Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 77994 Federal Register / Vol. 76, No. 241 / Thursday, December 15, 2011 / Notices Docket Numbers: ER12–554–000. Applicants: Alabama Power Company. Description: Greenway Renewable Power LGIA Filing to be effective 11/28/ 2011. Filed Date: 12/6/11. Accession Number: 20111206–5079. Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: ER12–555–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: G427 LGIA Termination to be effective 2/5/2012. Filed Date: 12/6/11. Accession Number: 20111206–5091. Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: ER12–556–000. Applicants: California Independent System Operator Corporation. Description: 2011–12–06 LGIA between CAISO, SDGE and C SOLAR to be effective 10/22/2011. Filed Date: 12/6/11. Accession Number: 20111206–5095. Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: ER12–557–000. Applicants: Southwest Power Pool, Inc. Description: 1636R6 Kansas Electric Power Cooperative, Inc. NITSA NOA to be effective 10/1/2011. Filed Date: 12/6/11. Accession Number: 20111206–5110. Comments Due: 5 p.m. ET 12/27/11. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES12–7–000. Applicants: Westar Energy, Inc. Description: Application of Westar Energy, Inc. for an Order authorizing the issuance and pledge of securities under Section 204 of the Federal Power Act. Filed Date: 12/6/11. Accession Number: 20111206–5151. Comments Due: 5 p.m. ET 12/27/11. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs=filing/efiling/filing=req.pdf. For VerDate Mar<15>2010 19:28 Dec 14, 2011 Jkt 226001 other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 7, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. Dated: December 6, 2011. Nathaniel J. Davis, Sr. Deputy Secretary. [FR Doc. 2011–32147 Filed 12–14–11; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2011–32151 Filed 12–14–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. CP12–25–000; RP12–220–000 (cancelled)] Combined Notice of Filings Brian Hamilton v. El Paso Natural Gas, El Paso Western Pipelines; Notice Announcing Docket Number Change Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP12–221–000. Applicants: Alliance Pipeline L.P. Description: Contract Ext 2011 to be effective 1/1/2012. Filed Date: 12/2/11. Accession Number: 20111202–5086. Comments Due: 5 p.m. ET 12/14/11. Docket Numbers: RP12–222–000. Applicants: Ruby Pipeline, L.L.C. Description: Non-Conforming Negotiated Rate Agreement to be effective 1/3/2012. Filed Date: 12/2/11. Accession Number: 20111202–5135. Comments Due: 5 p.m. ET 12/14/11. Docket Numbers: RP12–223–000. Applicants: Guardian Pipeline, L.L.C. Description: Non-conforming Agreement—Sequent PAL to be effective 5/1/2011. Filed Date: 12/6/11. Accession Number: 20111206–5000. Comments Due: 5 p.m. ET 12/19/11. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, and service can be found at: https:// www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 On December 2, 2011, the Commission issued a notice in docket number RP12–220–000. Notice of Complaint, December 2, 2011. Commission’s staff has decided to cancel the original docket number, RP12–220–000 and give the proceeding a new docket number. This notice changes the docket number of the proceeding to CP12–25–000 as referenced above. The docket number change does not affect the original comment due date of this proceeding, which is December 21, 2011. Dated: December 8, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–32149 Filed 12–14–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2784–004–CA] Pacific Gas and Electric Company; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for a new license for the Rollins Transmission Line Project located within the Bear River basin, on private land in Placer and Nevada counties, California. The transmission line extends 0.72 mile from Nevada Irrigation District’s (NID) existing Rollins powerhouse switchyard (part of the Yuba-Bear Hydroelectric Project, FERC Project No. 2266) to the junction with PG&E’s Drum-Grass Valley-Weimer transmission line (non-FERC E:\FR\FM\15DEN1.SGM 15DEN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 76, No. 241 / Thursday, December 15, 2011 / Notices jurisdictional). Commission staff has prepared an Environmental Assessment (EA) that analyzes the potential environmental effects of the transmission line and concludes that issuing a new license for the Rollins Transmission Line Project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. The EA contains staff’s analysis of the potential environmental effects of the project and alternatives and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–(866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending project. For assistance, contact FERC Online Support. Any comments on the EA should be filed within 30 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ eComment.asp. You must include your name and contact information at the end of your comments. Please contact Mary Greene by telephone at (202) 502–8865 or by email at mary.greene@ferc.gov if you have any questions. Dated: December 8, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–32126 Filed 12–14–11; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 16:49 Dec 14, 2011 Jkt 226001 77995 DEPARTMENT OF ENERGY Comment Date: 5 p.m. Eastern Time on Monday December 19, 2011. Federal Energy Regulatory Commission Dated: December 8, 2011. Kimberly D. Bose, Secretary. [Docket No. PR10–63–001] Southcross Alabama Pipeline LLC; Notice of Filing Take notice that on December 7, 2011, Southcross Alabama Pipeline LLC (SAP) submitted a revised Statement of Operating Conditions for services provided under Section 311 of the Natural Gas Policy Act of 1978 (‘‘NGPA’’). SAP states the filing is to change the effective date of the tariff to August 31, 2011, due to the transfer of control and name change from Enterprise Alabama Intrastate, LLC on that date. Any person desiring to participate in this rate proceeding must file a motion to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 [FR Doc. 2011–32124 Filed 12–14–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12–569–000] Blackwell Wind, LLC; Supplemental Notice that Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Blackwell Wind, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is December 28, 2011. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by E:\FR\FM\15DEN1.SGM 15DEN1

Agencies

[Federal Register Volume 76, Number 241 (Thursday, December 15, 2011)]
[Notices]
[Pages 77994-77995]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-32126]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2784-004-CA]


Pacific Gas and Electric Company; Notice of Availability of 
Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office 
of Energy Projects has reviewed the application for a new license for 
the Rollins Transmission Line Project located within the Bear River 
basin, on private land in Placer and Nevada counties, California. The 
transmission line extends 0.72 mile from Nevada Irrigation District's 
(NID) existing Rollins powerhouse switchyard (part of the Yuba-Bear 
Hydroelectric Project, FERC Project No. 2266) to the junction with 
PG&E's Drum-Grass Valley-Weimer transmission line (non-FERC

[[Page 77995]]

jurisdictional). Commission staff has prepared an Environmental 
Assessment (EA) that analyzes the potential environmental effects of 
the transmission line and concludes that issuing a new license for the 
Rollins Transmission Line Project, with appropriate environmental 
measures, would not constitute a major federal action significantly 
affecting the quality of the human environment.
    The EA contains staff's analysis of the potential environmental 
effects of the project and alternatives and concludes that licensing 
the project, with appropriate environmental protective measures, would 
not constitute a major federal action that would significantly affect 
the quality of the human environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-(866) 208-3676, or for 
TTY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending project. For assistance, contact FERC 
Online Support.
    Any comments on the EA should be filed within 30 days from the date 
of this notice. Comments may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/eComment.asp. You must include your name and contact information 
at the end of your comments.
    Please contact Mary Greene by telephone at (202) 502-8865 or by 
email at mary.greene@ferc.gov if you have any questions.

    Dated: December 8, 2011.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2011-32126 Filed 12-14-11; 8:45 am]
BILLING CODE 6717-01-P