Download as PDF Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices students, the media, and others interested in criminal justice statistics. No other collection series provides these data. (5) An estimate of the total number of respondents and the amount of time estimated for an average respondent to respond: It is estimated that approximately 1,400 respondents will spend 8 minutes on average responding to a telephone screener to determine if each meet the BJS definition of a probation agency and supervise adults. The initial roster of potential adult probation supervising agencies was developed using available information sources and the telephone screener will be necessary to ensure that each meet the BJS criteria for inclusion in the census. Those that do not meet these two criteria will not be asked to complete the full questionnaire. It is estimated that approximately 95% or about 1,330 respondents will meet the BJS definition of a probation agency and supervise adults. These respondents will spend approximately two hours on average responding to the full questionnaire (Web instrument). (6) An estimate of the total public burden (in hours) associated with the collection: There are an estimated 2,847 total maximum burden hours associated with this collection. If additional information is required, contact: Jerri Murray, Department Clearance Officer, United States Department of Justice, Justice Management Division, Policy and Planning Staff, Two Constitution Square, 145 N Street NE., Suite 2E–508, Washington, DC 20530. Jerri Murray, Department Clearance Officer, PRA, United States Department of Justice. [FR Doc. 2011–30406 Filed 11–30–11; 8:45 am] BILLING CODE 4410–18–P 74813 MILLENNIUM CHALLENGE CORPORATION [MCC 11–14] Notice of Quarterly Report (July 1, 2011–September 30, 2011) Millennium Challenge Corporation. SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the quarter July 1, 2011 through September 30, 2011, on assistance provided under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The following report will be made available to the public by publication in the Federal Register and on the Internet Web site of the MCC (https://www.mcc.gov) in accordance with section 612(b) of the Act. AGENCY: ASSISTANCE PROVIDED UNDER SECTION 605 Projects Obligated Objectives Cumulative expenditures Measures Country: Madagascar Year: 2011 Quarter 4 Total Obligation: $84,367,700 Entity to which the assistance is provided: MCA Madagascar Total Quarterly Expenditures 1: $0 $29,470,241 Increase Land Titling and Security. $29,304,770 Area secured with land certificates or titles in the Zones. Legal and regulatory reforms adopted. Number of land documents inventoried in the Zones and Antananarivo. Number of land documents restored in the Zones and Antananarivo. Number of land documents digitized in the Zones and Antananarivo. Average time for Land Services Offices to issue a duplicate copy of a title. Average cost to a user to obtain a duplicate copy of a title from the Land Services Offices. Number of land certificates delivered in the Zones during the period. Number of new guichets fonciers operating in the Zones. The 256 Plan Local d’Occupation Foncier—Local Plan of Land Occupation (PLOFs) are completed. Financial Sector Reform Project. emcdonald on DSK5VPTVN1PROD with NOTICES Land Tenure Project ........ $23,535,780 Increase Competition in the Financial Sector. $23,535,781 Volume of funds processed annually by the national payment system. Number of accountants and financial experts registered to become CPA. Number of Central Bank branches capable of accepting auction tenders. Outstanding value of savings accounts from CEM in the Zones. Number of Micro-Finance Institutions (MFIs) participating in the Refinancing and Guarantee funds. Maximum check clearing delay. Network equipment and integrator. Real time gross settlement system (RTGS). Telecommunication facilities. Retail payment clearing system. Number of CEM branches built in the Zones. Number of savings accounts from CEM in the Zones. VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 74814 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices ASSISTANCE PROVIDED UNDER SECTION 605—Continued Projects Obligated Objectives Cumulative expenditures Measures Percent of Micro-Finance Institution (MFI) loans recorded in the Central Bank database. Agricultural Business Investment Project. $13,582,550 Improve Agricultural Projection Technologies and Market Capacity in Rural Areas. $13,582,534 Program Administration 2 and Control, Monitoring and Evaluation. $17,779,126 ......................................... $17,779,127 .......................... ......................................... $1,392,568 Pending subsequent reports 3. Number of farmers receiving technical assistance. Number of marketing contracts of ABC clients. Number of farmers employing technical assistance. Value of refinancing loans and guarantees issued to participating MFIs (as a measure of value of agricultural and rural loans). ` Number of Mnistere de l’Agriculture,de l’Elevage et ˆ de la Peche- Ministry of Agriculture, Livestock, and Fishing (MAEP) agents trained in marketing and investment promotion. Number of people receiving information from Agricultural Business Center (ABCs) on business opportunities. FY2010 Madagascar post-compact disbursement related to final payment of audit expenses. Projects Obligated Objective Cumulative expenditures Country: Honduras Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Honduras Rural Development Project. emcdonald on DSK5VPTVN1PROD with NOTICES Transportation Project ..... VerDate Mar<15>2010 17:34 Nov 30, 2011 Measures Total Obligation: $205,000,000 Total Quarterly Expenditures 1: $79,584 $68,273,380 Increase the productivity and business skills of farmers who operate small and medium-size farms and their employees. $68,264,510 Number of program farmers harvesting high-value horticulture crops. Number of hectares harvesting high-value horticulture crops. Number of business plans prepared by program farmers with assistance from the implementing entity. Total value of net sales. Total number of recruited farmers receiving technical assistance. Value of loans disbursed to farmers, agribusiness, and other producers and vendors in the horticulture industry, including Program Farmers, cumulative to date, Trust Fund Resources. Number of loans disbursed (disaggregated by trust fund, leveraged from trust fund, and institutions receiving technical assistance from ACDI– VOCA). Number of hectares under irrigation. Number of farmers connected to the community irrigation system. $120,591,240 Reduce transportation costs between targeted production centers and national, regional and global markets. $120,584,457 Freight shipment cost from Tegucigalpa to Puerto Cortes. Average annual daily traffic volume—CA–5. International roughness index (IRI)—CA–5. Kilometers of road upgraded—CA–5. Percent of contracted road works disbursed—CA– 5. Average annual daily traffic volume—secondary roads. International roughness index (IRI)—secondary roads. Kilometers of road upgraded—secondary roads. Average annual daily traffic volume—rural roads. Average speed—Cost per journey (rural roads). Kilometers of road upgraded—rural roads. Percent disbursed for contracted studies. Jkt 226001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Cumulative expenditures 74815 Measures Value of signed contracts for feasibility, design, supervision and program management contracts. Kilometers (km) of roads under design. Number of Construction works and supervision contracts signed. Kilometers (km) of roads under works contracts. Program Administration,2 and Control, Monitoring and Evaluation. Pending subsequent reports 3. $16,135,380 ......................................... $15,166,048 .......................... ......................................... $0 The negative quarterly expenditure for Honduras is related to expense accruals. The accruals will be reversed in 2011 and applied to various projects and activities. Projects Obligated Objectives Cumulative expenditures Country: Cape Verde Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Cape Verde Measures Total Obligation: $110,078,488 Total Quarterly Expenditures 1: $1,038,897 Watershed and Agricultural Support Project. $12,011,603 Increase agricultural production in three targeted watershed areas on three islands. $11,602,406 Productivity: Horticulture, Paul watershed. Productivity: Horticulture, Faja watershed. Productivity: Horticulture, Mosteiros watershed. Number of farmers adopting drip irrigation: All intervention watersheds (Paul, Faja and Mosteiros). Hectares under improved or new irrigation (All Watersheds Paul, Faja, and Mosteiros). Irrigation Works: Percent contracted works disbursed. All intervention watersheds (Paul, Faja and Mosteiros). Number of reservoirs constructed in all intervention watersheds (Paul, Faja and Mosteiros) (incremental). Number of farmers trained. Infrastructure Improvement Project. $82,630,208 Increase integration of the internal market and reduce transportation costs. $82,542,708 Travel time ratio: Percentage of beneficiary population further than 30 minutes from nearest market. Kilometers of roads/bridges completed. Percent of contracted road works disbursed (cumulative). Port of Praia: Percent of contracted port works disbursed (cumulative). Private Sector Development Project. $1,920,018 Spur private sector development on all islands through increased investment in the priority sectors and through financial sector reform. $1,824,566 Micro-Finance Institutions portfolio at risk, adjusted (level). $13,516,659 ......................................... $12,542,777 .......................... ......................................... $0 Obligated Objective Program Administration,2 and Control, Monitoring and Evaluation. Pending subsequent reports 3. emcdonald on DSK5VPTVN1PROD with NOTICES Projects Cumulative expenditures Country: Nicaragua Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Nicaragua Property Regularization Project. VerDate Mar<15>2010 17:34 Nov 30, 2011 $7,180,454 Jkt 226001 Increase Investment by strengthening property rights. PO 00000 Frm 00045 Fmt 4703 Measures Total Obligation: $113,500,000 Total Quarterly Expenditures 1: ¥$296,623 $6,694,971 Sfmt 4703 Automated database of registry and cadastre installed in the 10 municipalities of Leon. Value of land, urban. Value of land, rural. Time to conduct a land transaction. E:\FR\FM\01DEN1.SGM 01DEN1 74816 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Cumulative expenditures Measures Number of additional parcels with a registered title, urban. Number of additional parcels with a registered title, rural. Area covered by cadastral mapping. Cost to conduct a land transaction. Transportation Project ..... $58,000,000 Reduce transportation costs between Leon and Chinandega and national, regional and global markets. $56,740,790 Annual Average daily traffic volume: N1 Section R1. Annual Average daily traffic volume: N1 Section R2. Annual Average daily traffic volume: Port Sandino (S13). Annual Average daily traffic volume: Villanueva— Guasaule Annual. Average daily traffic volume: Somotillo-Cinco Pinos (S1). ´ Annual average daily traffic volume: Leon˜ Poneloya-Las Penitas. International Roughness Index: N–I Section R1. International Roughness Index: N–I Section R2. International Roughness Index: Port Sandino (S13). International roughness index: Villanueva— Guasaule. International roughness index: Somotillo-Cinco Pinos. ´ International roughness index: Leon-Poneloya-Las ˜ Penitas. Kilometers of NI upgraded: R1 and R2 and S13. Kilometers of NI upgraded: Villanueva—Guasaule. Kilometers of S1 road upgraded. Kilometers of S9 road upgraded. Rural Development Project. $32,875,845 Increase the value added of farms and enterprises in the region. $31,360,605 Number of beneficiaries with business plans. Numbers of manzanas (1 manzana = 1.7 hectares), by sector, harvesting higher-value crops. Number of beneficiaries with business plans prepared with assistance of Rural Business Development Project. Number of beneficiaries implementing forestry business plans under Improvement of Water Supplies Activity. Number of Manzanas reforested. Number of Manzanas with trees planted. Program Administration,2 Due Diligence, Monitoring and Evaluation. $15,443,701 ......................................... $15,451,111 .......................... ......................................... $2,528,880 Obligated Objective Pending subsequent reports 3. Projects Cumulative expenditures Country: Georgia Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Georgia emcdonald on DSK5VPTVN1PROD with NOTICES Regional Infrastructure Rehabilitation Project. VerDate Mar<15>2010 17:34 Nov 30, 2011 $314,240,000 Jkt 226001 Key Regional Infrastructure Rehabilitated. PO 00000 Frm 00046 Fmt 4703 Total Obligation: $395,300,000 Total Quarterly Expenditures 1: $815,885 $309,899,736 Sfmt 4703 Measures Household savings from Infrastructure Rehabilitation Activities. Savings in vehicle operating costs (VOC). International roughness index (IRI). Annual average daily traffic (AADT). Travel Time. Kilometers of road completed. Signed contracts for feasibility and/or design studies. Percent of contracted studies disbursed. Kilometers of roads under design. Signed contracts for road works. Kilometers of roads under works contracts. Sites rehabilitated (phases I, II, III)—pipeline. Construction works completed (phase II)—pipeline. E:\FR\FM\01DEN1.SGM 01DEN1 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Cumulative expenditures 74817 Measures Savings in household expenditures for all RID subprojects. Population Served by all RID subprojects. RID Subprojects completed. Value of Grant Agreements signed. Value of project works and goods contracts Signed. Subprojects with works initiated. Regional Enterprise Development Project. $52,040,800 Enterprises in Regions Developed. $52,040,800 Program Administration,2 Due Diligence, Monitoring and Evaluation. $29,019,200 ......................................... $25,237,983 .......................... ......................................... $0 Pending subsequent reports 3. Jobs Created by Agribusiness Development Activity (ADA) and by Georgia Regional Development Fund (GRDF). Household net income—ADA and GRDF. Jobs created—ADA. Firm income—ADA. Household net income—ADA. Beneficiaries (direct and indirect)—ADA. Grant agreements signed—ADA. Increase in gross revenues of portfolio companies. Increase in portfolio company employees. Increase in wages paid to the portfolio company employees. Portfolio companies. Funds disbursed to the portfolio companies. In November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of additional funds available to the Millennium Challenge Georgia Fund. These funds will be used to complete works in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by the original Compact. The amendment was ratified by the Georgian parliament and entered into force on January 30, 2009. Projects Obligated Objective Cumulative expenditures Country: Vanuatu Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Vanuatu Total Obligation: $65,690,000 Total Quarterly Expenditures 1: $278,588 Transportation Infrastructure Project. $60,096,085 Facilitate transportation to increase tourism and business development. $60,084,330 Program Administration,2 Due Diligence, Monitoring and Evaluation. $5,593,915 ......................................... $5,425,026 .......................... ......................................... $14,097 Obligated Objective Pending subsequent reports 3. Projects emcdonald on DSK5VPTVN1PROD with NOTICES Measures Cumulative expenditures Country: Armenia Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Armenia Irrigated Agriculture Project (Agriculture and Water). VerDate Mar<15>2010 17:34 Nov 30, 2011 $153,969,708 Jkt 226001 Increase agricultural productivity Improve and Quality of Irrigation. PO 00000 Frm 00047 Fmt 4703 Traffic volume (average annual daily traffic)—Efate Ring Road. Traffic Volume (average annual daily traffic)— Santo East Coast Road. Kilometers of road upgraded—Efate Ring Road. Kilometers of roads upgraded—Santo East Coast Road. Percent of MCC contribution disbursed to‘‘adjusted’’ signed contracts of roads works; including approved variations. Measures Total Obligation: $235,650,000 Total Quarterly Expenditures 1: $16,533,503 $154,959,515 Sfmt 4703 Training/technical assistance provided for On-Farm Water Management. Training/technical assistance provided for PostHarvest Processing. Loans Provided. Value of irrigation feasibility and/or detailed design contracts signed. E:\FR\FM\01DEN1.SGM 01DEN1 74818 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Cumulative expenditures Measures Value of irrigation feasibility and/or detailed design contracts disbursed. Number of farmers using better on-farm water management. Number of enterprises using improved techniques. Value of irrigation feasibility and/or detailed design contracts signed. Additional Land irrigated under project. Value of irrigation feasibility and/or detailed design contracts signed. Value of irrigation feasibility and/or detailed design contracts disbursed. Rural Road Rehabilitation Project. $67,100,000 Better access to economic and social infrastructure. $7,620,141 Program Administration,2 Due Diligence, Monitoring and Evaluation. $14,580,292 ......................................... $13,622,512 .......................... ......................................... $3,276 Obligated Objective Pending subsequent reports 3. Projects Average annual daily traffic on Pilot Roads. International roughness index for Pilot Roads. Road Sections Rehabilitated—Pilot Roads. Pilot Roads: Percent of Contracted Roads Works Disbursed of Works Completed. Cumulative expenditures Country: Benin Year: 2011 Quarter 3 Entity to which the assistance is provided: MCA Benin Measures Total Obligation: $307,298,040 Total Quarterly Expenditures: $39,191,455 $17,185,621 Expand Access to Financial Services. $15,062,850 Value of credits granted by Micro-Finance Institutions (at the national level). Value of savings collected by MFI institutions (at the national level). Average portfolio at risk > 90 days of microfinance institutions at the national level. Operational self-sufficiency of MFIs at the national level. Number of institutions receiving grants through the Facility. Number of MFIs inspected by Cellule Supervision Microfinance. Access to Justice Project $21,196,847 Improved Ability of Justice System to Enforce Contracts and Reconcile Claims. $19,637,991 Average time to enforce a contract. Percent of firms reporting confidence in the judicial system. Passage of new legal codes. Average time required for Tribunaux de premiere instance-arbitration centers and courts of first instance (TPI) to reach a final decision on a case. Average time required for Court of Appeals to reach a final decision on a case. Percent of cases resolved in TPI per year. Percent of cases resolved in Court of Appeals per year. Number of Courthouses completed. Average time required to register a business ´ ´ (societe). Average time required to register a business (sole proprietorship). Access to Land Project .... emcdonald on DSK5VPTVN1PROD with NOTICES Access to Financial Services Project. $33,819,736 Strengthen property rights and increase investment in rural and urban land. $30,037,427 Percentage of households investing in targeted urban land parcels. Percentage of households investing in targeted rural land parcels. Average cost required to convert occupancy permit to land title through systematic process. Share of respondents perceiving land security in the Conversions from Occupancy permit to land title (PH–TF) or Rural Land Plan (PFR) areas. Number of preparatory studies completed. VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Cumulative expenditures 74819 Measures Number of Legal and Regulatory Reforms Adopted. Amount of Equipment Purchased. Number of new land titles obtained by transformation of occupancy permit. Number of land certificates issued within MCABenin implementation. Number of PFRs established with MCA-Benin implementation. Number of permanent stations installed. Number of stakeholders trained. Number of communes with new cadastres. Number of operational land market information systems. Access to Markets Project $188,474,717 Program Administration,2 Due Diligence, Monitoring and Evaluation. $46,621,117 ......................................... $40,610,623 .......................... ......................................... $2,387,840 Obligated Objective Pending subsequent reports 3. Projects Improve Access to Markets through Improvements to the Port of Cotonou. $177,053,977 Cumulative expenditures Country: Ghana Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Ghana emcdonald on DSK5VPTVN1PROD with NOTICES Agriculture Project ........... VerDate Mar<15>2010 17:34 Nov 30, 2011 $211,970,412 Jkt 226001 Enhance Profitability of cultivation, services to agriculture and product handling in support of the expansion of commercial agriculture among groups of smallholder farms. PO 00000 Frm 00049 Fmt 4703 Volume of merchandise traffic through the Port Autonome de Cotonou. Bulk ship carriers waiting times at the port. Port design-build contract awarded. Annual number of thefts cases. Average time to clear customs. Port meets—international port security standards (ISPS). Measures Total Obligation: $547,009,000 Total Quarterly Expenditures 1: $60,741,740 $180,083,603 Sfmt 4703 Number of farmers trained in commercial agriculture. Number of agribusinesses assisted. Number of preparatory land studies completed. Legal and regulatory land reforms adopted. Number of landholders reached by public outreach efforts. Number of hectares under production. Number of personnel trained. Number of buildings rehabilitated/constructed. Value of equipment purchased. Feeder roads international roughness index. Feeder roads annualized average daily traffic. Value of signed contracts for feasibility and/or design studies of feeder roads. Percent of contracted design/feasibility studies completed for feeder roads. Value of signed works contracts for feeder roads. Percent of contracted feeder road works disbursed. Value of loans disbursed to clients from agriculture loan fund. Value of signed contracts for feasibility and/or design studies (irrigation). Percent of contracted (design/feasibility) studies complete (irrigation). Value of signed contracts for irrigation works (irrigation). Rural hectares mapped. Percent of contracted irrigation works disbursed. Percent of people aware of their land rights in Pilot Land Registration Areas. Total number of parcels surveyed in the Pilot Land Registration Areas (PLRAs). Volume of products passing through post-harvest treatment. E:\FR\FM\01DEN1.SGM 01DEN1 74820 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Rural Development Project. Objective Cumulative expenditures Measures $74,662,857 Strengthen the rural institutions that provide services complementary to, and supportive of, agricultural and agriculture business development. $68,108,101 Number of students enrolled in schools affected by Education Facilities Sub-Activity. Number of schools rehabilitated. Number of school blocks constructed. Distance to collect water. Time to collect water. Incidence of guinea worm. Number of people affected by Water and Sanitation Facilities Sub-Activity. Number of stand-alone boreholes/wells/nonconventional water systems constructed/rehabilitated. Number of small-town water systems designed and due diligence completed for construction. Number of pipe extension projects designed and due diligence completed for construction. Number of agricultural processing plants in target districts with electricity due to Rural Electrification Sub-Activity. Transportation Project ..... $215,061,187 Reduce the transportation costs affecting agriculture commerce at sub-regional levels. $175,626,685 Trunk roads international roughness index. N1 International roughness index. N1 Annualized average daily traffic. N1 Kilometers of road upgraded. Value of signed contracts for feasibility and/or design studies of the N1. Percent of contracted design/feasibility studies completed of the N1. Value of signed contracts for road works N1, Lot 1. Value of signed contracts for road works N1, Lot 2. Trunk roads annualized average daily traffic. Trunk roads kilometers of roads completed. Percent of contracted design/feasibility studies completed of trunk roads. Percent of contracted trunk road works disbursed. Ferry Activity: Annualized average daily traffic vehicles. Ferry Activity: Annual average daily traffic (passengers). Landing stages rehabilitated. Ferry terminal upgraded. Rehabilitation of Akosombo Floating Dock completed. Rehabilitation of landing stages completed. Percent of contracted road works disbursed: N1, Lot 1. Percent of contracted road works disbursed: N1, Lot 2. Percent of contracted work disbursed: Ferry and floating dock. Percent of contracted work disbursed: Landings and terminals. Value of signed contracts for feasibility and/or design studies of Trunk Roads. Value of signed contracts for trunk roads. Program Administration,2 Due Diligence, Monitoring and Evaluation. $45,314,544 ......................................... $34,444,890 .......................... ......................................... $1,789,604 emcdonald on DSK5VPTVN1PROD with NOTICES Pending subsequent reports 3. VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Cumulative expenditures Objective Country: El Salvador Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA El Salvador 74821 Measures Total Obligation: $460,940,000 Total Quarterly Expenditures 1: $47,034,050 Human Development Project. $99,596,077 Increase human and physical capital of residents of the Northern Zone to take advantage of employment and business opportunities. $62,483,528 Employment rate of graduates of middle technical schools. Graduation rates of middle technical schools. Middle technical schools remodeled and equipped. New Scholarships granted to students of middle technical education. Students of non-formal training. Cost of water. Time collecting water. Number of households with access to improved water supply. Value of contracted water and sanitation works disbursed. Cost of electricity. Households benefiting with a connection to the electricity network. Households benefiting with the installation of isolated solar systems. Kilometers of new electrical lines with construction contracts signed. Population benefiting from strategic infrastructure. Productive Development Project. $71,824,000 Increase production and employment in the Northern Zone. $26,483,228 Number of hectares under production with MCC support. Number of beneficiaries of technical assistance and training—Agriculture. Number of beneficiaries of technical assistance and training—Agribusiness. Value of agricultural loans to farmers/agribusiness. $255,300,099 Reduce travel cost and time within the Northern Zone, with the rest of the country, and within the region. $167,674,621 Productive Development Project. $71,678,455 ......................................... $51,634,102 Program Administration 2 and Control, Monitoring and Evaluation. $34,365,367 ......................................... $21,592,166 Pending Subsequent Report 3. .......................... ......................................... $0 Projects Obligated Objective Connectivity Project ......... Average annual daily traffic. International roughness index. Kilometers of roads rehabilitated. Kilometers of roads with construction initiated. Cumulative expenditures Country: Mali Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Mali Measures Total Obligation: $460,811,162 Total Quarterly Expenditures 1: $40,639,221 emcdonald on DSK5VPTVN1PROD with NOTICES Bamako Senou Airport Improvement Project. $181,252,116 ......................................... $68,641,279 Number of full time jobs at the ADM and firms supporting the airport. Average number of weekly flights (arrivals). Passenger traffic (annual average). Percent works complete. Time required for passenger processing at departures and arrivals. Percent works complete. Security and safety deficiencies corrected at the airport. Alatona Irrigation Project $234,884,675 Increase the agricultural production and productivity in the Alatona zone of the ON. $211,176,652 Main season rice yields. International roughness index (IRI) on the NionoGoma Coura Route. Traffic on the Niono-Diabaly road segment. Traffic on the Diabaly-Goma Coura road segment. Percentage works completed on Niono-Goma Coura road. Hectares under improved irrigation. VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 74822 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Cumulative expenditures Measures Irrigation system efficiency on Alatona Canal. Percentage of contracted irrigation construction works disbursed. Number market gardens allocated in Alatona zones to PAPs or New Settler women. Net primary school enrollment rate (in Alatona zone). Percent of Alatona population with improved access to drinking water. Number of schools available in Alatona. Number of health centers available in the Alatona. Number of affected people who have been compensate. Number of farmers that have applied improved techniques. Hectares under production (rainy season). Hectares under production (dry season). Number of farmers trained. Value of agricultural and rural loans. Number of active MFI clients. Loan recovery rate among Alatona farmers. Industrial Park Project ..... $2,637,472 Terminated ...................... $2,637,472 Administration 2 Program and Control, Monitoring and Evaluation. $42,036,897 ......................................... $28,555,345 Pending Subsequent Report 3. .......................... ......................................... $503,608 Projects Obligated Objective Cumulative expenditures Country: Mongolia Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Mongolia Measures Total Obligation: $284.911,363 Total Quarterly Expenditures 1: $11,658,216 $27,202,618 Increase security and capitalization of land assets held by lowerincome Mongolians, and increased periurban herder productivity and incomes. $8,707,875 Number of legal and regulatory framework or preparatory studies completed (Peri-urban and land plots). Number of legal and regulatory reforms adopted. Number of stakeholders (Peri-urban and land plots). Stakeholders trained (Peri-urban and land plots). Number of buildings built/rehabilitated. Equipment purchased. Rural hectares mapped. Urban Parcels mapped. Leaseholds awarded. Vocational Education Project. $47,355,637 Increase employment and income among unemployed and underemployed Mongolians. $9,895,567 Rate of employment. Vocational school graduates in MCC-supported educational facilities. Percent of active teachers receiving certification training. Technical and vocational education and training (TVET) legislation passed. Health Project .................. emcdonald on DSK5VPTVN1PROD with NOTICES Property Rights Project .... $38,973,258 Increase the adoption of behaviors that reduce non-communicable diseases (NCDIs) among target populations and improved medical treatment and control of NCDIs. $16,198,584 Treatment of diabetes. Treatment of hypertension. Early detection of cervical cancer. Recommendations on road safety interventions available. Roads Project .................. $86,740,123 More efficient transport for trade and access to services. $10,787,073 Kilometers of roads completed. Annual average daily traffic. Travel time. International Roughness Index. Kilometers of roads under design. Percent of contracted roads works disbursed. VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Energy and Environmental Project. Objective $46,966,205 Increased wealth and productivity through greater fuel use efficiency and decreasing health costs from air. Cumulative expenditures $5,440,521 74823 Measures Household savings from decreased fuel costs. Product testing and subsidy setting process adopted. Health costs from air pollution in Ulaanbaatar. Reduced particulate matter concentration. Capacity of wind power generation. Rail Project ...................... $369,560 Terminated ...................... $369,560 Administration 2 $37,303,959 ......................................... $18,211,420 Pending subsequent reports 3. .......................... ......................................... $1,507,137 Program and Control, Monitoring and Evaluation. Terminated. In late 2009, the MCC’s Board of Directors approved the allocation of a portion of the funds originally designated for the rail project to the expansion of the health, vocational education and property right projects from the rail project, and the remaining portion to the addition of a road project. Projects Obligated Objective Cumulative expenditures Country: Mozambique Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Mozambique Measures Total Obligation: $506,924,053 Total Quarterly Expenditures 1: $46,392,402 $207,385,393 Increase access to reliable and quality water and sanitation facilities. $31,007,440 Percent of urban population with improved water sources. Time to get to non-private water source. Percent of urban population with improved sanitation facilities. Percent of rural population with access to improved water sources. Number of private household water connections in urban areas. Number of rural water points constructed. Number of standpipes in urban areas. Five cities: Final detailed design submitted. Three cities: Final detailed design submitted. Road Rehabilitation Project. emcdonald on DSK5VPTVN1PROD with NOTICES Water Supply and Sanitation Project. $176,307,480 Increase access to productive resources and markets. $30,096,768 Kilometers of road rehabilitated. ´ Namialo—Rio Lurio Road—Metoro: Percent of feasibility, design, and supervision contract disbursed. Rio Ligonha-Nampula: Percent of feasibility, design, and supervision contract disbursed. Chimuara-Nicoadala: Percent of feasibility, design, and supervision contract disbursed. ´ Namialo—Rio Lurio: Percent of road construction contract disbursed. ´ Rio Lurio—Metoro: Percent of road construction contract disbursed. Rio Ligonha—Nampula: Percent of road construction contract disbursed. Chimuara-Nicoadala: Percent of road construction contract disbursed. ´ Namialo-Rio Lurio Road: Average annual daily traffic volume. ´ Rio Lurio-Metoro Road: Average annual daily traffic volume. Rio-Ligonha-Nampula Road: Average annual daily traffic volume. Chimuara-Nicoadala Road: Average annual daily traffic volume. ´ Namialo-Rio Lurio Road: Change in International Roughness Index (IRI). ´ Rio Lurio-Metoro Road: Change in International Roughness Index (IRI). Rio-Ligonha-Nampula Road: Change in International Roughness Index (IRI). Chimuara-Nicoadala Road: Change in International Roughness Index (IRI). VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 74824 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Cumulative expenditures Land Tenure Project ........ $39,068,307 Establish efficient, secure land access for households and investors. $14,880,455 Farmer Income Support Project. $18,400,117 Improve coconut productivity and diversification into cash crop. $9,448,958 Program Administration 2 and Control, Monitoring and Evaluation. $65,762,756 ......................................... $23,576,627 Pending Subsequent Report 3. .......................... ......................................... $316,250 Projects Obligated Objective Measures Time to get land usage rights (DUAT), urban. Time to get land usage rights (DUAT), rural. Number of buildings rehabilitated or built. Total value of procured equipment and materials. Number of people trained. Rural hectares mapped in Site Specific Activity. Urban parcels mapped. Rural hectares formalized through Site Specific Activity. Urban parcels formalized. Number of communities delimited and formalized. Number of urban households having land formalized. Number of diseased or dead palm trees cleared. Survival rate of coconut seedlings. Hectares under production. Number of farmers trained in pest and disease control. Number of farmers trained in crop diversification technologies. Income from coconuts and coconut products (estates). Income from coconuts and coconuts products (households). Cumulative expenditures Country: Lesotho Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Lesotho Measures Total Obligation: $362,550,999 Total Quarterly Expenditures 1: $21,820,270 Water Project ................... $164,027,999 Improve the water supply for industrial and domestic needs, and enhance rural livelihoods through improved watershed management. $38,613,758 School days lost due to water borne diseases. Diarrhea notification at health centers. Households with access to improved water supply. Households with access to improved Latrines. Knowledge of good hygiene practices. Households with reliable water services. Enterprises with reliable water services. Households with reliable water services. Volume of treated water. Area re-vegetation. Health Project .................. $122,398,000 Increase access to lifeextending ART and essential health services by providing a sustainable delivery platform. $52,728,860 People with HIV still alive 12 months after initiation of treatment. TB notification (per 100,000 pop.). People living with HIV/AIDS (PLWA) receiving Antiretroviral treatment. Deliveries conducted in the health facilities. Immunization coverage rate. $36,470,318 Stimulate investment by improving access to credit, reducing transaction costs and increasing the participation of women in the economy. $10,927,870 Time required to enforce a contract. Value of commercial cases. Cases referred to Alternative Dispute Resolution (ADR) that are successfully completed. Portfolio of loans. Loan application processing time. Performing loans. Electronic payments—salaries. Electronic payments—pensions. Debit/smart cards issued. Mortgage bonds registered. Value of registered mortgage bonds. Clearing time—Country. Clearing time—Maseru. Land transactions recorded. Land parcels regularized and registered. emcdonald on DSK5VPTVN1PROD with NOTICES Private Sector Development Project. VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 74825 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Cumulative expenditures Measures People trained on gender equality and economic rights. Eligible population with ID cards. Monetary cost to process a lease application. Program Administration 2 and Control, Monitoring and Evaluation. $39,654,681 ......................................... $20,792,438 Pending Subsequent Report 3. .......................... ......................................... $2,850,391 Projects Obligated Objective Cumulative expenditures Country: Morocco Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Morocco Fruit Tree Productivity Project. $301,396,445 Reduce volatility of agricultural production and increase volume of fruit agricultural production. Small Scale Fisheries Project. $120,668,027 Artisan and Fez Medina Project. $111,373,858 Improve quality of fish moving through domestic channels and assure the sustainable use of fishing resources. Increase value added to tourism and artisan sectors. Measures Total Obligation: $697,500,000 Total Quarterly Expenditures 1: $30,903,627 $127,443,546 $6,973,445 Number of farmers trained. Number of agribusinesses assisted. Number of hectares under production. Value of agricultural production. $15,228,752 Landing sites and ports rehabilitated. Mobile fish vendors using new equipment. Fishing boats using new landing sites. Average price of fish at auction markets. Average price of fish at wholesale. Average price of fish at ports. Average revenue of Small and Micro Enterprise (SME) pottery workshops. Construction and rehabilitation of Fez Medina Sites. Tourist receipts in Fez. Training of potters. Enterprise Support Project $33,850,000 Improved survival rate of new SMEs and INDHfunded income generating activities; increased revenue for new SMEs and INDHfunded income generating activities. $11,373,693 Value added per enterprise. Survival rate after two years. Financial Services Project $46,200,000 TBD ................................. $19,647,831 Portfolio at risk at 30 days. Portfolio rate of return. Number of clients of Microcredit. Associations (AMCs) reached branches. Program Administration 2 and Control, Monitoring and Evaluation. $83,981,670 ......................................... .......................... ......................................... $0 Projects Obligated Objective Cumulative expenditures Country: Tanzania Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Tanzania Energy Sector Project ...... emcdonald on DSK5VPTVN1PROD with NOTICES mobile $38,574,848 Pending Subsequent Report 3. through VerDate Mar<15>2010 17:34 Nov 30, 2011 $206,642,428 Jkt 226001 Increase value added to businesses. PO 00000 Frm 00055 Fmt 4703 Measures Total Obligation: $698,135,999 Total Quarterly Expenditures 1: $51,797,681 $81,532,230 Sfmt 4703 Current power customers: Morogoro D1, Morogoro T1, Morogoro T2 & T3, Tanga D1, Tanga T1, Tanga T2 &T3, Mbeya D1, Mbeya T1, Mbeya T2 &T3, Iringa D1, Iringa T1, Iringa T2 & T3, Dodoma D1, Dodoma T1, Dodoma T2 & T3, Mwanza D1, Mwanza T1 and Mwanza T2 & T3. Transmission and distribution sub-station capacity: Morogoro, Tanga, Mbeya, Iringa, Dodoma and Mwanza. Collection efficiency (Morogoro). E:\FR\FM\01DEN1.SGM 01DEN1 74826 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Cumulative expenditures Measures Collection efficiency (Tanga). Collection efficiency (Mbeya). Collection efficiency (Iringa). Collection efficiency (Dodoma). Collection efficiency (Mwanza). Technical and nontechnical losses Technical and nontechnical losses Technical and nontechnical losses Technical and nontechnical losses Technical and nontechnical losses Technical and nontechnical losses (Morogoro). (Tanga). (Mbeya). (Iringa). (Dodoma). (Mwanza). $368,847,428 Increase cash crop revenue and aggregate visitor spending. $148,441,749 International roughness index: Tunduma Sumbawanga. International roughness index: Tanga Horohoro. International roughness index: Namtumbo Songea. International roughness index: Peramiho Mbinga. Annual average daily traffic: Tunduma Sumbawanga. Annual average daily traffic: Tanga Horohoro. Annual average daily traffic: Namtumbo Songea. Annual average daily traffic: Peramiho Mbinga. Kilometers upgraded/completed: Tunduma Sumbawanga. Kilometers upgraded/completed: Tanga Horohoro. Kilometers upgraded/completed: Namtumbo Songea. Kilometers upgraded/completed: Peramiho Mbinga. Percent disbursed on construction works: Tunduma Sumbawanga. Percent disbursed on construction works: Tanga Horohoro. Percent disbursed on construction works: Namtumbo Songea. Percent disbursed on construction works: Peramiho Mbinga. Percent disbursed for feasibility and/or design studies: Tunduma Sumbawanga. Percent disbursed for feasibility and/or design studies: Tanga Horohoro. Percent disbursed for feasibility and/or design studies: Namtumbo Songea. Percent disbursed for feasibility and/or design studies: Peramiho Mbinga. International roughness index: Pemba. Average annual daily traffic: Pemba. Kilometers upgraded/completed: Pemba. Percent disbursed on construction works: Pemba. Signed contracts for construction works (Zanzibar Rural Roads). Percent disbursed on signed contracts for feasibility and/or design studies: Pemba. Passenger arrivals: Mafia Island. Percentage of upgrade complete: Mafia Island. Percent disbursed on construction works: Mafia Island. Water Sector Project ....... emcdonald on DSK5VPTVN1PROD with NOTICES Transport Sector Project .. $65,692,144 Increase investment in human and physical capital and to reduce the prevalence of water-related disease. $20,489,426 Number of domestic customers (Dar es Salaam). Number of domestic customers (Morogoro). Number of non-domestic (commercial and institutional) customers (Dar es Salaam). Number of non-domestic (commercial and institutional) customers (Morogoro). Volume of water produced (Lower Ruvu). Volume of water produced (Morogoro). Percent disbursed on feasibility design update contract Lower Ruvu Plant Expansion. Program Administration 2 and Control, Monitoring and Evaluation. $56,953,999 ......................................... $21,075,173 VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Pending Subsequent Report 3. .......................... ......................................... Projects Obligated Objective Cumulative expenditures Measures $99,857 Cumulative expenditures Country: Burkina Faso Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Burkina Faso Measures Total Obligation: $478,943,569 Total Quarterly Expenditures 1: $12,294,197 $194,130,681 Enhance access to markets through investments in the road network. $4,773,339 Annual average daily traffic: Dedougou-Nouna. Annual average daily traffic: Nouna-Bomborukuy. Annual average daily traffic: Bomborukuy-Mali border. Kilometers of road under works contract. Kilometers of road under design/feasibility contract. Access time to the closest market via paved roads in the Sourou and Comoe (minutes). Kilometers of road under works contract. Kilometers of road under design/feasibility contract. Personnel trained in procurement, contract management and financial systems. Periodic road maintenance coverage rate (for all funds) (percentage). Rural Land Governance Project. $59,934,615 Increase investment in land and rural productivity through improved land tenure security and land management. $13,358,982 Trend in incidence of conflict over land rights reported in the 17 pilot communes (Annual percentage rate of change in the occurrence of conflicts over land rights). Number of legal and regulatory reforms adopted. Number of stakeholders reached by public outreach efforts. Personnel trained. Number of Services Fonciers Ruraux (rural land service offices) installed and functioning. Rural hectares formalized. Number of parcels registered in Ganzourou project area. Agriculture Development Project. $141,910,059 Expand the productive use of land in order to increase the volume and value of agricultural production in project zones. $12,775,149 New irrigated perimeters developed in Di (Hectares). Technical water management core teams (noyaux techniques). installed and operational in the two basins (Sourou and Comoe). Number of farmers trained. Number of agro-sylvo-pastoral groups which receive technical assistance. Number of loans provided by the rural finance facility. Volume of loans intended for agro-sylvo-pastoral borrowers (million CFA). Bright II Schools Project .. emcdonald on DSK5VPTVN1PROD with NOTICES Roads Project .................. 74827 $26,829,669 Increase primary school completion rates. $26,829,669 Number of girls/boys graduating from BRIGHT II primary schools. Percent of girls regularly attending (90% attendance) BRIGHT schools. Number of girls enrolled in the MCC/USAID-supported BRIGHT schools. Number of additional classrooms constructed. Number of teachers trained through 10 provincial workshops. Program Administration 2 and Control, Monitoring and Evaluation. $56,138,545 ......................................... $21,062,644 Pending Subsequent Report 3. .......................... ......................................... $0 VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 74828 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Cumulative expenditures Country: Namibia Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Namibia Measures Total Obligation: $304,477,815 Total Quarterly Expenditures 1: $14,715,638 $144,976,558 Improve the quality of the workforce in Namibia by enhancing the equity and effectiveness of basic. $25,596,708 Percentage of students who are new entrants in grade 5 for 47 schools. Percent of contracted construction works disbursed for 47 schools. Percent disbursed against design/supervisory contracts for 47 schools. Percentage of schools with a learner-textbook ration of 1 to 1 in science, math, and English. Number of textbooks delivered. Number of teachers and managers trained in textbook management, utilization, and storage. Percent disbursed against works contracts for Regional Study Resource Centers Activity (RSRCS). Percent disbursed against design/supervisory contracts for RSRCs. Number of vocational trainees enrolled through the MCA–N grant facility. Value of vocational training grants awarded through the MCA–N grant facility. Percent disbursed against construction, rehabilitation, and equipment contracts for Community Skills and Development Centres (COSDECS). Percent disbursed against design/supervisory contracts for COSDECS. Tourism Project ................ $66,994,941 Grow the Namibian tourism industry with a focus on increasing income to households in communal. $9,724,960 Percent of condition precedents and performance targets met for Etosha National Park (ENP) activity. Number of game translocated with MCA–N support. Number of unique visits on Namibia Tourism Board (NTB) Web site. Number of North American tourism businesses (travel agencies and tour operators) that offer Namibian tours or tour packages. Value of grants issued by the conservancy grant fund (Namibian dollars). Amount of private sector investment secured by MCA–N assisted conservancies (Namibian dollars). Number of annual general meetings with financial reports submitted and benefit distribution plans discussed. Agriculture Project ........... emcdonald on DSK5VPTVN1PROD with NOTICES Education Project ............. $48,601,974 Enhance the health and marketing efficiency of livestock in the NCAs of Namibia and to increase income. $12,374,495 Number of participating households registered in the Community-based Rangeland and Livestock Management (CBRLM) sub-activity. Number of grazing area management implementation agreements established under CBRLM subactivity. Number of community land board members and traditional authority members trained. Number of cattle tagged with radio frequency identification (RFID) tags. Percent disbursed against works contracts for State Veterinary Offices. Percent disbursed against design/supervisory contracts for State Veterinary Offices. Value of grant agreements signed under Livestock Market Efficiency Fund. Number of Indigenous Natural Product (INP) producers selected and mobilized. Value of grant agreements signed under INP Innovation Fund. Program Administration 2 and Control, Monitoring and Evaluation. $43,904,342 ......................................... $12,179,225 VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Objective Pending Subsequent Report 3. .......................... ......................................... Projects Obligated Objective Cumulative expenditures Cumulative expenditures Measures Total Obligation: $262,000,000 Total Quarterly Expenditures 1: $909,150 Road Rehabilitation Project. $132,840,000 Enhance transportation conditions. Transition to High Value Agriculture Project. $101,773,402 Increase incomes in the agricultural sector; Create models for transition to HVA in CIS areas and an enabling environment (legal, financial and market) for replication. $5,934,183 Program Administration 2 and Monitoring and Evaluation. $27,386,598 ......................................... $1,895,243 Pending Subsequent Report 3. .......................... ......................................... $1,164 Projects emcdonald on DSK5VPTVN1PROD with NOTICES Measures $191,727 Country: Moldova Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Moldova Obligated Objective $357,140 Reduced cost for road users. Average annual daily traffic. Road maintenance expenditure. Kilometers of roads completed. Percent of contracted roads works disbursed. Kilometers of roads under works contracts. Resettlement Action Plan (RAP) implemented. Final design. Kilometers of roads under design. Hectares under improved or new irrigation. Centralized irrigation systems rehabilitated. Percent of contracted irrigation feasibility and/or design studies disbursed. Value of irrigation feasibility and/or detailed design contracts signed. Water user associations (WUA) achieving financial sustainability. WUA established under new law. Revised water management policy framework— with long-term water rights defined—established. Contracts of association signed. Irrigation Sector Reform (ISRA) Contractor mobilized. Additionally factor of Access to Agricultural Finance (AAF) investments. Value of agricultural and rural loans. Number of all loans. Number of all loans (female). High value agriculture (HVA) Post-Harvest Credit Facility launched. HVA Post-Harvest Credit Facility Policies and Procedures Manual (PPM) Finalized. Number of farmers that have applied improved techniques (Growing High Value Agriculture Sales [GSH]). Number of farmers that have applied improved techniques (GHS) (female). Number of farmers trained. Number of farmers trained (female). Number of enterprises assisted. Number of enterprises assisted (female). GHS activity launched. Cumulative expenditures Country: Philippines Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Philippines Measures Total Obligation: $430,154,526 Total Quarterly Expenditures 1: $4,786,325 Revenue Administration Reform Project. $51,625,000 To be determined (tbd) ... $7,291 tbd. Community Development Grant. $120,000,000 tbd ................................... $1,072,658 tbd. Roads Project .................. $213,412,526 tbd ................................... $7,539,767 tbd. VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 PO 00000 Frm 00059 Fmt 4703 74829 Sfmt 4703 E:\FR\FM\01DEN1.SGM 01DEN1 74830 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Projects Obligated Cumulative expenditures Objective Program Administration 2 and Monitoring and Evaluation. $45,117,000 ......................................... $2,760,634 Pending Subsequent Report 3. .......................... ......................................... $639,612 Projects Obligated Objective Measures tbd. Cumulative expenditures Country: Senegal Year: 2011 Quarter 4 Entity to which the assistance is provided: MCA Senegal Measures Total Obligation: $540,000,000 Total Quarterly Expenditures 1: $2,102,207 Road Rehabilitation Project. $324,712,499 Expand Access to Markets and Services. $1,909,602 Tons of irrigated rice production. Kilometers of roads rehabilitated on the RN #2. Annual average daily traffic Richard-Toll—Ndioum. Percentage change in travel time on the RN #2. International Roughness Index on the RN #2 (Lower number = smoother road). Kilometers (km) of roads covered by the contract for the studies, the supervision and management of the RN #2. Kilometers of roads rehabilitated on the RN #6. Annual average daily traffic Ziguinchor—Tanaff. Annual average daily traffic Tanaff—Kolda. ´ Annual average daily traffic Kolda—Kounkane. Percentage change in travel time on the RN #6. International Roughness Index on the RN #6 (Lower number = smoother road). Kilometers (km) of roads covered by the contract for the studies, the supervision and management of the RN #6. Irrigation and Water Resources Management Project. $170,008,860 Improve productivity of the agricultural sector. $215,451 Tons of irrigated rice production. Potentially irrigable lands area (Delta and Ngallenka). Hectares under production. Total value of feasibility, design and environmental study contracts signed for the Delta and the Ngallenka (including RAPs). Cropping intensity (hectares under production per year/cultivable hectares). Number of hectares mapped to clarify boundaries and land use types. Percent of new conflicts resolved. Number of people trained on land security tools. Program Administration 2 and Monitoring and Evaluation. $45,278,641 ......................................... $4,761,112 Pending Subsequent Report 3. .......................... ......................................... $186,953 1 Expenditures are the sum of cash outlays and quarterly accruals for work completed but not yet paid or invoiced. administration funds are used to pay items such as salaries, rent, and the cost of office equipment. amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). 619(b) Transfer or Allocation of Funds 2 Program 3 These Amount Description of program or project USAID emcdonald on DSK5VPTVN1PROD with NOTICES U.S. Agency to which Funds were Transferred or Allocated $0 Threshold Program Dated: November 29, 2011. T. Charles Cooper, Vice President, Congressional and Public Affairs, Millennium Challenge Corporation. [FR Doc. 2011–30928 Filed 11–30–11; 8:45 am] BILLING CODE 9211–03–P VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 Notice and request for comments. NATIONAL SCIENCE FOUNDATION ACTION: Notice of Intent To Seek Approval To Establish an Information Collection SUMMARY: AGENCY: PO 00000 National Science Foundation. Frm 00060 Fmt 4703 Sfmt 4703 The National Science Foundation (NSF) is announcing plans to request clearance of this collection. In accordance with the requirement of E:\FR\FM\01DEN1.SGM 01DEN1

Agencies

[Federal Register Volume 76, Number 231 (Thursday, December 1, 2011)]
[Notices]
[Pages 74813-74830]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-30928]


-----------------------------------------------------------------------

MILLENNIUM CHALLENGE CORPORATION

[MCC 11-14]


Notice of Quarterly Report (July 1, 2011-September 30, 2011)

AGENCY: Millennium Challenge Corporation.

SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for 
the quarter July 1, 2011 through September 30, 2011, on assistance 
provided under section 605 of the Millennium Challenge Act of 2003 (22 
U.S.C. 7701 et seq.), as amended (the Act), and on transfers or 
allocations of funds to other federal agencies under section 619(b) of 
the Act. The following report will be made available to the public by 
publication in the Federal Register and on the Internet Web site of the 
MCC (https://www.mcc.gov) in accordance with section 612(b) of the Act.

                                      Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
                                                                           Cumulative
            Projects                 Obligated          Objectives        expenditures           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Madagascar Year: 2011 Quarter 4 Total Obligation: $84,367,700
         Entity to which the assistance is provided: MCA Madagascar Total Quarterly Expenditures \1\: $0
----------------------------------------------------------------------------------------------------------------
Land Tenure Project.............      $29,470,241  Increase Land            $29,304,770  Area secured with land
                                                    Titling and                           certificates or titles
                                                    Security.                             in the Zones.
                                                                                         Legal and regulatory
                                                                                          reforms adopted.
                                                                                         Number of land
                                                                                          documents inventoried
                                                                                          in the Zones and
                                                                                          Antananarivo.
                                                                                         Number of land
                                                                                          documents restored in
                                                                                          the Zones and
                                                                                          Antananarivo.
                                                                                         Number of land
                                                                                          documents digitized in
                                                                                          the Zones and
                                                                                          Antananarivo.
                                  ...............                       ...............  Average time for Land
                                                                                          Services Offices to
                                                                                          issue a duplicate copy
                                                                                          of a title.
                                  ...............                       ...............  Average cost to a user
                                                                                          to obtain a duplicate
                                                                                          copy of a title from
                                                                                          the Land Services
                                                                                          Offices.
                                  ...............                       ...............  Number of land
                                                                                          certificates delivered
                                                                                          in the Zones during
                                                                                          the period.
                                  ...............                       ...............  Number of new guichets
                                                                                          fonciers operating in
                                                                                          the Zones.
                                  ...............                       ...............  The 256 Plan Local
                                                                                          d'Occupation Foncier--
                                                                                          Local Plan of Land
                                                                                          Occupation (PLOFs) are
                                                                                          completed.
----------------------------------------------------------------------------------------------------------------
Financial Sector Reform Project.      $23,535,780  Increase                 $23,535,781  Volume of funds
                                                    Competition in the                    processed annually by
                                                    Financial Sector.                     the national payment
                                                                                          system.
                                                                                         Number of accountants
                                                                                          and financial experts
                                                                                          registered to become
                                                                                          CPA.
                                                                                         Number of Central Bank
                                                                                          branches capable of
                                                                                          accepting auction
                                                                                          tenders.
                                                                                         Outstanding value of
                                                                                          savings accounts from
                                                                                          CEM in the Zones.
                                                                                         Number of Micro-Finance
                                                                                          Institutions (MFIs)
                                                                                          participating in the
                                                                                          Refinancing and
                                                                                          Guarantee funds.
                                  ...............                       ...............  Maximum check clearing
                                                                                          delay.
                                  ...............                       ...............  Network equipment and
                                                                                          integrator.
                                  ...............                       ...............  Real time gross
                                                                                          settlement system
                                                                                          (RTGS).
                                  ...............                       ...............  Telecommunication
                                                                                          facilities.
                                  ...............                       ...............  Retail payment clearing
                                                                                          system.
                                  ...............                       ...............  Number of CEM branches
                                                                                          built in the Zones.
                                  ...............                       ...............  Number of savings
                                                                                          accounts from CEM in
                                                                                          the Zones.

[[Page 74814]]

 
                                  ...............                       ...............  Percent of Micro-
                                                                                          Finance Institution
                                                                                          (MFI) loans recorded
                                                                                          in the Central Bank
                                                                                          database.
----------------------------------------------------------------------------------------------------------------
Agricultural Business Investment      $13,582,550  Improve                  $13,582,534  Number of farmers
 Project.                                           Agricultural                          receiving technical
                                                    Projection                            assistance.
                                                    Technologies and                     Number of marketing
                                                    Market Capacity in                    contracts of ABC
                                                    Rural Areas.                          clients.
                                                                                         Number of farmers
                                                                                          employing technical
                                                                                          assistance.
                                                                                         Value of refinancing
                                                                                          loans and guarantees
                                                                                          issued to
                                                                                          participating MFIs (as
                                                                                          a measure of value of
                                                                                          agricultural and rural
                                                                                          loans).
                                  ...............                       ...............  Number of
                                                                                          Mnist[egrave]re de
                                                                                          l'Agriculture,de
                                                                                          l'Elevage et de la
                                                                                          P[ecirc]che- Ministry
                                                                                          of Agriculture,
                                                                                          Livestock, and Fishing
                                                                                         (MAEP) agents trained
                                                                                          in marketing and
                                                                                          investment promotion.
                                  ...............                       ...............  Number of people
                                                                                          receiving information
                                                                                          from Agricultural
                                                                                          Business Center (ABCs)
                                                                                          on business
                                                                                          opportunities.
----------------------------------------------------------------------------------------------------------------
Program Administration \2\ and        $17,779,126  ...................      $17,779,127  .......................
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \3\..  ...............  ...................       $1,392,568
----------------------------------------------------------------------------------------------------------------
FY2010 Madagascar post-compact disbursement related to final payment of audit expenses.
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective         expenditures           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Honduras Year: 2011 Quarter 4 Total Obligation: $205,000,000
       Entity to which the assistance is provided: MCA Honduras Total Quarterly Expenditures \1\: $79,584
----------------------------------------------------------------------------------------------------------------
Rural Development Project.......      $68,273,380  Increase the             $68,264,510  Number of program
                                                    productivity and                      farmers harvesting
                                                    business skills of                    high-value
                                                    farmers who                           horticulture crops.
                                                    operate small and                    Number of hectares
                                                    medium-size farms                     harvesting high-value
                                                    and their                             horticulture crops.
                                                    employees.                           Number of business
                                                                                          plans prepared by
                                                                                          program farmers with
                                                                                          assistance from the
                                                                                          implementing entity.
                                                                                         Total value of net
                                                                                          sales.
                                                                                         Total number of
                                                                                          recruited farmers
                                                                                          receiving technical
                                                                                          assistance.
                                                                                         Value of loans
                                                                                          disbursed to farmers,
                                                                                          agribusiness, and
                                                                                          other producers and
                                                                                          vendors in the
                                                                                          horticulture industry,
                                                                                          including Program
                                                                                          Farmers, cumulative to
                                                                                          date, Trust Fund
                                                                                          Resources.
                                  ...............                       ...............  Number of loans
                                                                                          disbursed
                                                                                          (disaggregated by
                                                                                          trust fund, leveraged
                                                                                          from trust fund, and
                                                                                          institutions receiving
                                                                                          technical assistance
                                                                                          from ACDI-VOCA).
                                                                                         Number of hectares
                                                                                          under irrigation.
                                                                                         Number of farmers
                                                                                          connected to the
                                                                                          community irrigation
                                                                                          system.
----------------------------------------------------------------------------------------------------------------
Transportation Project..........     $120,591,240  Reduce                  $120,584,457  Freight shipment cost
                                                    transportation                        from Tegucigalpa to
                                                    costs between                         Puerto Cortes.
                                                    targeted                             Average annual daily
                                                    production centers                    traffic volume--CA-5.
                                                    and national,                        International roughness
                                                    regional and                          index (IRI)--CA-5.
                                                    global markets.                      Kilometers of road
                                                                                          upgraded--CA-5.
                                  ...............                       ...............  Percent of contracted
                                                                                          road works disbursed--
                                                                                          CA-5.
                                  ...............                       ...............  Average annual daily
                                                                                          traffic volume--
                                                                                          secondary roads.
                                  ...............                       ...............  International roughness
                                                                                          index (IRI)--secondary
                                                                                          roads.
                                  ...............                       ...............  Kilometers of road
                                                                                          upgraded--secondary
                                                                                          roads.
                                  ...............                       ...............  Average annual daily
                                                                                          traffic volume--rural
                                                                                          roads.
                                  ...............                       ...............  Average speed--Cost per
                                                                                          journey (rural roads).
                                  ...............                       ...............  Kilometers of road
                                                                                          upgraded--rural roads.
                                  ...............                       ...............  Percent disbursed for
                                                                                          contracted studies.

[[Page 74815]]

 
                                  ...............                       ...............  Value of signed
                                                                                          contracts for
                                                                                          feasibility, design,
                                                                                          supervision and
                                                                                          program management
                                                                                          contracts.
                                  ...............                       ...............  Kilometers (km) of
                                                                                          roads under design.
                                  ...............                       ...............  Number of Construction
                                                                                          works and supervision
                                                                                          contracts signed.
                                  ...............                       ...............  Kilometers (km) of
                                                                                          roads under works
                                                                                          contracts.
----------------------------------------------------------------------------------------------------------------
Program Administration,\2\ and        $16,135,380  ...................      $15,166,048  .......................
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \3\..  ...............  ...................               $0
----------------------------------------------------------------------------------------------------------------
The negative quarterly expenditure for Honduras is related to expense accruals. The accruals will be reversed in
 2011 and applied to various projects and activities.
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objectives        expenditures           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Cape Verde Year: 2011 Quarter 4 Total Obligation: $110,078,488
     Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Expenditures \1\: $1,038,897
----------------------------------------------------------------------------------------------------------------
Watershed and Agricultural            $12,011,603  Increase                 $11,602,406  Productivity:
 Support Project.                                   agricultural                          Horticulture, Paul
                                                    production in                         watershed.
                                                    three targeted                       Productivity:
                                                    watershed areas on                    Horticulture, Faja
                                                    three islands.                        watershed.
                                                                                         Productivity:
                                                                                          Horticulture,
                                                                                          Mosteiros watershed.
                                                                                         Number of farmers
                                                                                          adopting drip
                                                                                          irrigation: All
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros).
                                  ...............                       ...............  Hectares under improved
                                                                                          or new irrigation (All
                                                                                          Watersheds Paul, Faja,
                                                                                          and Mosteiros).
                                  ...............                       ...............  Irrigation Works:
                                                                                          Percent contracted
                                                                                          works disbursed. All
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros).
                                  ...............                       ...............  Number of reservoirs
                                                                                          constructed in all
                                                                                          intervention
                                                                                          watersheds (Paul, Faja
                                                                                          and Mosteiros)
                                                                                          (incremental).
                                  ...............                       ...............  Number of farmers
                                                                                          trained.
----------------------------------------------------------------------------------------------------------------
Infrastructure Improvement            $82,630,208  Increase                 $82,542,708  Travel time ratio:
 Project.                                           integration of the                    Percentage of
                                                    internal market                       beneficiary population
                                                    and reduce                            further than 30
                                                    transportation                        minutes from nearest
                                                    costs.                                market.
                                                                                         Kilometers of roads/
                                                                                          bridges completed.
                                                                                         Percent of contracted
                                                                                          road works disbursed
                                                                                          (cumulative).
                                  ...............                       ...............  Port of Praia: Percent
                                                                                          of contracted port
                                                                                          works disbursed
                                                                                          (cumulative).
----------------------------------------------------------------------------------------------------------------
Private Sector Development             $1,920,018  Spur private sector       $1,824,566  Micro-Finance
 Project.                                           development on all                    Institutions portfolio
                                                    islands through                       at risk, adjusted
                                                    increased                             (level).
                                                    investment in the
                                                    priority sectors
                                                    and through
                                                    financial sector
                                                    reform.
----------------------------------------------------------------------------------------------------------------
Program Administration,\2\ and        $13,516,659  ...................      $12,542,777  .......................
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \3\..  ...............  ...................               $0
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective         expenditures           Measures
----------------------------------------------------------------------------------------------------------------
                     Country: Nicaragua Year: 2011 Quarter 4 Total Obligation: $113,500,000
      Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Expenditures \1\: -$296,623
----------------------------------------------------------------------------------------------------------------
Property Regularization Project.       $7,180,454  Increase Investment       $6,694,971  Automated database of
                                                    by strengthening                      registry and cadastre
                                                    property rights.                      installed in the 10
                                                                                          municipalities of
                                                                                          Leon.
                                                                                         Value of land, urban.
                                                                                         Value of land, rural.
                                  ...............                       ...............  Time to conduct a land
                                                                                          transaction.

[[Page 74816]]

 
                                  ...............                       ...............  Number of additional
                                                                                          parcels with a
                                                                                          registered title,
                                                                                          urban.
                                  ...............                       ...............  Number of additional
                                                                                          parcels with a
                                                                                          registered title,
                                                                                          rural.
                                  ...............                       ...............  Area covered by
                                                                                          cadastral mapping.
                                  ...............                       ...............  Cost to conduct a land
                                                                                          transaction.
----------------------------------------------------------------------------------------------------------------
Transportation Project..........      $58,000,000  Reduce                   $56,740,790  Annual Average daily
                                                    transportation                        traffic volume: N1
                                                    costs between Leon                    Section R1.
                                                    and Chinandega and                   Annual Average daily
                                                    national, regional                    traffic volume: N1
                                                    and global markets.                   Section R2.
                                                                                         Annual Average daily
                                                                                          traffic volume: Port
                                                                                          Sandino (S13).
                                                                                         Annual Average daily
                                                                                          traffic volume:
                                                                                          Villanueva--Guasaule
                                                                                          Annual.
                                  ...............                       ...............  Average daily traffic
                                                                                          volume: Somotillo-
                                                                                          Cinco Pinos (S1).
                                  ...............                       ...............  Annual average daily
                                                                                          traffic volume:
                                                                                          Le[oacute]n-Poneloya-
                                                                                          Las Pe[ntilde]itas.
                                  ...............                       ...............  International Roughness
                                                                                          Index: N-I Section R1.
                                  ...............                       ...............  International Roughness
                                                                                          Index: N-I Section R2.
                                  ...............                       ...............  International Roughness
                                                                                          Index: Port Sandino
                                                                                          (S13).
                                  ...............                       ...............  International roughness
                                                                                          index: Villanueva--
                                                                                          Guasaule.
                                  ...............                       ...............  International roughness
                                                                                          index: Somotillo-Cinco
                                                                                          Pinos.
                                  ...............                       ...............  International roughness
                                                                                          index: Le[oacute]n-
                                                                                          Poneloya-Las
                                                                                          Pe[ntilde]itas.
                                  ...............                       ...............  Kilometers of NI
                                                                                          upgraded: R1 and R2
                                                                                          and S13.
                                  ...............                       ...............  Kilometers of NI
                                                                                          upgraded: Villanueva--
                                                                                          Guasaule.
                                  ...............                       ...............  Kilometers of S1 road
                                                                                          upgraded.
                                  ...............                       ...............  Kilometers of S9 road
                                                                                          upgraded.
----------------------------------------------------------------------------------------------------------------
Rural Development Project.......      $32,875,845  Increase the value       $31,360,605  Number of beneficiaries
                                                    added of farms and                    with business plans.
                                                    enterprises in the                   Numbers of manzanas (1
                                                    region.                               manzana = 1.7
                                                                                          hectares), by sector,
                                                                                          harvesting higher-
                                                                                          value crops.
                                  ...............                       ...............  Number of beneficiaries
                                                                                          with business plans
                                                                                          prepared with
                                                                                          assistance of Rural
                                                                                          Business Development
                                                                                          Project.
                                  ...............                       ...............  Number of beneficiaries
                                                                                          implementing forestry
                                                                                          business plans under
                                                                                          Improvement of Water
                                                                                          Supplies Activity.
                                  ...............                       ...............  Number of Manzanas
                                                                                          reforested.
                                  ...............                       ...............  Number of Manzanas with
                                                                                          trees planted.
----------------------------------------------------------------------------------------------------------------
Program Administration,\2\ Due        $15,443,701  ...................      $15,451,111
 Diligence, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \3\..  ...............  ...................       $2,528,880
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective         expenditures           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Georgia Year: 2011 Quarter 4 Total Obligation: $395,300,000
       Entity to which the assistance is provided: MCA Georgia Total Quarterly Expenditures \1\: $815,885
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure              $314,240,000  Key Regional            $309,899,736  Household savings from
 Rehabilitation Project.                            Infrastructure                        Infrastructure
                                                    Rehabilitated.                        Rehabilitation
                                                                                          Activities.
                                                                                         Savings in vehicle
                                                                                          operating costs (VOC).
                                                                                         International roughness
                                                                                          index (IRI).
                                  ...............                       ...............  Annual average daily
                                                                                          traffic (AADT).
                                  ...............                       ...............  Travel Time.
                                  ...............                       ...............  Kilometers of road
                                                                                          completed.
                                  ...............                       ...............  Signed contracts for
                                                                                          feasibility and/or
                                                                                          design studies.
                                  ...............                       ...............  Percent of contracted
                                                                                          studies disbursed.
                                  ...............                       ...............  Kilometers of roads
                                                                                          under design.
                                  ...............                       ...............  Signed contracts for
                                                                                          road works.
                                  ...............                       ...............  Kilometers of roads
                                                                                          under works contracts.
                                  ...............                       ...............  Sites rehabilitated
                                                                                          (phases I, II, III)--
                                                                                          pipeline.
                                  ...............                       ...............  Construction works
                                                                                          completed (phase II)--
                                                                                          pipeline.

[[Page 74817]]

 
                                  ...............                       ...............  Savings in household
                                                                                          expenditures for all
                                                                                          RID subprojects.
                                  ...............                       ...............  Population Served by
                                                                                          all RID subprojects.
                                  ...............                       ...............  RID Subprojects
                                                                                          completed.
                                  ...............                       ...............  Value of Grant
                                                                                          Agreements signed.
                                  ...............                       ...............  Value of project works
                                                                                          and goods contracts
                                                                                          Signed.
                                  ...............                       ...............  Subprojects with works
                                                                                          initiated.
----------------------------------------------------------------------------------------------------------------
Regional Enterprise Development       $52,040,800  Enterprises in           $52,040,800  Jobs Created by
 Project.                                           Regions Developed.                    Agribusiness
                                                                                          Development Activity
                                                                                          (ADA) and by Georgia
                                                                                          Regional Development
                                                                                          Fund (GRDF).
                                                                                         Household net income--
                                                                                          ADA and GRDF.
                                                                                         Jobs created--ADA.
                                                                                         Firm income--ADA.
                                  ...............                       ...............  Household net income--
                                                                                          ADA.
                                  ...............                       ...............  Beneficiaries (direct
                                                                                          and indirect)--ADA.
                                  ...............                       ...............  Grant agreements
                                                                                          signed--ADA.
                                  ...............                       ...............  Increase in gross
                                                                                          revenues of portfolio
                                                                                          companies.
                                  ...............                       ...............  Increase in portfolio
                                                                                          company employees.
                                  ...............                       ...............  Increase in wages paid
                                                                                          to the portfolio
                                                                                          company employees.
                                  ...............                       ...............  Portfolio companies.
                                  ...............                       ...............  Funds disbursed to the
                                                                                          portfolio companies.
----------------------------------------------------------------------------------------------------------------
Program Administration,\2\ Due        $29,019,200  ...................      $25,237,983
 Diligence, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \3\..  ...............  ...................               $0
----------------------------------------------------------------------------------------------------------------
In November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of
 additional funds available to the Millennium Challenge Georgia Fund. These funds will be used to complete works
 in the Roads, Regional Infrastructure Development, and Energy Rehabilitation Projects contemplated by the
 original Compact. The amendment was ratified by the Georgian parliament and entered into force on January 30,
 2009.
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective         expenditures           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Vanuatu Year: 2011 Quarter 4 Total Obligation: $65,690,000
       Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Expenditures \1\: $278,588
----------------------------------------------------------------------------------------------------------------
Transportation Infrastructure         $60,096,085  Facilitate               $60,084,330  Traffic volume (average
 Project.                                           transportation to                     annual daily traffic)--
                                                    increase tourism                      Efate Ring Road.
                                                    and business                         Traffic Volume (average
                                                    development.                          annual daily traffic)--
                                                                                          Santo East Coast Road.
                                                                                         Kilometers of road
                                                                                          upgraded--Efate Ring
                                                                                          Road.
                                  ...............                       ...............  Kilometers of roads
                                                                                          upgraded--Santo East
                                                                                          Coast Road.
                                  ...............                       ...............  Percent of MCC
                                                                                          contribution disbursed
                                                                                          to``adjusted'' signed
                                                                                          contracts of roads
                                                                                          works; including
                                                                                          approved variations.
----------------------------------------------------------------------------------------------------------------
Program Administration,\2\ Due         $5,593,915  ...................       $5,425,026
 Diligence, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \3\..  ...............  ...................          $14,097
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective         expenditures           Measures
----------------------------------------------------------------------------------------------------------------
                      Country: Armenia Year: 2011 Quarter 4 Total Obligation: $235,650,000
      Entity to which the assistance is provided: MCA Armenia Total Quarterly Expenditures \1\: $16,533,503
----------------------------------------------------------------------------------------------------------------
Irrigated Agriculture Project        $153,969,708  Increase                $154,959,515  Training/technical
 (Agriculture and Water).                           agricultural                          assistance provided
                                                    productivity                          for On-Farm Water
                                                    Improve and                           Management.
                                                    Quality of                           Training/technical
                                                    Irrigation.                           assistance provided
                                                                                          for Post-Harvest
                                                                                          Processing.
                                                                                         Loans Provided.
                                                                                         Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts signed.

[[Page 74818]]

 
                                  ...............                       ...............  Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts disbursed.
                                  ...............                       ...............  Number of farmers using
                                                                                          better on-farm water
                                                                                          management.
                                  ...............                       ...............  Number of enterprises
                                                                                          using improved
                                                                                          techniques.
                                  ...............                       ...............  Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts signed.
                                  ...............                       ...............  Additional Land
                                                                                          irrigated under
                                                                                          project.
                                  ...............                       ...............  Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts signed.
                                  ...............                       ...............  Value of irrigation
                                                                                          feasibility and/or
                                                                                          detailed design
                                                                                          contracts disbursed.
----------------------------------------------------------------------------------------------------------------
Rural Road Rehabilitation             $67,100,000  Better access to          $7,620,141  Average annual daily
 Project.                                           economic and                          traffic on Pilot
                                                    social                                Roads.
                                                    infrastructure.                      International roughness
                                                                                          index for Pilot Roads.
                                                                                         Road Sections
                                                                                          Rehabilitated--Pilot
                                                                                          Roads.
                                  ...............                       ...............  Pilot Roads: Percent of
                                                                                          Contracted Roads Works
                                                                                          Disbursed of Works
                                                                                          Completed.
----------------------------------------------------------------------------------------------------------------
Program Administration,\2\ Due        $14,580,292  ...................      $13,622,512
 Diligence, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \3\..  ...............  ...................           $3,276
----------------------------------------------------------------------------------------------------------------


 
                                                                           Cumulative
            Projects                 Obligated          Objective         expenditures           Measures
----------------------------------------------------------------------------------------------------------------
                       Country: Benin Year: 2011 Quarter 3 Total Obligation: $307,298,040
         Entity to which the assistance is provided: MCA Benin Total Quarterly Expenditures: $39,191,455
----------------------------------------------------------------------------------------------------------------
Access to Financial Services          $17,185,621  Expand Access to         $15,062,850  Value of credits
 Project.                                           Financial Services.                   granted by Micro-
                                                                                          Finance Institutions
                                                                                          (at the national
                                                                                          level).
                                                                                         Value of savings
                                                                                          collected by MFI
                                                                                          institutions (at the
                                                                                          national level).
                                                                                         Average portfolio at
                                                                                          risk > 90 days of