Download as PDF 78628 Federal Register / Vol. 76, No. 243 / Monday, December 19, 2011 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13124–003] emcdonald on DSK5VPTVN1PROD with NOTICES Copper Valley Electric Association, Inc.; Notice of Application and Applicant-Prepared EA Accepted for Filing, Soliciting Motions To Intervene and Protests, and Soliciting Comments, and Final Terms and Conditions, Recommendations, and Prescriptions Take notice that the following hydroelectric application and applicantprepared environmental assessment has been filed with the Commission and is available for public inspection. a. Type of Application: Major License. b. Project No.: P–13124–003. c. Date filed: August 30, 2011. d. Applicant: Copper Valley Electric Association, Inc. e. Name of Project: Allison Creek Hydroelectric Project. f. Location: On Allison Creek, near the Town of Valdez, Alaska. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Robert A. Wilkinson, CEO, Copper Valley Electric Association, Inc., P.O. Box 45, Mile 187 Glenn Highway Glennallen, AK 99588, (907) 822–3211. i. FERC Contact: Kim A. Nguyen, kim.nguyen@ferc.gov, (202) 502–6105. j. Deadline for filing motions to intervene and protests, comments, and final terms and conditions, recommendations, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy VerDate Mar<15>2010 19:31 Dec 16, 2011 Jkt 226001 Regulatory Commission, 888 First Street NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted for filing and is now ready for environmental analysis. l. The Allison Creek Project consists of: (1) A 16-foot-high, 95-foot-wide concrete gravity diversion structure spanning Allison Creek with a 50-footwide spillway section; (2) a screen intake; (3) a 42-inch-diameter, 500-footlong buried and 7,200-foot-long surface steel penstock; (4) a 65 foot x 65 foot powerhouse with one 6.5-megawatt turbine/generating unit; (5) a permanent 550-foot-long access road to the powerhouse; (6) a 3.8-mile-long, 34.5kilovolt transmission line connecting to the Copper Valley switching station near the Petro Star facility along Dayville Road; and (7) appurtenant facilities. The average annual generation is estimated to be 23.3 gigawatt-hours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION,’’ ‘‘COMPETING APPLICATION,’’ ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. E:\FR\FM\19DEN1.SGM 19DEN1 Federal Register / Vol. 76, No. 243 / Monday, December 19, 2011 / Notices Dated: December 9, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–32375 Filed 12–16–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission emcdonald on DSK5VPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1920–001; ER10–1928–001; ER10–2720–001; ER10–1971–004. Applicants: FPL Energy Oklahoma Wind, LLC, FPL Energy Sooner Wind, LLC, Minco Wind, LLC, NextEra Energy Power Marketing, LLC. Description: NextEra Resources Entities Notification of Non-material Change in Status. Filed Date: 12/8/11. Accession Number: 20111208–5127. Comments Due: 5 p.m. ET 12/29/11. Docket Numbers: ER12–579–000. Applicants: Nevada Power Company. Description: Rate Schedule No. 48 Cancellation to be effective 2/7/2012. Filed Date: 12/8/11. Accession Number: 20111208–5106. Comments Due: 5 p.m. ET 12/29/11. Docket Numbers: ER12–580–000. Applicants: Tampa Electric Company. Description: Tampa Electric Company submits tariff filing per 35.13(a)(2)(iii: Amendment of Cost-Based Power Sales Tariff to be effective 12/10/2011. Filed Date: 12/9/11. Accession Number: 20111209–5065. Comments Due: 5 p.m. ET 12/30/11. Docket Numbers: ER12–581–000. Applicants: Carolina Power & Light Company. Description: Notice of Cancellation of Rate Schedule No. 179 of Carolina Power & Light Company. Filed Date: 12/9/11. Accession Number: 20111209–5107. Comments Due: 5 p.m. ET 12/30/11. Docket Numbers: ER12–582–000. Applicants: Idaho Power Company. Description: Idaho Power Company submits tariff filing per 35.13(a)(2)(iii: Idaho Power Reserve Energy Service Tariff to be effective 12/16/2011. Filed Date: 12/9/11. Accession Number: 20111209–5116. Comments Due: 5 p.m. ET 12/30/11. Docket Numbers: ER12–583–000. Applicants: PacifiCorp. Description: Cancellation of First Revised Service Agreement Nos. 358, VerDate Mar<15>2010 19:31 Dec 16, 2011 Jkt 226001 359, and 360 for Long-Term Firm Pointto-Point Transmission Service between PPM Energy, Inc and PacifiCorp. Filed Date: 12/9/11. Accession Number: 20111209–5158. Comments Due: 5 p.m. ET 12/30/11. Docket Numbers: ER12–584–000. Applicants: Dayton Power and Light Company, Indianapolis Power & Light Company. Description: Notices of Termination of Service Agreements by The Dayton Power and Light Company, et al. Filed Date: 12/9/11. Accession Number: 20111209–5173. Comments Due: 5 p.m. ET 12/30/11. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES12–8–000. Applicants: Minco Wind Interconnection Services, LLC. Description: Application of Minco Wind Interconnection Services, LLC for Blanket Authorization under FPA Section 204 and 18 CFR part 34. Filed Date: 12/9/11. Accession Number: 20111209–5147. Comments Due: 5 p.m. ET 12/30/11. Docket Numbers: ES12–9–000. Applicants: National Grid USA. Description: Supplemental Application of National Grid USA on Behalf of Certain of its Subsidiaries and Affiliates for Certain Authorizations under Section 204 of the Federal Power Act and Request for Shortened Comment Period. Filed Date: 12/9/11. Accession Number: 20111209–5186. Comments Due: 5 p.m. ET 12/30/11. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 9, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–32404 Filed 12–16–11; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 78629 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP12–225–000. Applicants: Iroquois Gas Transmission System, L.P. Description: 12/08/11 Negotiated Rates—Citigroup Energy Inc. to be effective 12/8/2011. Filed Date: 12/8/11. Accession Number: 20111208–5102. Comments Due: 5 p.m. ET 12/20/11. Docket Numbers: RP12–226–000. Applicants: Iroquois Gas Transmission System, L.P. Description: 12/08/11 Negotiated Rates—Freepoint Commodities, LLC to be effective 12/8/2011. Filed Date: 12/8/11. Accession Number: 20111208–5103. Comments Due: 5 p.m. ET 12/20/11. Docket Numbers: RP12–227–000. Applicants: Iroquois Gas Transmission System, L.P. Description: 12/08/11 Negotiated Rates—Societe Generale Energy Corp.— RTS to be effective 12/8/2011. Filed Date: 12/8/11. Accession Number: 20111208–5104. Comments Due: 5 p.m. ET 12/20/11. Docket Numbers: RP12–228–000. Applicants: Iroquois Gas Transmission System, L.P. Description: 12/08/11 Negotiated Rates—United Energy Trading, LLC— RTS to be effective 12/8/2011. Filed Date: 12/8/11. Accession Number: 20111208–5105. Comments Due: 5 p.m. ET 12/20/11. Docket Numbers: RP12–229–000. Applicants: Petal Gas Storage, LLC. Description: Baseline Filing of Second Revised Volume 1 to be effective 12/1/ 2011. Filed Date: 12/9/11. Accession Number: 20111209–5048. Comments Due: 5 p.m. ET 12/21/11. Docket Numbers: RP12–230–000. Applicants: Petal Gas Storage, LLC. Description: Cancel First Revised Volume No. 1 Tariff to be effective 12/ 9/2011. Filed Date: 12/9/11. Accession Number: 20111209–5112. Comments Due: 5 p.m. ET 12/21/11. Docket Numbers: RP12–231–000. Applicants: Viking Gas Transmission Company. Description: Part 5.0 Correction to be effective 12/1/2011. E:\FR\FM\19DEN1.SGM 19DEN1

Agencies

[Federal Register Volume 76, Number 243 (Monday, December 19, 2011)]
[Notices]
[Pages 78628-78629]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-32375]



[[Page 78628]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13124-003]


Copper Valley Electric Association, Inc.; Notice of Application 
and Applicant-Prepared EA Accepted for Filing, Soliciting Motions To 
Intervene and Protests, and Soliciting Comments, and Final Terms and 
Conditions, Recommendations, and Prescriptions

    Take notice that the following hydroelectric application and 
applicant-prepared environmental assessment has been filed with the 
Commission and is available for public inspection.
    a. Type of Application: Major License.
    b. Project No.: P-13124-003.
    c. Date filed: August 30, 2011.
    d. Applicant: Copper Valley Electric Association, Inc.
    e. Name of Project: Allison Creek Hydroelectric Project.
    f. Location: On Allison Creek, near the Town of Valdez, Alaska.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Robert A. Wilkinson, CEO, Copper Valley 
Electric Association, Inc., P.O. Box 45, Mile 187 Glenn Highway 
Glennallen, AK 99588, (907) 822-3211.
    i. FERC Contact: Kim A. Nguyen, kim.nguyen@ferc.gov, (202) 502-
6105.
    j. Deadline for filing motions to intervene and protests, comments, 
and final terms and conditions, recommendations, and prescriptions: 60 
days from the issuance date of this notice; reply comments are due 105 
days from the issuance date of this notice.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-(866) 208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The Allison Creek Project consists of: (1) A 16-foot-high, 95-
foot-wide concrete gravity diversion structure spanning Allison Creek 
with a 50-foot-wide spillway section; (2) a screen intake; (3) a 42-
inch-diameter, 500-foot-long buried and 7,200-foot-long surface steel 
penstock; (4) a 65 foot x 65 foot powerhouse with one 6.5-megawatt 
turbine/generating unit; (5) a permanent 550-foot-long access road to 
the powerhouse; (6) a 3.8-mile-long, 34.5-kilovolt transmission line 
connecting to the Copper Valley switching station near the Petro Star 
facility along Dayville Road; and (7) appurtenant facilities. The 
average annual generation is estimated to be 23.3 gigawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.
    Anyone may submit comments, a protest, or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, .211, .214. In determining the appropriate action to take, 
the Commission will consider all protests or other comments filed, but 
only those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' ``COMPETING APPLICATION,'' ``COMMENTS,'' 
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or 
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. A copy of any protest or motion to intervene must 
be served upon each representative of the applicant specified in the 
particular application. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    o. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.


[[Page 78629]]


    Dated: December 9, 2011.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2011-32375 Filed 12-16-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.