Environmental Impacts Statements; Notice of Availability, 75543-75544 [2011-31032]
Download as PDF
Federal Register / Vol. 76, No. 232 / Friday, December 2, 2011 / Notices
FERC Contact: Brian Csernak; phone:
(202) 502–6144.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/efiling.asp.
Enter the docket number (P–14290–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: November 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–30968 Filed 12–1–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jlentini on DSK4TPTVN1PROD with NOTICES
[Project No. 13254–001]
Castle Creek Hydroelectric Project;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On November 1, 2011, the City of
Aspen, Colorado, filed an application
for a successive preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
VerDate Mar<15>2010
17:03 Dec 01, 2011
Jkt 226001
feasibility of the Castle Creek
Hydroelectric Project to be located on
Castle Creek, near the town of Aspen,
Pitkin County, Colorado. The project
would affect federal lands administered
by the Forest Service. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the existing Thomas reservoir, Castle
Creek and Maroon Creek diversions, a
recently constructed penstock, and a 25kilovolt transmission line. The
reservoir, formed by a 13-foot-high
upstream heel and 30-foot-high
downstream toe, has a total storage
capacity of 15 acre-feet and a water
surface area of 0.6 acre at full pool
elevation of 8,175 feet above mean sea
level. The penstock consists of a 42inch-diameter, 4,000-foot-long pipeline
connecting the reservoir to the proposed
powerhouse.
The proposed powerhouse would be
located adjacent to the original
hydroelectric plant, with a single shaft
Pelton turbine, producing 1.175
megawatts of generating capacity. The
annual energy output would be
approximately 7.7 gigawatthours.
Applicant Contact: David Hornbacher,
The City of Aspen, 130 South Galena
Street, Aspen, CO 81611; phone (970)
429–1983.
FERC Contact: Brian Csernak; phone:
(202) 502–6144.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
75543
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13254–001) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: November 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–30972 Filed 12–1–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10172–038]
Missisquoi River Technologies;
Missisquoi River Hydro LLC; Notice of
Transfer of Exemption
1. By letter filed November 16, 2011,
Missisquoi River Technologies informed
the Commission that its exemption from
licensing for the North Troy
Hydroelectric Project No. 10172,
originally issued June 29, 1989,1 has
been transferred to Missisquoi River
Hydro LLC. The project is located on the
Missisquoi River in Orleans County,
Vermont. The transfer of an exemption
does not require Commission approval.
2. Missisquoi River Hydro LLC,
located at 453 East Hill Rd., Middlesex,
VT 05602, is now the exemptee of the
North Troy Hydroelectric Project No.
10172.
Dated: November 28, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–31029 Filed 12–1–11; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9000–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
1 47
E:\FR\FM\02DEN1.SGM
FERC ¶ 62,284 (1989).
02DEN1
75544
Federal Register / Vol. 76, No. 232 / Friday, December 2, 2011 / Notices
jlentini on DSK4TPTVN1PROD with NOTICES
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 11/14/2011 through 11/18/2011
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EIS are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20110402, Draft EIS, USAF, OH,
Wright-Patterson Air Force Base
(WPAFB) Project, Reconfigure and
Relocate Facilities and Base Perimeter
Fence Relocation Area, OH, Comment
Period Ends: 01/17/2012, Contact:
Karen Beason (937) 257–5899.
EIS No. 20110403, Draft EIS, USFS, CA,
Creeks II Forest Restoration Project,
Proposal to Protect Rural
Communities from Fire Hazards by
Constructing Fuel Breaks Known as
Defensible Fuel Profile Zones
(DFPZs), Lassen National Forest,
Almanor Ranger District, Plumas
County, CA, Comment Period Ends:
01/17/2012, Contact: Blair Halbrooks
(530) 258–5160.
EIS No. 20110404, Draft EIS, BLM, NV,
Mount Hope Project, Molybdenum
Mining and Processing Operation in
Eureka County, NV, Comment Period
Ends: 03/07/2012, Contact: Angelica
Rose (775) 635–4000.
EIS No. 20110405, Third Final
Supplement, USFS, MT, Bozeman
Municipal Watershed Project, Minor
Changes to FSEIS of May 2011, to
Address New Additions to the
Sensitive Species List, to Implement
Fuel Reduction Activities, Bozeman
Ranger District, Gallatin National
Forest, City of Bozeman Municipal
Watershed, Gallatin County, MT,
Review Period Ends: 01/03/2012,
Contact: Teri Seth (406) 522–2539.
EIS No. 20110406, Draft EIS, USN, CA,
Marine Corps Base Camp Pendleton
Project, Basewide Water Infrastructure
and Stuart Mesa Bridge Replacement,
Implementation, San Diego County,
CA, Comment Period Ends: 01/17/
2012, Contact: Jesse Martinez (619)
532–3844.
EIS No. 20110407, Draft Supplement,
USFS, ID, Lakeview-Reeder Fuels
Reduction Project, Proposed Fuels
Reduction and Road Treatment
Activities, Updated and New
Information, Idaho Panhandle
National Forests, Priest Lake Ranger
District, Bonner County, ID, Comment
Period Ends: 01/17/2012, Contact:
Albert Helgenberg (208) 265–6643.
VerDate Mar<15>2010
17:03 Dec 01, 2011
Jkt 226001
EIS No. 20110408, Final EIS, USFS, ID,
Lower Orogrande Project, Proposes
Watershed Improvement Timber
Harvest and Wildlife Habitat
Enhancement Activities, North Fork
Ranger District, Clearwater National
Forest, Clearwater County, ID, Review
Period Ends: 01/03/2012, Contact:
Kathy Rodriguez (208) 476–4541.
Amended Notices
EIS No. 20110327, Draft EIS, BR, 00,
Klamath Facilities Removal Project,
Advance Restoration of the Salmonid
Fisheries Klamath Basin, Siskiyou
County, CA and Klamath County, OR,
Comment Period Ends: 12/30/2011,
Contact: Elizabeth Vasqueuz (916)
978–5055. Revision to FR Notice 09/
30/2011: Extending Comment Period
from 11/29/2011 to 12/30/2011.
Dated: November 29, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2011–31032 Filed 12–1–11; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9497–4]
Proposed Consent Decree, Clean Air
Act Citizen Suit
Environmental Protection
Agency (EPA).
ACTION: Notice of Proposed Consent
Decree; Request for Public Comment.
AGENCY:
In accordance with section
113(g) of the Clean Air Act, as amended
(‘‘CAA’’ or the ‘‘Act’’), 42 U.S.C.
7413(g), notice is hereby given of a
proposed consent decree to address a
lawsuit filed by National Parks
Conservation Association, Montana
Environmental Information Center,
Grand Canyon Trust, San Juan Citizens
Alliance, Our Children’s Earth
Foundation, Plains Justice, Powder
River Basin Resource Council, Sierra
Club, and Environmental Defense Fund
(collectively ‘‘Plaintiffs’’) in the United
States District Court for the District of
Columbia: National Parks Conservation
Association, et al. v. Jackson, No. 1:11–
cv–1548 (D.D.C.). Plaintiffs filed a
complaint alleging that EPA failed to
promulgate regional haze federal
implementation plans (FIPs) or approve
regional haze state implementation
plans (SIPs) for 34 states, as required by
section 110(c) of the CAA. The
complaint further alleges that EPA has
also failed to act on ten regional haze
SIPs submissions, as required by section
SUMMARY:
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
110(k) of the CAA. The proposed
consent decree establishes proposed and
final promulgation deadlines for EPA
for meeting these obligations.
DATES: Written comments on the
proposed consent decree must be
received by January 3, 2012.
ADDRESSES: Submit your comments,
identified by Docket ID number EPA–
HQ–OGC–2011–0929, online at https://
www.regulations.gov (EPA’s preferred
method); by email to oei.docket@epa.
gov; by mail to EPA Docket Center,
Environmental Protection Agency,
Mailcode: 2822T, 1200 Pennsylvania
Ave. NW., Washington, DC 20460–0001;
or by hand delivery or courier to EPA
Docket Center, EPA West, Room 3334,
1301 Constitution Ave. NW.,
Washington, DC, between 8:30 a.m. and
4:30 p.m. Monday through Friday,
excluding legal holidays. Comments on
a disk or CD–ROM should be formatted
in Word or ASCII file, avoiding the use
of special characters and any form of
encryption, and may be mailed to the
mailing address above.
FOR FURTHER INFORMATION CONTACT: Lea
Anderson, Air and Radiation Law Office
(2344A), Office of General Counsel, U.S.
Environmental Protection Agency, 1200
Pennsylvania Ave. NW., Washington,
DC 20460; telephone: (202) 564–5571;
fax number (202) 564–5603; email
address: anderson.lea@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Additional Information About the
Proposed Consent Decree
Under section 110(c) of the CAA, EPA
has a mandatory duty to promulgate a
federal implementation plan (‘‘FIP’’)
within two years of a finding that a state
has failed to make a required state
implementation plan (‘‘SIP’’) submittal.
EPA is not required to promulgate a FIP,
however, if the state submits the
required SIP and EPA approves the plan
within the two years of EPA’s finding.
On January 15, 2009, EPA found that 37
states, the District of Columbia, and the
U.S. Virgin Islands had failed to submit
CAA SIPs for improving visibility in
mandatory Federal Class I areas.
Where a state has submitted a SIP and
the SIP has been deemed complete,
section 110(k)(2) of the CAA requires
EPA to act on the SIP within twelve
months. EPA has received regional haze
SIP submissions from a number of states
but has not yet taken action on these
SIPs.
The proposed consent decree would
resolve a deadline suit filed by Plaintiffs
for EPA to take action on a number of
regional haze SIPs. The proposed
consent decree would address EPA’s
failure to promulgate regional haze FIPs
E:\FR\FM\02DEN1.SGM
02DEN1
Agencies
[Federal Register Volume 76, Number 232 (Friday, December 2, 2011)]
[Notices]
[Pages 75543-75544]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-31032]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9000-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202)
[[Page 75544]]
564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 11/14/2011 through 11/18/2011
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EIS are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20110402, Draft EIS, USAF, OH, Wright-Patterson Air Force Base
(WPAFB) Project, Reconfigure and Relocate Facilities and Base Perimeter
Fence Relocation Area, OH, Comment Period Ends: 01/17/2012, Contact:
Karen Beason (937) 257-5899.
EIS No. 20110403, Draft EIS, USFS, CA, Creeks II Forest Restoration
Project, Proposal to Protect Rural Communities from Fire Hazards by
Constructing Fuel Breaks Known as Defensible Fuel Profile Zones
(DFPZs), Lassen National Forest, Almanor Ranger District, Plumas
County, CA, Comment Period Ends: 01/17/2012, Contact: Blair Halbrooks
(530) 258-5160.
EIS No. 20110404, Draft EIS, BLM, NV, Mount Hope Project, Molybdenum
Mining and Processing Operation in Eureka County, NV, Comment Period
Ends: 03/07/2012, Contact: Angelica Rose (775) 635-4000.
EIS No. 20110405, Third Final Supplement, USFS, MT, Bozeman Municipal
Watershed Project, Minor Changes to FSEIS of May 2011, to Address New
Additions to the Sensitive Species List, to Implement Fuel Reduction
Activities, Bozeman Ranger District, Gallatin National Forest, City of
Bozeman Municipal Watershed, Gallatin County, MT, Review Period Ends:
01/03/2012, Contact: Teri Seth (406) 522-2539.
EIS No. 20110406, Draft EIS, USN, CA, Marine Corps Base Camp Pendleton
Project, Basewide Water Infrastructure and Stuart Mesa Bridge
Replacement, Implementation, San Diego County, CA, Comment Period Ends:
01/17/2012, Contact: Jesse Martinez (619) 532-3844.
EIS No. 20110407, Draft Supplement, USFS, ID, Lakeview-Reeder Fuels
Reduction Project, Proposed Fuels Reduction and Road Treatment
Activities, Updated and New Information, Idaho Panhandle National
Forests, Priest Lake Ranger District, Bonner County, ID, Comment Period
Ends: 01/17/2012, Contact: Albert Helgenberg (208) 265-6643.
EIS No. 20110408, Final EIS, USFS, ID, Lower Orogrande Project,
Proposes Watershed Improvement Timber Harvest and Wildlife Habitat
Enhancement Activities, North Fork Ranger District, Clearwater National
Forest, Clearwater County, ID, Review Period Ends: 01/03/2012, Contact:
Kathy Rodriguez (208) 476-4541.
Amended Notices
EIS No. 20110327, Draft EIS, BR, 00, Klamath Facilities Removal
Project, Advance Restoration of the Salmonid Fisheries Klamath Basin,
Siskiyou County, CA and Klamath County, OR, Comment Period Ends: 12/30/
2011, Contact: Elizabeth Vasqueuz (916) 978-5055. Revision to FR Notice
09/30/2011: Extending Comment Period from 11/29/2011 to 12/30/2011.
Dated: November 29, 2011.
Cliff Rader,
Acting Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2011-31032 Filed 12-1-11; 8:45 am]
BILLING CODE 6560-50-P