n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) Bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
VerDate Mar<15>2010
14:40 Jan 05, 2012
Jkt 226001
Dated: December 29, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–5 Filed 1–5–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12757–003
BOST4 Hydroelectric Company, LLC,
(BOST4); Notice of Application
Accepted for Filing and Soliciting
Motions To Intervene and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: P–12757–003.
c. Date filed: February 24, 2011.
d. Applicant: BOST4 Hydroelectric
Company, LLC (BOST4).
e. Name of Project: Red River Lock &
Dam No. 4 Hydroelectric Project.
f. Location: The proposed project
would be located at the existing Army
Corps of Engineer’s (Corps) Red River
Lock & Dam No. 4 on the Red River, in
Red River Parish near the Town of
Coushatta, Louisiana.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Douglas A.
Spalding, BOST4 Hydroelectric
Company, LLC, 8441 Wayzata Blvd.,
Suite 101, Golden Valley, MN 55426;
(952) 544–8133.
i. FERC Contact: Jeanne Edwards
(202) 502–6181, or by email at jeanne.
edwards@ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. The proposed project would utilize
the existing U.S. Army Corps of
Engineers (Corps) Red River Lock and
Dam No. 4, and operate consistent with
the Corps current operation policy. The
proposed project would consist of: (1)
An excavated 385-foot-long headrace
channel to convey water from the
upstream Pool No. 4 of the Red River to
a 301-foot-long by 90-foot-wide concrete
powerhouse located southwest of the
end of the existing overflow weir; (2) an
excavated 477-foot-long tailrace channel
to discharge water from the powerhouse
to the downstream Pool No. 3 of the Red
River; (3) one 28.1-megawatt (MW)
horizontal Kaplan bulb turbine/
generator unit; (4) one 3.0 mile-long,
34.5-kilovolt (kV) overhead
transmission line leading from a project
substation located at the project’s
powerhouse and connecting to Central
Louisiana Electric Company’s existing
34.5-kV transmission line; and (5)
appurtenant facilities. The proposed
project would generate about 128,532
megawatt-hours (MWh) annually which
would be sold to a local utility.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
E:\FR\FM\06JAN1.SGM
06JAN1
pmangrum on DSK3VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 4 / Friday, January 6, 2012 / Notices
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) Bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
Dated: December 29, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–6 Filed 1–5–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
14:40 Jan 05, 2012
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–30–000; PF11–4–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Application
Take notice that on December 14,
2011, Transcontinental Gas Pipe Line
Company, LLC (Transco), P.O. Box
1396, Houston, Texas 77251, filed an
application under sections 7(c) and 7(b)
of the Natural Gas Act (NGA) for a
certificate authorizing Transco to
construct and operate its Northeast
Supply Link Project (Project) and to
abandon certain pipeline facilities.
Transco states that the proposed Project
is an expansion of its existing pipeline
system under which Transco will
provide 250,000 dekatherms per day
(Dth/day) of incremental firm
transportation service in Zone 6 from
certain supply interconnections on
Transco’s Leidy Line in Pennsylvania to
Transco’s 210 Market Pool in New
Jersey and the existing Manhattan,
Central Manhattan, and Narrows
delivery points in New York City, all as
more fully set forth in the application.
This filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Specifically, Transco proposes the
following: (1) Construction and
operation of approximately 12.03 miles
of new 42-inch diameter pipeline
looping facilities on Transco’s existing
mainline; (2) replacement of
approximately 0.46 miles of existing 36inch diameter pipeline, by abandoning
the pipeline in place and installing an
equivalent length of thickerwalled pipe
in a parallel trench; (3) pressure
uprating of approximately 27 miles of
existing 24-inch, 26-inch, and 36-inch
diameter pipeline; (4) a new 25,000
horsepower (hp) electric motor driven
compressor station; (5) addition of
16,000 hp at an existing compressor
station; (6) compressor unit
modifications at an existing compressor
station; (7) modifications to various
delivery and receipt meter stations in
Pennsylvania, New Jersey, and New
York; and (8) construction or
modification of appurtenant
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
787
underground and minor aboveground
facilities. The estimated cost of the
proposed Project is $341 million.
Any questions regarding the Northeast
Supply Link Project should be directed
to Bill Hammons, Team Leader, Rates
and Regulatory or Stephen A. Hatridge,
Senior Counsel, Transcontinental Gas
Pipe Line Company, LLC, P.O. Box
1396, Houston, Texas 77251 or at (713)
215–2130, or
PipelineExpansion@williams.com.
On March 2, 2011, the Commission
staff granted Transco’s request to utilize
the National Environmental Policy Act
(NEPA) Pre-Filing Process and assigned
Docket No. PF11–4–000 to staff
activities involving the project. Now, as
of the filing of this application on
December 14, 2011, the NEPA Pre-Filing
Process for this project has ended. From
this time forward, this proceeding will
be conducted in Docket No. CP12–30–
000, as noted in the caption of this
notice.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice, the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
E:\FR\FM\06JAN1.SGM
06JAN1
Agencies
[Federal Register Volume 77, Number 4 (Friday, January 6, 2012)]
[Notices]
[Pages 786-787]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-6]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12757-003
BOST4 Hydroelectric Company, LLC, (BOST4); Notice of Application
Accepted for Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: P-12757-003.
c. Date filed: February 24, 2011.
d. Applicant: BOST4 Hydroelectric Company, LLC (BOST4).
e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric
Project.
f. Location: The proposed project would be located at the existing
Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red
River, in Red River Parish near the Town of Coushatta, Louisiana.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Douglas A. Spalding, BOST4 Hydroelectric
Company, LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426;
(952) 544-8133.
i. FERC Contact: Jeanne Edwards (202) 502-6181, or by email at
jeanne.edwards@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, or toll free at 1-(866) 208-
3676, or for TTY, (202) 502-8659. Although the Commission strongly
encourages electronic filing, documents may also be paper-filed. To
paper-file, mail an original and seven copies to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426.
The Commission's Rules of Practice and Procedures require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. This application has been accepted for filing, but is not ready
for environmental analysis at this time.
l. The proposed project would utilize the existing U.S. Army Corps
of Engineers (Corps) Red River Lock and Dam No. 4, and operate
consistent with the Corps current operation policy. The proposed
project would consist of: (1) An excavated 385-foot-long headrace
channel to convey water from the upstream Pool No. 4 of the Red River
to a 301-foot-long by 90-foot-wide concrete powerhouse located
southwest of the end of the existing overflow weir; (2) an excavated
477-foot-long tailrace channel to discharge water from the powerhouse
to the downstream Pool No. 3 of the Red River; (3) one 28.1-megawatt
(MW) horizontal Kaplan bulb turbine/generator unit; (4) one 3.0 mile-
long, 34.5-kilovolt (kV) overhead transmission line leading from a
project substation located at the project's powerhouse and connecting
to Central Louisiana Electric Company's existing 34.5-kV transmission
line; and (5) appurtenant facilities. The proposed project would
generate about 128,532 megawatt-hours (MWh) annually which would be
sold to a local utility.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Any qualified applicant desiring to file a competing application
must submit to the Commission, on or before
[[Page 787]]
the specified intervention deadline date, a competing development
application, or a notice of intent to file such an application.
Submission of a timely notice of intent allows an interested person to
file the competing development application no later than 120 days after
the specified intervention deadline date. Applications for preliminary
permits will not be accepted in response to this notice.
A notice of intent must specify the exact name, business address,
and telephone number of the prospective applicant, and must include an
unequivocal statement of intent to submit a development application. A
notice of intent must be served on the applicant(s) named in this
public notice.
Anyone may submit a protest or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210, 385.211, and 385.214. In determining the appropriate action to
take, the Commission will consider all protests filed, but only those
who file a motion to intervene in accordance with the Commission's
Rules may become a party to the proceeding. Any protests or motions to
intervene must be received on or before the specified deadline date for
the particular application.
When the application is ready for environmental analysis, the
Commission will issue a public notice requesting comments,
recommendations, terms and conditions, or prescriptions.
All filings must (1) Bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. Agencies may obtain copies of the application
directly from the applicant. A copy of any protest or motion to
intervene must be served upon each representative of the applicant
specified in the particular application.
Dated: December 29, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-6 Filed 1-5-12; 8:45 am]
BILLING CODE 6717-01-P