Pacific Gas and Electric Company; Notice of Availability of Environmental Assessment, 77994-77995 [2011-32126]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
77994
Federal Register / Vol. 76, No. 241 / Thursday, December 15, 2011 / Notices
Docket Numbers: ER12–554–000.
Applicants: Alabama Power
Company.
Description: Greenway Renewable
Power LGIA Filing to be effective 11/28/
2011.
Filed Date: 12/6/11.
Accession Number: 20111206–5079.
Comments Due: 5 p.m. ET 12/27/11.
Docket Numbers: ER12–555–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: G427 LGIA Termination
to be effective 2/5/2012.
Filed Date: 12/6/11.
Accession Number: 20111206–5091.
Comments Due: 5 p.m. ET 12/27/11.
Docket Numbers: ER12–556–000.
Applicants: California Independent
System Operator Corporation.
Description: 2011–12–06 LGIA
between CAISO, SDGE and C SOLAR to
be effective 10/22/2011.
Filed Date: 12/6/11.
Accession Number: 20111206–5095.
Comments Due: 5 p.m. ET 12/27/11.
Docket Numbers: ER12–557–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1636R6 Kansas Electric
Power Cooperative, Inc. NITSA NOA to
be effective 10/1/2011.
Filed Date: 12/6/11.
Accession Number: 20111206–5110.
Comments Due: 5 p.m. ET 12/27/11.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES12–7–000.
Applicants: Westar Energy, Inc.
Description: Application of Westar
Energy, Inc. for an Order authorizing the
issuance and pledge of securities under
Section 204 of the Federal Power Act.
Filed Date: 12/6/11.
Accession Number: 20111206–5151.
Comments Due: 5 p.m. ET 12/27/11.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs=filing/efiling/filing=req.pdf. For
VerDate Mar<15>2010
19:28 Dec 14, 2011
Jkt 226001
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 7, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Dated: December 6, 2011.
Nathaniel J. Davis, Sr.
Deputy Secretary.
[FR Doc. 2011–32147 Filed 12–14–11; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2011–32151 Filed 12–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. CP12–25–000; RP12–220–000
(cancelled)]
Combined Notice of Filings
Brian Hamilton v. El Paso Natural Gas,
El Paso Western Pipelines; Notice
Announcing Docket Number Change
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP12–221–000.
Applicants: Alliance Pipeline L.P.
Description: Contract Ext 2011 to be
effective 1/1/2012.
Filed Date: 12/2/11.
Accession Number: 20111202–5086.
Comments Due: 5 p.m. ET 12/14/11.
Docket Numbers: RP12–222–000.
Applicants: Ruby Pipeline, L.L.C.
Description: Non-Conforming
Negotiated Rate Agreement to be
effective 1/3/2012.
Filed Date: 12/2/11.
Accession Number: 20111202–5135.
Comments Due: 5 p.m. ET 12/14/11.
Docket Numbers: RP12–223–000.
Applicants: Guardian Pipeline, L.L.C.
Description: Non-conforming
Agreement—Sequent PAL to be effective
5/1/2011.
Filed Date: 12/6/11.
Accession Number: 20111206–5000.
Comments Due: 5 p.m. ET 12/19/11.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
On December 2, 2011, the
Commission issued a notice in docket
number RP12–220–000. Notice of
Complaint, December 2, 2011.
Commission’s staff has decided to
cancel the original docket number,
RP12–220–000 and give the proceeding
a new docket number. This notice
changes the docket number of the
proceeding to CP12–25–000 as
referenced above.
The docket number change does not
affect the original comment due date of
this proceeding, which is December 21,
2011.
Dated: December 8, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–32149 Filed 12–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2784–004–CA]
Pacific Gas and Electric Company;
Notice of Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the application
for a new license for the Rollins
Transmission Line Project located
within the Bear River basin, on private
land in Placer and Nevada counties,
California. The transmission line
extends 0.72 mile from Nevada
Irrigation District’s (NID) existing
Rollins powerhouse switchyard (part of
the Yuba-Bear Hydroelectric Project,
FERC Project No. 2266) to the junction
with PG&E’s Drum-Grass Valley-Weimer
transmission line (non-FERC
E:\FR\FM\15DEN1.SGM
15DEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 241 / Thursday, December 15, 2011 / Notices
jurisdictional). Commission staff has
prepared an Environmental Assessment
(EA) that analyzes the potential
environmental effects of the
transmission line and concludes that
issuing a new license for the Rollins
Transmission Line Project, with
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
The EA contains staff’s analysis of the
potential environmental effects of the
project and alternatives and concludes
that licensing the project, with
appropriate environmental protective
measures, would not constitute a major
federal action that would significantly
affect the quality of the human
environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–(866) 208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending project.
For assistance, contact FERC Online
Support.
Any comments on the EA should be
filed within 30 days from the date of
this notice. Comments may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
eComment.asp. You must include your
name and contact information at the end
of your comments.
Please contact Mary Greene by
telephone at (202) 502–8865 or by email
at mary.greene@ferc.gov if you have any
questions.
Dated: December 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–32126 Filed 12–14–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
16:49 Dec 14, 2011
Jkt 226001
77995
DEPARTMENT OF ENERGY
Comment Date: 5 p.m. Eastern Time
on Monday December 19, 2011.
Federal Energy Regulatory
Commission
Dated: December 8, 2011.
Kimberly D. Bose,
Secretary.
[Docket No. PR10–63–001]
Southcross Alabama Pipeline LLC;
Notice of Filing
Take notice that on December 7, 2011,
Southcross Alabama Pipeline LLC (SAP)
submitted a revised Statement of
Operating Conditions for services
provided under Section 311 of the
Natural Gas Policy Act of 1978
(‘‘NGPA’’). SAP states the filing is to
change the effective date of the tariff to
August 31, 2011, due to the transfer of
control and name change from
Enterprise Alabama Intrastate, LLC on
that date.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
[FR Doc. 2011–32124 Filed 12–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER12–569–000]
Blackwell Wind, LLC; Supplemental
Notice that Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of
Blackwell Wind, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is December 28,
2011.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
E:\FR\FM\15DEN1.SGM
15DEN1
Agencies
[Federal Register Volume 76, Number 241 (Thursday, December 15, 2011)]
[Notices]
[Pages 77994-77995]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-32126]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2784-004-CA]
Pacific Gas and Electric Company; Notice of Availability of
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed the application for a new license for
the Rollins Transmission Line Project located within the Bear River
basin, on private land in Placer and Nevada counties, California. The
transmission line extends 0.72 mile from Nevada Irrigation District's
(NID) existing Rollins powerhouse switchyard (part of the Yuba-Bear
Hydroelectric Project, FERC Project No. 2266) to the junction with
PG&E's Drum-Grass Valley-Weimer transmission line (non-FERC
[[Page 77995]]
jurisdictional). Commission staff has prepared an Environmental
Assessment (EA) that analyzes the potential environmental effects of
the transmission line and concludes that issuing a new license for the
Rollins Transmission Line Project, with appropriate environmental
measures, would not constitute a major federal action significantly
affecting the quality of the human environment.
The EA contains staff's analysis of the potential environmental
effects of the project and alternatives and concludes that licensing
the project, with appropriate environmental protective measures, would
not constitute a major federal action that would significantly affect
the quality of the human environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-(866) 208-3676, or for
TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending project. For assistance, contact FERC
Online Support.
Any comments on the EA should be filed within 30 days from the date
of this notice. Comments may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/eComment.asp. You must include your name and contact information
at the end of your comments.
Please contact Mary Greene by telephone at (202) 502-8865 or by
email at mary.greene@ferc.gov if you have any questions.
Dated: December 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-32126 Filed 12-14-11; 8:45 am]