Inside Passage Electric Cooperative; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 76705 [2011-31517]
Download as PDF
Federal Register / Vol. 76, No. 236 / Thursday, December 8, 2011 / Notices
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Ohio State
Historic Preservation Officer (SHPO), as
required by § 106, National Historic
Preservation Act, and the regulations of
the Advisory Council on Historic
Preservation, 36, CFR, at 800.4.
q. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Notice of Acceptance ............
Scoping Document 1 issued
for comments.
Comments on Scoping Document 1.
Scoping Document 2 and additional information request, if necessary.
Notice of Ready for Environmental Analysis.
Commission issues a single
EA.
January 2011.
March 2012.
April 2012.
May 2012.
July 2012.
February
2013.
Dated: December 2, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–31516 Filed 12–7–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
[Project No. 14066–001]
Inside Passage Electric Cooperative;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 14066–001.
c. Date Filed: October 28, 2011.
VerDate Mar<15>2010
15:59 Dec 07, 2011
Jkt 226001
d. Submitted By: Inside Passage
Electric Cooperative (IPEC).
e. Name of Project: Gartina Falls
Hydroelectric Project.
f. Location: On Gartina Creek, near
Hoonah, Alaska, on Chichagof Island.
No federal lands are occupied by the
project works.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Peter
Bibb, Inside Passage Electric
Cooperative, P.O. Box 210149, 12480
Mendenhall Loop Rd, Auke Bay 99821;
(907) 789–3196; email—pbibb@ak.net.
i. FERC Contact: Ryan Hansen at (202)
502–8074; or email at
ryan.hansen@ferc.gov.
j. IPEC filed its request to use the
Traditional Licensing Process on
October 28, 2011. IPEC provided public
notice of its request on November 22,
2011. In a letter dated December 2,
2011, the Director of the Division of
Hydropower Licensing approved IPEC’s
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the Alaska State Historic Preservation
Officer, as required by section 106,
National Historical Preservation Act,
and the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
IPEC as the Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act, section 305
of the Magnuson-Stevens Fishery
Conservation and Management Act, and
section 106 of the National Historic
Preservation Act.
m. IPEC filed a Pre-Application
Document (PAD; including a proposed
process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
76705
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: December 2, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–31517 Filed 12–7–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–18–000]
Questar Pipeline Company; Notice of
Application
Take notice that on November 16,
2011, Questar Pipeline Company
(Questar), 180 East 100 South, Salt Lake
City, Utah 84111, filed with the Federal
Energy Regulatory Commission an
application under sections 7(b) and 7(c)
of the Natural Gas Act seeking authority
to expand its interstate natural-gas
transmission system by abandoning 8.3
miles of 14-inch diameter pipeline and
replacing it with 8.5 miles of 20-inch
diameter pipeline located within Uintah
County, Utah. Questar states it has no
firm Transportation Service Agreements
with shippers for the incremental 7,500
Dth/d of incremental capacity created
by the Project. However, Questar states
that it will accept the economic risk
associated with construction of the
Project, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. This filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site Web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the
application should be directed to L.
Bradley Burton, General Manager,
Federal Regulatory Affairs Division
Counsel and Chief Compliance Officer
Questar Pipeline Company, 180 East 100
South, P.O. Box 45360, Salt Lake City,
E:\FR\FM\08DEN1.SGM
08DEN1
Agencies
[Federal Register Volume 76, Number 236 (Thursday, December 8, 2011)]
[Notices]
[Page 76705]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-31517]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14066-001]
Inside Passage Electric Cooperative; Notice of Intent To File
License Application, Filing of Pre-Application Document, and Approving
Use of the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 14066-001.
c. Date Filed: October 28, 2011.
d. Submitted By: Inside Passage Electric Cooperative (IPEC).
e. Name of Project: Gartina Falls Hydroelectric Project.
f. Location: On Gartina Creek, near Hoonah, Alaska, on Chichagof
Island. No federal lands are occupied by the project works.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Peter Bibb, Inside Passage Electric
Cooperative, P.O. Box 210149, 12480 Mendenhall Loop Rd, Auke Bay 99821;
(907) 789-3196; email_pbibb@ak.net.
i. FERC Contact: Ryan Hansen at (202) 502-8074; or email at
ryan.hansen@ferc.gov.
j. IPEC filed its request to use the Traditional Licensing Process
on October 28, 2011. IPEC provided public notice of its request on
November 22, 2011. In a letter dated December 2, 2011, the Director of
the Division of Hydropower Licensing approved IPEC's request to use the
Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402; (b) NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920; and (c) the Alaska State
Historic Preservation Officer, as required by section 106, National
Historical Preservation Act, and the implementing regulations of the
Advisory Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating IPEC as the Commission's
non-federal representative for carrying out informal consultation,
pursuant to section 7 of the Endangered Species Act, section 305 of the
Magnuson-Stevens Fishery Conservation and Management Act, and section
106 of the National Historic Preservation Act.
m. IPEC filed a Pre-Application Document (PAD; including a proposed
process plan and schedule) with the Commission, pursuant to 18 CFR 5.6
of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCONlineSupport@ferc.gov or toll free at 1-(866) 208-3676, or for
TTY, (202) 502-8659. A copy is also available for inspection and
reproduction at the address in paragraph h.
o. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: December 2, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-31517 Filed 12-7-11; 8:45 am]