Download as PDF Federal Register / Vol. 77, No. 4 / Friday, January 6, 2012 / Notices c. Submission of Paper Applications by Hand Delivery If you submit your new application or revisions to a previously submitted application by hand delivery, you (or a courier service) must deliver the original and two copies of your new application or revisions to a previously submitted application by hand, on or before the application deadline date, to the Department at the following address: U.S. Department of Education, Application Control Center, Attention: (CFDA Number: 84.372A), 550 12th Street SW., Room 7041, Potomac Center Plaza, Washington, DC 20202–4260. The Application Control Center accepts hand deliveries daily between 8 a.m. and 4:30 p.m., Washington, DC time, except Saturdays, Sundays, and Federal holidays. Note for Mail or Hand Delivery of Paper Applications: If you mail or hand deliver your new application or revisions to a previously submitted application to the Department— (1) You must indicate on the envelope—if not provided by the Department—in Item 11 of the SF 424 the CFDA number, including suffix letter, if any, of the competition under which you are submitting your application; and (2) The Application Control Center will mail to you a notification of receipt of your grant application. If you do not receive this notification within 15 business days from the application deadline date, you should call the U.S. Department of Education Application Control Center at (202) 245– 6288. pmangrum on DSK3VPTVN1PROD with NOTICES FOR FURTHER INFORMATION CONTACT: Emily Anthony, U.S. Department of Education, National Center for Education Statistics, 1990 K Street NW., room 9083, Washington, DC 20006– 5651. Telephone: (202) 502–7495 or via Internet: Emily.Anthony@ed.gov. If you use a telecommunications device for the deaf (TDD), call the Federal Relay Service (FRS), toll-free, at 1–(800) 877–8339. Individuals with disabilities may obtain this notice in an accessible format (e.g., braille, large print, audiotape, or computer diskette) on request to the contact person listed in this section. Electronic Access to This Document: The official version of this document is the document published in the Federal Register. Free Internet access to the official edition of the Federal Register is available via the Federal Digital System at https://www.gpo.gov/fdsys. At this site you can view this document, as well as all other documents of this Department published in the Federal Register, in text or Adobe Portable Document Format (PDF). To use PDF you must VerDate Mar<15>2010 14:40 Jan 05, 2012 Jkt 226001 have Adobe Acrobat Reader, which is available free at this site. You may also access documents of the Department published in the Federal Register by using the article search feature at https://www.federalregister. gov. Specifically, through the advanced search feature at this site, you can limit your search to documents published by the Department. Program Authority: 20 U.S.C. 9607. Dated: January 3, 2012. John Q. Easton, Director, Institute of Education Sciences. [FR Doc. 2012–76 Filed 1–5–12; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12758–003] BOST5 Hydroelectric Company, LLC, (BOST5); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: P–12758–003. c. Date filed: March 28, 2011. d. Applicant: BOST5 Hydroelectric Company, LLC (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer’s (Corps) Red River Lock & Dam No. 5 on the Red River, in Bassier Parish near the Town of Ninock, Louisiana. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Douglas A. Spalding, BOST5 Hydroelectric Company, LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426; (952) 544–8133. i. FERC Contact: Jeanne Edwards (202) 502–6181, or by email at jeanne.edwards@ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the PO 00000 Frm 00011 Fmt 4703 Sfmt 4703 785 eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. The proposed project would utilize the existing U.S. Army Corps of Engineers (Corps) Red River Lock and Dam No. 5, and operate consistent with the Corps current operation policy. The proposed project would consist of: (1) An excavated 416-foot-long headrace channel to convey water from the upstream Pool No. 5 of the Red River to a 301-foot-long by 90-foot-wide concrete powerhouse located northeast of the end of the existing overflow weir; (2) an excavated 495-foot-long tailrace channel to discharge water from the powerhouse to the downstream Pool No. 4 of the Red River; (3) one 28.1-megawatt (MW) horizontal Kaplan bulb turbine/ generator unit; (4) one 7-mile-long, 34.5kilovolt (kV) overhead transmission line leading from the project’s powerhouse and connecting to Central Louisiana Electric Company’s new substation; and (5) appurtenant facilities. The proposed project would generate about 129,400 megawatt-hours (MWh) annually which would be sold to a local utility. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. E:\FR\FM\06JAN1.SGM 06JAN1 pmangrum on DSK3VPTVN1PROD with NOTICES 786 Federal Register / Vol. 77, No. 4 / Friday, January 6, 2012 / Notices You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions. All filings must (1) Bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ or ‘‘COMPETING APPLICATION;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. VerDate Mar<15>2010 14:40 Jan 05, 2012 Jkt 226001 Dated: December 29, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2012–5 Filed 1–5–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12757–003 BOST4 Hydroelectric Company, LLC, (BOST4); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: P–12757–003. c. Date filed: February 24, 2011. d. Applicant: BOST4 Hydroelectric Company, LLC (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer’s (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Mr. Douglas A. Spalding, BOST4 Hydroelectric Company, LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426; (952) 544–8133. i. FERC Contact: Jeanne Edwards (202) 502–6181, or by email at jeanne. edwards@ferc.gov. j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedures require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing, but is not ready for environmental analysis at this time. l. The proposed project would utilize the existing U.S. Army Corps of Engineers (Corps) Red River Lock and Dam No. 4, and operate consistent with the Corps current operation policy. The proposed project would consist of: (1) An excavated 385-foot-long headrace channel to convey water from the upstream Pool No. 4 of the Red River to a 301-foot-long by 90-foot-wide concrete powerhouse located southwest of the end of the existing overflow weir; (2) an excavated 477-foot-long tailrace channel to discharge water from the powerhouse to the downstream Pool No. 3 of the Red River; (3) one 28.1-megawatt (MW) horizontal Kaplan bulb turbine/ generator unit; (4) one 3.0 mile-long, 34.5-kilovolt (kV) overhead transmission line leading from a project substation located at the project’s powerhouse and connecting to Central Louisiana Electric Company’s existing 34.5-kV transmission line; and (5) appurtenant facilities. The proposed project would generate about 128,532 megawatt-hours (MWh) annually which would be sold to a local utility. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before E:\FR\FM\06JAN1.SGM 06JAN1

Agencies

[Federal Register Volume 77, Number 4 (Friday, January 6, 2012)]
[Notices]
[Pages 785-786]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-5]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12758-003]


BOST5 Hydroelectric Company, LLC, (BOST5); Notice of Application 
Accepted for Filing and Soliciting Motions To Intervene and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License.
    b. Project No.: P-12758-003.
    c. Date filed: March 28, 2011.
    d. Applicant: BOST5 Hydroelectric Company, LLC (BOST5).
    e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric 
Project.
    f. Location: The proposed project would be located at the existing 
Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red 
River, in Bassier Parish near the Town of Ninock, Louisiana.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Douglas A. Spalding, BOST5 Hydroelectric 
Company, LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426; 
(952) 544-8133.
    i. FERC Contact: Jeanne Edwards (202) 502-6181, or by email at 
jeanne.edwards@ferc.gov.
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, or toll free at 1-(866) 208-
3676, or for TTY, (202) 502-8659. Although the Commission strongly 
encourages electronic filing, documents may also be paper-filed. To 
paper-file, mail an original and seven copies to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426.
    The Commission's Rules of Practice and Procedures require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. The proposed project would utilize the existing U.S. Army Corps 
of Engineers (Corps) Red River Lock and Dam No. 5, and operate 
consistent with the Corps current operation policy. The proposed 
project would consist of: (1) An excavated 416-foot-long headrace 
channel to convey water from the upstream Pool No. 5 of the Red River 
to a 301-foot-long by 90-foot-wide concrete powerhouse located 
northeast of the end of the existing overflow weir; (2) an excavated 
495-foot-long tailrace channel to discharge water from the powerhouse 
to the downstream Pool No. 4 of the Red River; (3) one 28.1-megawatt 
(MW) horizontal Kaplan bulb turbine/generator unit; (4) one 7-mile-
long, 34.5-kilovolt (kV) overhead transmission line leading from the 
project's powerhouse and connecting to Central Louisiana Electric 
Company's new substation; and (5) appurtenant facilities. The proposed 
project would generate about 129,400 megawatt-hours (MWh) annually 
which would be sold to a local utility.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.

[[Page 786]]

    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.
    Anyone may submit a protest or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210, 385.211, and 385.214. In determining the appropriate action to 
take, the Commission will consider all protests filed, but only those 
who file a motion to intervene in accordance with the Commission's 
Rules may become a party to the proceeding. Any protests or motions to 
intervene must be received on or before the specified deadline date for 
the particular application.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, or prescriptions.
    All filings must (1) Bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in 
the heading the name of the applicant and the project number of the 
application to which the filing responds; (3) furnish the name, 
address, and telephone number of the person protesting or intervening; 
and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application.

    Dated: December 29, 2011.
Kimberly D. Bose,
Secretary.