Skelly-Belvieu Pipeline Company, L.L.C.; Notice of Petition for Declaratory Order, 106-107 [2011-33644]

Download as PDF pmangrum on DSK3VPTVN1PROD with NOTICES 106 Federal Register / Vol. 77, No. 1 / Tuesday, January 3, 2012 / Notices Filed Date: 12/20/11. Accession Number: 20111220–5142. Comments Due: 5 p.m. ET 2/21/12. Docket Numbers: ER11–4336–003. Applicants: ISO New England Inc. Description: ISO New England Inc. submits tariff filing per 35.17(b): Effective Date Change for ‘‘Fully Integrated’’ DR Rules to be effective 6/ 1/2016. Filed Date: 12/22/11. Accession Number: 20111222–5135. Comments Due: 5 p.m. ET 12/29/11. Docket Numbers: ER12–10–001. Applicants: Energy International Power Marketing. Description: Energy International Power Marketing submits tariff filing per 35: EIP Compliance Filing to be effective 10/3/2011. Filed Date: 12/22/11. Accession Number: 20111222–5121. Comments Due: 5 p.m. ET 1/12/12. Docket Numbers: ER12–645–001. Applicants: California Ridge Wind Energy LLC. Description: Supplement to December 21, 2011 Market-Based Rate Application to be effective 2/20/2012. Filed Date: 12/22/11. Accession Number: 20111222–5032. Comments Due: 5 p.m. ET 1/12/12. Docket Numbers: ER12–662–000. Applicants: Southern California Edison Company. Description: SGIA WDAT SERV AG SCE–SEPV 8 LLC SEPV 8 Project to be effective 12/23/2011. Filed Date: 12/22/11. Accession Number: 20111222–5001. Comments Due: 5 p.m. ET 1/12/12. Docket Numbers: ER12–663–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc. Request for Waiver of Tariff Provision and Expedited Treatment. Filed Date: 12/22/11. Accession Number: 20111222–5069. Comments Due: 5 p.m. ET 1/12/12. Docket Numbers: ER12–664–000. Applicants: PacifiCorp. Description: UMPA ARTSOA Rev 2 to be effective 2/21/2012. Filed Date: 12/22/11. Accession Number: 20111222–5106. Comments Due: 5 p.m. ET 1/12/12. Docket Numbers: ER12–665–000. Applicants: ITC Midwest LLC. Description: Filing of Agreements with MidAmerican Energy Company to be effective 2/21/2012. Filed Date: 12/22/11. Accession Number: 20111222–5107. Comments Due: 5 p.m. ET 1/12/12. Docket Numbers: ER12–666–000. Applicants: New York Independent System Operator, Inc. VerDate Mar<15>2010 15:13 Dec 30, 2011 Jkt 226001 Description: NYISO tariff revisions regarding solar-fueled generators to be effective 2/20/2012. Filed Date: 12/22/11. Accession Number: 20111222–5115. Comments Due: 5 p.m. ET 1/12/12. Docket Numbers: ER12–667–000. Applicants: ITC Midwest LLC. Description: ITC Midwest LLC submits tariff filing per 35.13(a)(2)(iii: ITC Midwest—Northern States Power Company 205 Filing to be effective 2/ 21/2012. Filed Date: 12/22/11. Accession Number: 20111222–5153. Comments Due: 5 p.m. ET 1/12/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 22, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–33677 Filed 12–30–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12–645–000] California Ridge Wind Energy LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of California Ridge Wind Energy LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability, is January 11, 2012. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https://www.ferc. gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 22, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–33633 Filed 12–30–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12–6–000] Skelly-Belvieu Pipeline Company, L.L.C.; Notice of Petition for Declaratory Order Take notice that on December 19, 2011, pursuant to Rule 207(a)(2) of the E:\FR\FM\03JAN1.SGM 03JAN1 pmangrum on DSK3VPTVN1PROD with NOTICES Federal Register / Vol. 77, No. 1 / Tuesday, January 3, 2012 / Notices Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2), Skelly-Belvieu Pipeline Company, L.L.C (Skelly-Belvieu) filed a Petition for Declaratory Order, requesting that the Federal Energy Regulatory Commission (Commission) issue an order approving the overall tariff, rate and priority service structure for a proposed expansion of SkellyBelvieu’s existing natural gas liquid pipeline system. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on January 18, 2012. Dated: December 27, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–33644 Filed 12–30–11; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 15:13 Dec 30, 2011 Jkt 226001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14284–000] Boundary Creek Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 12, 2011, Boundary Creek Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Boundary Creek Hydroelectric Project (project) to be located on Boundary Creek near Bonners Ferry in Boundary County, Idaho. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An 8-foot-high, 150foot-wide weir-type diversion with a penstock inlet and trash rack; (2) a 6.4mile-long, 6-feet-diameter steel penstock; (3) a concrete powerhouse equipped with three 12-megawatt (MW) Pelton turbines for a total capacity of 36 MW; (4) a 2.7-mile-long, 13.8-kilovolt transmission line connecting to the existing Smith Falls Hydropower substation. The estimated annual generation of the Boundary Creek Hydroelectric Project would be 100 gigawatt-hours. Applicant Contact: Mr. Justin Barker, Boundary Creek Hydro, LLC; 975 South State Highway 89/91; Logan, UT 84321; phone: (435) 752–2580. FERC Contact: Ian Smith; phone: (202) 502–8943. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 107 www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14284–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: December 22, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–33635 Filed 12–30–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14283–000] Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Earth By Design, Inc. On October 13, 2011, and supplemented on October 30, 2011, Earth By Design, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the NUMC–A Hydroelectric Power Project (project) to be located on the North Unit Main Canal of the U.S. Bureau of Reclamation’s Deschutes (Irrigation) Project near Madras in Jefferson County, Oregon. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A 4-foot-high, 40-footlong concrete intake structure; (2) a E:\FR\FM\03JAN1.SGM 03JAN1

Agencies

[Federal Register Volume 77, Number 1 (Tuesday, January 3, 2012)]
[Notices]
[Pages 106-107]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-33644]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. OR12-6-000]


Skelly-Belvieu Pipeline Company, L.L.C.; Notice of Petition for 
Declaratory Order

    Take notice that on December 19, 2011, pursuant to Rule 207(a)(2) 
of the

[[Page 107]]

Federal Energy Regulatory Commission's (Commission) Rules of Practice 
and Procedure, 18 CFR 385.207(a)(2), Skelly-Belvieu Pipeline Company, 
L.L.C (Skelly-Belvieu) filed a Petition for Declaratory Order, 
requesting that the Federal Energy Regulatory Commission (Commission) 
issue an order approving the overall tariff, rate and priority service 
structure for a proposed expansion of Skelly-Belvieu's existing natural 
gas liquid pipeline system.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on January 18, 2012.

    Dated: December 27, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-33644 Filed 12-30-11; 8:45 am]