Download as PDF Federal Register / Vol. 76, No. 240 / Wednesday, December 14, 2011 / Notices electronic, mechanical, or other technological collection techniques or other forms of information technology. Dated: December 9, 2011. Kate Mullan, Acting Director, Information Collection Clearance Division, Privacy, Information and Records Management Services, Office of Management. mstockstill on DSK4VPTVN1PROD with NOTICES Institute of Education Sciences Type of Review: Pending. Title of Collection: Evaluation of Response to Intervention Practices for Elementary School Reading (School and Staff Practices). OMB Control Number: 1850—New. Agency Form Number(s): N/A. Frequency of Responses: On Occasion. Affected Public: State, Local or Tribal Government. Total Estimated Number of Annual Responses: 4,720. Total Estimated Annual Burden Hours: 11,886. Abstract: The Evaluation of Response to Intervention (RtI) Practices for Elementary School Reading will inform the National Assessment of Individuals With Disabilities Education Improvement Act of 2004, and the choices of districts and schools, by studying the implementation and impact of practices to identify and intervene early with struggling readers, and when needed, determine students’ eligibility for special education. The Department seeks clearance for instruments to collect data for an indepth study of the design, implementation, and impact of RtI programs. Copies of the information collection submission for OMB review may be accessed from the RegInfo.gov Web site at https://www.reginfo.gov/public/do/ PRAMain or from the Department’s Web site at https://edicsweb.ed.gov, by selecting the ‘‘Browse Pending Collections’’ link and by clicking on link number 4734. When you access the information collection, click on ‘‘Download Attachments’’ to view. Written requests for information should be addressed to U.S. Department of Education, 400 Maryland Avenue SW., LBJ, Washington, DC 20202–4537. Requests may also be electronically mailed to the Internet address ICDocketMgr@ed.gov or faxed to (202) 401–0920. Please specify the complete title of the information collection and OMB Control Number when making your request. Individuals who use a telecommunications device for the deaf (TDD) may call the Federal Information VerDate Mar<15>2010 19:11 Dec 13, 2011 Jkt 226001 Relay Service (FIRS) at 1–(800) 877– 8339. 77813 Description: Western’s Work Performance Agreement under PG&E Rate Schedule FERC No. 228 to be [FR Doc. 2011–32082 Filed 12–13–11; 8:45 am] effective 12/9/2011. BILLING CODE 4000–01–P Filed Date: 12/5/11. Accession Number: 20111205–5121. Comments Due: 5 p.m. ET 12/27/11. DEPARTMENT OF ENERGY Docket Numbers: ER12–537–000. Applicants: Ohio Valley Electric Federal Energy Regulatory Corporation. Commission Description: Transmission Planning Combined Notice of Filings #1 Process (Attachment M) Compliance Filing to be effective 9/10/2010. Take notice that the Commission Filed Date: 12/5/11. received the following electric corporate Accession Number: 20111205–5130. filings: Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: EC12–43–000. Docket Numbers: ER12–538–000. Applicants: El Paso Marketing Applicants: Southern California Company, L.L.C., Sherpa Acquisition, Edison Company. LLC. Description: LGIA Antelope Valley Description: Application for Solar PV2 Project—Solar Star California authorization for disposition of XX, LLC to be effective 12/6/2011. jurisdictional facilities of El Paso Filed Date: 12/5/11. Marketing Company, L.L.C., et al. Accession Number: 20111205–5132. Filed Date: 12/5/11. Comments Due: 5 p.m. ET 12/27/11. Accession Number: 20111205–5186. Comments Due: 5 p.m. ET 12/27/11 Docket Numbers: ER12–539–000. Take notice that the Commission Applicants: CPI Energy Services (US) received the following electric rate LLC. filings: Description: Notice of Non-Material Change to be effective 2/3/2012. Docket Numbers: ER10–1414–001; Filed Date: 12/5/11. ER11–1881–003; ER10–3166–001; Accession Number: 20111205–5133. ER11–1890–003; ER01–138–009; ER11– Comments Due: 5 p.m. ET 12/27/11. 1882–003; ER10–1406–002; ER11–1883– 003; ER11–1885–003; ER10–1416–002; Docket Numbers: ER12–540–000. ER11–1892–003; ER11–1886–003; Applicants: CPIDC, Inc. ER11–1893–003; ER11–1887–003; Description: Notice of Non-Material ER11–1889–003; ER11–1894–003; Change to be effective 2/3/2012. ER10–1345–003; ER10–1343–003; Filed Date: 12/5/11 ER10–1346–002; ER10–1348–002; Accession Number: 20111205–5137. ER11–2534–002. Comments Due: 5 p.m. ET 12/27/11. Applicants: Burley Butte Wind Park, Docket Numbers: ER12–541–000. LLC, Cadillac Renewable Energy LLC, Applicants: Frederickson Power L.P. Camp Reed Wind Park, LLC, CPI Energy Description: Notice of Non-Material Services (US) LLC, CPIDC, Inc., Delta Change to be effective 2/3/2012. Person Limited Partnership, Filed Date: 12/5/11. Frederickson Power L.P., Golden Valley Accession Number: 20111205–5142. Wind Park, LLC, Lake Cogen Ltd., Comments Due: 5 p.m. ET 12/27/11. ManChief Power Company LLC, Milner Docket Numbers: ER12–542–000. Dam Wind Park, LLC, Morris Applicants: Manchief Power Cogeneration, LLC, Oregon Trail Wind Company LLC. Park, LLC, Pasco Cogen, Ltd., Payne’s Description: Notice of Non-Material Ferry Wind Park, LLC, Pilgrim Stage Change to be effective 2/3/2012. Station Wind Park, LLC, Salmon Falls Filed Date: 12/5/11. Wind Park, LLC, Thousand Springs Accession Number: 20111205–5146. Wind Park, LLC, Tuana Gulch Wind Comments Due: 5 p.m. ET 12/27/11. Park, LLC, Yahoo Creek Wind Park, Docket Numbers: ER12–543–000. LLC, Auburndale Power Partners, Applicants: Ethical Electric Benefit Limited Partnership. Co. Description: Auburndale Power Description: Ethical Electric Benefit Partners, L.P., et al. Notice of NonCo. Market Based Rate Filing—Clone to Material Change in Status and Request be effective 12/6/2011. for Category 1 Seller Determination. Filed Date: 12/5/11. Filed Date: 12/5/11. Accession Number: 20111205–5150. Accession Number: 20111205–5187. Comments Due: 5 p.m. ET 12/27/11. Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: ER12–544–000. Docket Numbers: ER12–536–000. Applicants: Morris Cogeneration, Applicants: Pacific Gas and Electric LLC. Company. PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\14DEN1.SGM 14DEN1 mstockstill on DSK4VPTVN1PROD with NOTICES 77814 Federal Register / Vol. 76, No. 240 / Wednesday, December 14, 2011 / Notices Description: Notice of Non-Material Change to be effective 2/3/2012. Filed Date: 12/5/11. Accession Number: 20111205–5151. Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: ER12–545–000. Applicants: Lake Cogen, Ltd. Description: Notice of Non-Material Change to be effective 2/3/2012. Filed Date: 12/5/11. Accession Number: 20111205–5152. Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: ER12–546–000. Applicants: Pasco Cogen, Ltd. Description: Notice of Non-Material Change to be effective 2/3/2012. Filed Date: 12/5/11. Accession Number: 20111205–5153. Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: ER12–547–000. Applicants: Auburndale Power Partners, Limited Partnership. Description: Notice of Non-Material Change to be effective 2/3/2012. Filed Date: 12/5/11. Accession Number: 20111205–5154. Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: ER12–548–000. Applicants: CP Energy Marketing (US) Inc. Description: Request for Category 1 Status of CP Energy Marketing (US) Inc. to be effective 11/5/2011. Filed Date: 12/5/11. Accession Number: 20111205–5155. Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: ER12–549–000. Applicants: CPI USA North Carolina LLC. Description: Request for Category 1 Seller Status of CPI USA North Carolina LLC to be effective 11/5/2011. Filed Date: 12/5/11 Accession Number: 20111205–5156. Comments Due: 5 p.m. ET 12/27/11. Docket Numbers: ER12–550–000. Applicants: Southwest Power Pool, Inc. Description: Order No. 719 Compliance Filing—Docket Nos. ER09– 1050, ER09–748, and ER09–1192 to be effective 12/5/2011. Filed Date: 12/5/11. Accession Number: 20111205–5161. Comments Due: 5 p.m. ET 12/27/11. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but VerDate Mar<15>2010 15:14 Dec 13, 2011 Jkt 226001 intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 6, 2011. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2011–31979 Filed 12–13–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–15–000] Cameron LNG, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed BOG Liquefaction Project, and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the BOG Liquefaction Project involving construction and operation of facilities by Cameron LNG, LLC (Cameron LNG) in Cameron Parish, Louisiana. This EA will be used by the Commission in its decision-making process to determine whether the project is in the public interest. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues need to be evaluated in the EA. Comments may be submitted in written form or verbally. Further details on how to submit written comments are provided in the Public Participation section of this notice. Please note that the scoping period will close on January 13, 2012. This notice is being sent to the Commission’s current environmental mailing list for this project. State and local government representatives are asked to notify their constituents of this proposed project and encourage them to comment on their areas of concern. Summary of the Proposed Project Cameron LNG plans to construct and operate facilities necessary to liquefy boil-off gas (BOG) at its existing liquefied natural gas (LNG) terminal in PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 Cameron Parish, Louisiana. According to Cameron LNG, the BOG Liquefaction Project would provide a more economical means of maintaining sufficient LNG in each of the terminal’s storage tanks. Currently, BOG is sent out via delivery into the Cameron Interstate Pipeline. The proposed BOG Liquefaction Project would consist of the following facilities: • An electric-motor driven centrifugal refrigeration compressor; • A cryogenic plate-fin heat exchanger; • Ancillary aerial coolers, knockout vessels, pumps, and piping for the closed loop refrigeration cycle; • Four small (less than 10,000 pounds each) pressure vessels for refrigerant; • Interconnecting gas piping (4-inchdiameter) from the existing pipeline compressors to the liquefaction unit; and • A single 3-inch-diameter interconnecting LNG line from the liquefaction unit back to the terminal’s LNG return header. The general location of the project facilities is shown in appendix 1.1 Land Requirements for Construction The BOG Liquefaction Project would occupy an area approximately 1 acre in size wholly within the existing terminal and would not require any new land. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers an authorization of a project. NEPA also requires us 2 to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. We will consider all filed comments during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the 1 The appendices referenced in this notice will not appear in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at https:// www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. E:\FR\FM\14DEN1.SGM 14DEN1

Agencies

[Federal Register Volume 76, Number 240 (Wednesday, December 14, 2011)]
[Notices]
[Pages 77813-77814]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-31979]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC12-43-000.
    Applicants: El Paso Marketing Company, L.L.C., Sherpa Acquisition, 
LLC.
    Description: Application for authorization for disposition of 
jurisdictional facilities of El Paso Marketing Company, L.L.C., et al.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5186.
    Comments Due: 5 p.m. ET 12/27/11

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-1414-001; ER11-1881-003; ER10-3166-001; ER11-
1890-003; ER01-138-009; ER11-1882-003; ER10-1406-002; ER11-1883-003; 
ER11-1885-003; ER10-1416-002; ER11-1892-003; ER11-1886-003; ER11-1893-
003; ER11-1887-003; ER11-1889-003; ER11-1894-003; ER10-1345-003; ER10-
1343-003; ER10-1346-002; ER10-1348-002; ER11-2534-002.
    Applicants: Burley Butte Wind Park, LLC, Cadillac Renewable Energy 
LLC, Camp Reed Wind Park, LLC, CPI Energy Services (US) LLC, CPIDC, 
Inc., Delta Person Limited Partnership, Frederickson Power L.P., Golden 
Valley Wind Park, LLC, Lake Cogen Ltd., ManChief Power Company LLC, 
Milner Dam Wind Park, LLC, Morris Cogeneration, LLC, Oregon Trail Wind 
Park, LLC, Pasco Cogen, Ltd., Payne's Ferry Wind Park, LLC, Pilgrim 
Stage Station Wind Park, LLC, Salmon Falls Wind Park, LLC, Thousand 
Springs Wind Park, LLC, Tuana Gulch Wind Park, LLC, Yahoo Creek Wind 
Park, LLC, Auburndale Power Partners, Limited Partnership.
    Description: Auburndale Power Partners, L.P., et al. Notice of Non-
Material Change in Status and Request for Category 1 Seller 
Determination.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5187.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-536-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Western's Work Performance Agreement under PG&E Rate 
Schedule FERC No. 228 to be effective 12/9/2011.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5121.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-537-000.
    Applicants: Ohio Valley Electric Corporation.
    Description: Transmission Planning Process (Attachment M) 
Compliance Filing to be effective 9/10/2010.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5130.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-538-000.
    Applicants: Southern California Edison Company.
    Description: LGIA Antelope Valley Solar PV2 Project--Solar Star 
California XX, LLC to be effective 12/6/2011.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5132.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-539-000.
    Applicants: CPI Energy Services (US) LLC.
    Description: Notice of Non-Material Change to be effective 2/3/
2012.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5133.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-540-000.
    Applicants: CPIDC, Inc.
    Description: Notice of Non-Material Change to be effective 2/3/
2012.
    Filed Date: 12/5/11
    Accession Number: 20111205-5137.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-541-000.
    Applicants: Frederickson Power L.P.
    Description: Notice of Non-Material Change to be effective 2/3/
2012.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5142.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-542-000.
    Applicants: Manchief Power Company LLC.
    Description: Notice of Non-Material Change to be effective 2/3/
2012.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5146.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-543-000.
    Applicants: Ethical Electric Benefit Co.
    Description: Ethical Electric Benefit Co. Market Based Rate 
Filing--Clone to be effective 12/6/2011.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5150.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-544-000.
    Applicants: Morris Cogeneration, LLC.

[[Page 77814]]

    Description: Notice of Non-Material Change to be effective 2/3/
2012.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5151.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-545-000.
    Applicants: Lake Cogen, Ltd.
    Description: Notice of Non-Material Change to be effective 2/3/
2012.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5152.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-546-000.
    Applicants: Pasco Cogen, Ltd.
    Description: Notice of Non-Material Change to be effective 2/3/
2012.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5153.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-547-000.
    Applicants: Auburndale Power Partners, Limited Partnership.
    Description: Notice of Non-Material Change to be effective 2/3/
2012.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5154.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-548-000.
    Applicants: CP Energy Marketing (US) Inc.
    Description: Request for Category 1 Status of CP Energy Marketing 
(US) Inc. to be effective 11/5/2011.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5155.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-549-000.
    Applicants: CPI USA North Carolina LLC.
    Description: Request for Category 1 Seller Status of CPI USA North 
Carolina LLC to be effective 11/5/2011.
    Filed Date: 12/5/11
    Accession Number: 20111205-5156.
    Comments Due: 5 p.m. ET 12/27/11.

    Docket Numbers: ER12-550-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Order No. 719 Compliance Filing--Docket Nos. ER09-
1050, ER09-748, and ER09-1192 to be effective 12/5/2011.
    Filed Date: 12/5/11.
    Accession Number: 20111205-5161.
    Comments Due: 5 p.m. ET 12/27/11.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: December 6, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011-31979 Filed 12-13-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.