Skelly-Belvieu Pipeline Company, L.L.C.; Notice of Petition for Declaratory Order, 106-107 [2011-33644]
Download as PDF
pmangrum on DSK3VPTVN1PROD with NOTICES
106
Federal Register / Vol. 77, No. 1 / Tuesday, January 3, 2012 / Notices
Filed Date: 12/20/11.
Accession Number: 20111220–5142.
Comments Due: 5 p.m. ET 2/21/12.
Docket Numbers: ER11–4336–003.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
submits tariff filing per 35.17(b):
Effective Date Change for ‘‘Fully
Integrated’’ DR Rules to be effective 6/
1/2016.
Filed Date: 12/22/11.
Accession Number: 20111222–5135.
Comments Due: 5 p.m. ET 12/29/11.
Docket Numbers: ER12–10–001.
Applicants: Energy International
Power Marketing.
Description: Energy International
Power Marketing submits tariff filing
per 35: EIP Compliance Filing to be
effective 10/3/2011.
Filed Date: 12/22/11.
Accession Number: 20111222–5121.
Comments Due: 5 p.m. ET 1/12/12.
Docket Numbers: ER12–645–001.
Applicants: California Ridge Wind
Energy LLC.
Description: Supplement to December
21, 2011 Market-Based Rate Application
to be effective 2/20/2012.
Filed Date: 12/22/11.
Accession Number: 20111222–5032.
Comments Due: 5 p.m. ET 1/12/12.
Docket Numbers: ER12–662–000.
Applicants: Southern California
Edison Company.
Description: SGIA WDAT SERV AG
SCE–SEPV 8 LLC SEPV 8 Project to be
effective 12/23/2011.
Filed Date: 12/22/11.
Accession Number: 20111222–5001.
Comments Due: 5 p.m. ET 1/12/12.
Docket Numbers: ER12–663–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. Request for Waiver of Tariff
Provision and Expedited Treatment.
Filed Date: 12/22/11.
Accession Number: 20111222–5069.
Comments Due: 5 p.m. ET 1/12/12.
Docket Numbers: ER12–664–000.
Applicants: PacifiCorp.
Description: UMPA ARTSOA Rev 2 to
be effective 2/21/2012.
Filed Date: 12/22/11.
Accession Number: 20111222–5106.
Comments Due: 5 p.m. ET 1/12/12.
Docket Numbers: ER12–665–000.
Applicants: ITC Midwest LLC.
Description: Filing of Agreements
with MidAmerican Energy Company to
be effective 2/21/2012.
Filed Date: 12/22/11.
Accession Number: 20111222–5107.
Comments Due: 5 p.m. ET 1/12/12.
Docket Numbers: ER12–666–000.
Applicants: New York Independent
System Operator, Inc.
VerDate Mar<15>2010
15:13 Dec 30, 2011
Jkt 226001
Description: NYISO tariff revisions
regarding solar-fueled generators to be
effective 2/20/2012.
Filed Date: 12/22/11.
Accession Number: 20111222–5115.
Comments Due: 5 p.m. ET 1/12/12.
Docket Numbers: ER12–667–000.
Applicants: ITC Midwest LLC.
Description: ITC Midwest LLC
submits tariff filing per 35.13(a)(2)(iii:
ITC Midwest—Northern States Power
Company 205 Filing to be effective 2/
21/2012.
Filed Date: 12/22/11.
Accession Number: 20111222–5153.
Comments Due: 5 p.m. ET 1/12/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 22, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–33677 Filed 12–30–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER12–645–000]
California Ridge Wind Energy LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
California Ridge Wind Energy LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability, is January 11,
2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://www.ferc.
gov. To facilitate electronic service,
persons with Internet access who will
eFile a document and/or be listed as a
contact for an intervenor must create
and validate an eRegistration account
using the eRegistration link. Select the
eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: December 22, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–33633 Filed 12–30–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR12–6–000]
Skelly-Belvieu Pipeline Company,
L.L.C.; Notice of Petition for
Declaratory Order
Take notice that on December 19,
2011, pursuant to Rule 207(a)(2) of the
E:\FR\FM\03JAN1.SGM
03JAN1
pmangrum on DSK3VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 1 / Tuesday, January 3, 2012 / Notices
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR
385.207(a)(2), Skelly-Belvieu Pipeline
Company, L.L.C (Skelly-Belvieu) filed a
Petition for Declaratory Order,
requesting that the Federal Energy
Regulatory Commission (Commission)
issue an order approving the overall
tariff, rate and priority service structure
for a proposed expansion of SkellyBelvieu’s existing natural gas liquid
pipeline system.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on January 18, 2012.
Dated: December 27, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–33644 Filed 12–30–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:13 Dec 30, 2011
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14284–000]
Boundary Creek Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On September 12, 2011, Boundary
Creek Hydro, LLC filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Boundary Creek Hydroelectric
Project (project) to be located on
Boundary Creek near Bonners Ferry in
Boundary County, Idaho. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) An 8-foot-high, 150foot-wide weir-type diversion with a
penstock inlet and trash rack; (2) a 6.4mile-long, 6-feet-diameter steel
penstock; (3) a concrete powerhouse
equipped with three 12-megawatt (MW)
Pelton turbines for a total capacity of 36
MW; (4) a 2.7-mile-long, 13.8-kilovolt
transmission line connecting to the
existing Smith Falls Hydropower
substation. The estimated annual
generation of the Boundary Creek
Hydroelectric Project would be 100
gigawatt-hours.
Applicant Contact: Mr. Justin Barker,
Boundary Creek Hydro, LLC; 975 South
State Highway 89/91; Logan, UT 84321;
phone: (435) 752–2580.
FERC Contact: Ian Smith; phone:
(202) 502–8943.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
107
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14284–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: December 22, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–33635 Filed 12–30–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14283–000]
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; Earth By Design, Inc.
On October 13, 2011, and
supplemented on October 30, 2011,
Earth By Design, Inc. filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the NUMC–A
Hydroelectric Power Project (project) to
be located on the North Unit Main Canal
of the U.S. Bureau of Reclamation’s
Deschutes (Irrigation) Project near
Madras in Jefferson County, Oregon.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) A 4-foot-high, 40-footlong concrete intake structure; (2) a
E:\FR\FM\03JAN1.SGM
03JAN1
Agencies
[Federal Register Volume 77, Number 1 (Tuesday, January 3, 2012)]
[Notices]
[Pages 106-107]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-33644]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR12-6-000]
Skelly-Belvieu Pipeline Company, L.L.C.; Notice of Petition for
Declaratory Order
Take notice that on December 19, 2011, pursuant to Rule 207(a)(2)
of the
[[Page 107]]
Federal Energy Regulatory Commission's (Commission) Rules of Practice
and Procedure, 18 CFR 385.207(a)(2), Skelly-Belvieu Pipeline Company,
L.L.C (Skelly-Belvieu) filed a Petition for Declaratory Order,
requesting that the Federal Energy Regulatory Commission (Commission)
issue an order approving the overall tariff, rate and priority service
structure for a proposed expansion of Skelly-Belvieu's existing natural
gas liquid pipeline system.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on January 18, 2012.
Dated: December 27, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-33644 Filed 12-30-11; 8:45 am]
BILLING CODE 6717-01-P