Green Mountain Power Corporation; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 281 [2011-33735]
Download as PDF
Federal Register / Vol. 77, No. 2 / Wednesday, January 4, 2012 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2090–008]
wreier-aviles on DSK3TPTVN1PROD with NOTICES
Green Mountain Power Corporation;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Types of Application: Amendment
of License.
b. Project No.: 2090–008.
c. Date Filed: November 16, 2011.
d. Applicants: Green Mountain Power
Corporation.
e. Name of Projects: Waterbury
Hydroelectric Project.
f. Location: Little River in Washington
County, Vermont.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Jason Lisai,
Green Mountain Power Corporation, 163
Acorn Lane, Colchester, Vermont 05446.
Tel: (802) 655–8723.
i. FERC Contact: Mr. Vedula Sarma,
(202) 502–6190, vedula.sarma@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests, is 30
days from the issuance date of this
notice. All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project numbers
(P–2090–008) on any comments,
motions, or recommendations filed.
k. Description of Request: The
licensee in 2009 replaced the project’s
turbine runner with a more efficient
runner identical in design to the original
runner. The runner replacement has not
changed the project’s generating
capacity but the hydraulic capacity of
the unit increased by 14 percent from
586 cfs to 670 cfs.
l. Locations of the Application: A
copy of the application is available for
VerDate Mar<15>2010
14:53 Jan 03, 2012
Jkt 226001
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1-(866) 208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title ‘‘Comments’’,
‘‘Protest’’, or ‘‘Motion to Intervene’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
281
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: December 28, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–33735 Filed 1–3–12; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9615–7]
Proposed Consent Decree, Clean Air
Act Citizen Suit
Environmental Protection
Agency (EPA).
ACTION: Supplemental Notice of
Proposed Consent Decree; Request for
Public Comment.
AGENCY:
On December 2, 2011, EPA
provided notice in accordance with
section 113(g) of the Clean Air Act, as
amended (‘‘CAA’’ or the ‘‘Act’’), 42
U.S.C. 7413(g), of a proposed consent
decree to address a lawsuit filed by
National Parks Conservation
Association, Montana Environmental
Information Center, Grand Canyon
Trust, San Juan Citizens Alliance, Our
Children’s Earth Foundation, Plains
Justice, Powder River Basin Resource
Council, Sierra Club, and
Environmental Defense Fund
(collectively ‘‘Plaintiffs’’) in the United
States District Court for the District of
Columbia: National Parks Conservation
Association, et al. v. Jackson, No. 1:11cv-1548 (D. DC). The proposed consent
decree establishes proposed and final
promulgation deadlines for EPA to
promulgate regional haze federal
implementation plans (FIPs) or approve
regional haze state implementation
plans (SIPs) for 34 states, as required by
section 110(c) of the CAA. In EPA’s
notice, we inadvertently failed to
identify Arizona, Michigan, and New
Mexico as states addressed by the
proposed consent decree. Notice is
hereby given that the proposed consent
decree addresses these three states. We
are extending the comment period to
provide an opportunity to comment on
SUMMARY:
E:\FR\FM\04JAN1.SGM
04JAN1
Agencies
[Federal Register Volume 77, Number 2 (Wednesday, January 4, 2012)]
[Notices]
[Page 281]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-33735]
[[Page 281]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2090-008]
Green Mountain Power Corporation; Notice of Application Accepted
for Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Types of Application: Amendment of License.
b. Project No.: 2090-008.
c. Date Filed: November 16, 2011.
d. Applicants: Green Mountain Power Corporation.
e. Name of Projects: Waterbury Hydroelectric Project.
f. Location: Little River in Washington County, Vermont.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Jason Lisai, Green Mountain Power
Corporation, 163 Acorn Lane, Colchester, Vermont 05446. Tel: (802) 655-
8723.
i. FERC Contact: Mr. Vedula Sarma, (202) 502-6190,
vedula.sarma@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests, is 30 days from the issuance date of this notice. All
documents may be filed electronically via the Internet. See, 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
at https://www.ferc.gov/docs-filing/efiling.asp. If unable to be filed
electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. Commenters can submit brief comments up to 6,000 characters,
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments.
Please include the project numbers (P-2090-008) on any comments,
motions, or recommendations filed.
k. Description of Request: The licensee in 2009 replaced the
project's turbine runner with a more efficient runner identical in
design to the original runner. The runner replacement has not changed
the project's generating capacity but the hydraulic capacity of the
unit increased by 14 percent from 586 cfs to 670 cfs.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-(866) 208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``Comments'', ``Protest'', or
``Motion to Intervene'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the license surrender.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: December 28, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-33735 Filed 1-3-12; 8:45 am]
BILLING CODE 6717-01-P