Blue Heron Hydro LLC; Notice of Availability of Environmental Assessment, 80924 [2011-33075]
Download as PDF
80924
Federal Register / Vol. 76, No. 248 / Tuesday, December 27, 2011 / Notices
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on January 9, 2012.
Dated: December 19, 2011.
Kimberly D. Bose,
Secretary.
Dated: December 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–32989 Filed 12–23–11; 8:45 am]
[FR Doc. 2011–33074 Filed 12–23–11; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. EL01–88–010]
[Project Nos. 13226–003; 13368–002]
Louisiana Public Service Commission
v. Entergy Services, Inc.; Notice of
Compliance Filing
sroberts on DSK5SPTVN1PROD with NOTICES
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Tuesday, January 3, 2012.
Blue Heron Hydro LLC; Notice of
Availability of Environmental
Assessment
Take notice that on December 19,
2011, Entergy Services, Inc., as agent on
behalf of the Entergy Operating
Companies submitted a compliance
filing, in accordance with the
Commission’s Order on Remand, 137
FERC ¶ 61,047 (2011).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission) regulations,
18 CFR part 380 (Order No. 486, 52 FR
47897), the Office of Energy Projects has
reviewed the applications for original
licenses for the Ball Mountain Dam
Hydroelectric Project (FERC Project No.
13226–003) and the Townshend Dam
Hydroelectric Project (FERC Project No.
13368–002). The Ball Mountain Dam
Hydroelectric Project is proposed to be
located on the West River near the town
of Jamaica in Windham County,
Vermont, at the U.S. Army Corps of
Engineers’ (Corps) Ball Mountain Dam.
The Townshend Dam Hydroelectric
Project is proposed to be located West
River in the town of Townshend in
Windham County, Vermont, at the
Corps’ Townshend Dam.
Staff prepared a multi-project
environmental assessment (EA), which
analyzes the potential environmental
effects of licensing the projects, and
concludes that licensing the projects,
with appropriate environmental
protection measures, would not
constitute a major federal action that
VerDate Mar<15>2010
22:00 Dec 23, 2011
Jkt 226001
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
would significantly affect the quality of
the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket, excluding the last
three digits for each docket number, in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; toll-free
at 1–(866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
www.ferc.gov/docs-filing/ferconline.asp
to be notified via email of new filings
and issuances related to these or other
pending projects. For assistance, contact
FERC Online Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/doc-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please affix Ball Mountain Dam
Hydroelectric Project, P–13226–003
and/or Townshend Dam Hydroelectric
Project, P–13368–002 to all comments.
For further information, contact Dr.
Nicholas Palso at (202) 502–8854 or by
email at nicholas.palso@ferc.gov.
Dated: December 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–33075 Filed 12–23–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2790–055]
Boott Hydropower, Inc.; Notice of
Availability of Final Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 76, Number 248 (Tuesday, December 27, 2011)]
[Notices]
[Page 80924]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-33075]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 13226-003; 13368-002]
Blue Heron Hydro LLC; Notice of Availability of Environmental
Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission (Commission) regulations,
18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy
Projects has reviewed the applications for original licenses for the
Ball Mountain Dam Hydroelectric Project (FERC Project No. 13226-003)
and the Townshend Dam Hydroelectric Project (FERC Project No. 13368-
002). The Ball Mountain Dam Hydroelectric Project is proposed to be
located on the West River near the town of Jamaica in Windham County,
Vermont, at the U.S. Army Corps of Engineers' (Corps) Ball Mountain
Dam. The Townshend Dam Hydroelectric Project is proposed to be located
West River in the town of Townshend in Windham County, Vermont, at the
Corps' Townshend Dam.
Staff prepared a multi-project environmental assessment (EA), which
analyzes the potential environmental effects of licensing the projects,
and concludes that licensing the projects, with appropriate
environmental protection measures, would not constitute a major federal
action that would significantly affect the quality of the human
environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
www.ferc.gov using the ``eLibrary'' link. Enter the docket, excluding
the last three digits for each docket number, in the docket number
field to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov; toll-free at 1-(866) 208-3676,
or for TTY, (202) 502-8659.
You may also register online at www.ferc.gov/docs-filing/ferconline.asp to be notified via email of new filings and issuances
related to these or other pending projects. For assistance, contact
FERC Online Support.
Any comments should be filed within 30 days from the date of this
notice. Comments may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/doc-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426. Please affix
Ball Mountain Dam Hydroelectric Project, P-13226-003 and/or Townshend
Dam Hydroelectric Project, P-13368-002 to all comments.
For further information, contact Dr. Nicholas Palso at (202) 502-
8854 or by email at nicholas.palso@ferc.gov.
Dated: December 20, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-33075 Filed 12-23-11; 8:45 am]
BILLING CODE 6717-01-P