local Time.
February 17, 2012, 9:30 a.m.–3 p.m.,
Local Time.
March 9, 2012, 9:30 a.m.–3 p.m.,
Local Time.
March 28, 2012, 9:30 a.m.–3 p.m.,
Local Time.
April 20, 2012, 9:30 a.m.–3 p.m.,
Local Time.
Combined PJM Markets and Reliability
Committee/Members Committee
January 26, 2012, 9 a.m.–5 p.m., Local
Time.
The above-referenced meetings will
be held at:
The Chase Center on the Riverfront,
Wilmington, DE.
The above-referenced meetings are
open to stakeholders.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
791
Further information may be found at
www.pjm.com.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER06–456, ER06–954,
ER06–1271, ER07–424, ER06–880,
EL07–57, ER07–1186, ER08–229, ER08–
1065, ER09–497, and ER10–268, PJM
Interconnection, L.L.C.
Docket No. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. EL10–52, Central
Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER11–4070, RITELine
Indiana et. al.
Docket No. ER11–2875 and EL11–20,
PJM Interconnection, L.L.C.
Docket No. ER08–386 and ER09–1256,
Potomac-Appalachian Transmission
Highline, L.L.C.
Docket No. ER09–1589, FirstEnergy
Service Company
Docket No. EL11–56, FirstEnergy
Service Company
Docket No. ER11–1844, Midwest
Independent Transmission System
Operator, Inc.
Docket No. EL12–10, PJM
Interconnection, L.L.C.
For more information, contact
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6604 or jonathan.fernandez@ferc.gov.
Dated: December 29, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–8 Filed 1–5–12; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2011–1016; FRL–9331–5]
Kasugamycin; Receipt of Application
for Emergency Exemption for Use on
Apples in Michigan, Solicitation of
Public Comment
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA has received a specific
exemption request from the Michigan
Department of Agriculture to use the
pesticide Kasugamycin (CAS No. 6980–
18–3) to treat up to 10,000 acres of
apples to control fire blight. The
applicant proposes the use of a new
chemical which has not been registered
by the EPA. EPA is soliciting public
comment before making the decision
whether or not to grant the exemption.
SUMMARY:
E:\FR\FM\06JAN1.SGM
06JAN1
Agencies
[Federal Register Volume 77, Number 4 (Friday, January 6, 2012)]
[Notices]
[Page 791]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-8]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
December 29, 2011.
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission's staff may attend the following meetings
related to the transmission planning activities of the PJM
Interconnection, L.L.C. (PJM):
Combined PJM Regional Transmission Planning Task Force/PJM
Interconnection Process Senior Task Force
January 6, 2012, 9:30 a.m.-3 p.m., Local Time.
January 27, 2012, 9:30 a.m.-3 p.m., Local Time.
February 17, 2012, 9:30 a.m.-3 p.m., Local Time.
March 9, 2012, 9:30 a.m.-3 p.m., Local Time.
March 28, 2012, 9:30 a.m.-3 p.m., Local Time.
April 20, 2012, 9:30 a.m.-3 p.m., Local Time.
Combined PJM Markets and Reliability Committee/Members Committee
January 26, 2012, 9 a.m.-5 p.m., Local Time.
The above-referenced meetings will be held at:
The Chase Center on the Riverfront, Wilmington, DE.
The above-referenced meetings are open to stakeholders.
Further information may be found at www.pjm.com.
The discussions at the meetings described above may address matters
at issue in the following proceedings:
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. ER06-456, ER06-954, ER06-1271, ER07-424, ER06-880, EL07-
57, ER07-1186, ER08-229, ER08-1065, ER09-497, and ER10-268, PJM
Interconnection, L.L.C.
Docket No. ER10-253 and EL10-14, Primary Power, L.L.C.
Docket No. EL10-52, Central Transmission, LLC v. PJM
Interconnection, L.L.C.
Docket No. ER11-4070, RITELine Indiana et. al.
Docket No. ER11-2875 and EL11-20, PJM Interconnection, L.L.C.
Docket No. ER08-386 and ER09-1256, Potomac-Appalachian Transmission
Highline, L.L.C.
Docket No. ER09-1589, FirstEnergy Service Company
Docket No. EL11-56, FirstEnergy Service Company
Docket No. ER11-1844, Midwest Independent Transmission System
Operator, Inc.
Docket No. EL12-10, PJM Interconnection, L.L.C.
For more information, contact Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy Regulatory Commission at (202) 502-
6604 or jonathan.fernandez@ferc.gov.
Dated: December 29, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-8 Filed 1-5-12; 8:45 am]
BILLING CODE 6717-01-P