FFP Project 104 LLC, Nolin Lake Hydro LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 74781 [2011-30870]
Download as PDF
Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices
the Hugo Lake Dam, as directed by the
Corps.
Applicant Contact: Mr. Vincent
Lamarra, Symbiotics LLC, 975 South
State Highway 89/91, Logan, UT 84321.
(435) 752–2580.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14320–000, P– or P–14323–000) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: November 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–30873 Filed 11–30–11; 8:45 am]
emcdonald on DSK5VPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Mar<15>2010
17:34 Nov 30, 2011
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14319–000; 14324–000]
FFP Project 104 LLC, Nolin Lake Hydro
LLC; Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Competing
Applications
On November 10, 2011, FFP Project
104 LLC (FFP 104), and on November
16, 2011, Nolin Lake Hydro LLC (NL
Hydro) filed preliminary permit
applications, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of a hydropower
project at the U.S. Army Corps of
Engineers’ (Corps) Nolin Lake Dam,
located on the Nolin River in Edmonson
County, Kentucky. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
FFP 104’s Project No. 14319–000
would consist of: (1) A new concrete
bifurcation structure with two slide
gates would be constructed at the end of
the existing outlet conduit; (2) a 9-footdiameter, 475-foot-long steel penstock;
(3) a powerhouse, located on the south
side of the dam, containing one
generating unit with a total capacity of
7.0 megawatts (MW); (4) a 60-foot-long,
140-foot-wide tailrace; and (5) a 4.16/69
KV substation; (6) a 3.5-mile-long, 69
kilo-Volt (kV) transmission line. The
proposed project would have an average
annual generation of 21.0 GWh, and
operate run-of-river utilizing surplus
water from the Nolin Lake Dam, as
directed by the Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston,
MA 02114. (978) 283–2822.
NL Hydro’s Project No. 14324–000
would consist of: (1) A bifurcation
structure; (2) a 10-foot-diameter, 140foot-long steel penstock; (3) a
powerhouse, located on the south side
of the dam, containing one generating
unit with a total capacity of 8.0 MW; (4)
a tailrace; and (5) a 3.1-mile-long, 25 kV
transmission line. The proposed project
would have an average annual
generation of 24.5 GWh, and operate
run-of-river utilizing surplus water from
the Nolin Lake Dam, as directed by the
Corps.
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
74781
Applicant Contact: Mr. Vincent
Lamarra, Symbiotics LLC, 975 South
State Highway 89/91, Logan, UT 84321.
(435) 752–2580.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support. Although
the Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/elibrary.
asp. Enter the docket number (P–14319–
000, P– or P–14324–000) in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
Dated: November 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–30870 Filed 11–30–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–523–000]
Sawgrass Storage LLC; Notice of
Availability of the Environmental
Assessment for the Proposed
Sawgrass Storage Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
E:\FR\FM\01DEN1.SGM
01DEN1
Agencies
[Federal Register Volume 76, Number 231 (Thursday, December 1, 2011)]
[Notices]
[Page 74781]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-30870]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 14319-000; 14324-000]
FFP Project 104 LLC, Nolin Lake Hydro LLC; Notice of Competing
Preliminary Permit Applications Accepted for Filing and Soliciting
Comments, Motions To Intervene, and Competing Applications
On November 10, 2011, FFP Project 104 LLC (FFP 104), and on
November 16, 2011, Nolin Lake Hydro LLC (NL Hydro) filed preliminary
permit applications, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of a hydropower project at the U.S.
Army Corps of Engineers' (Corps) Nolin Lake Dam, located on the Nolin
River in Edmonson County, Kentucky. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
FFP 104's Project No. 14319-000 would consist of: (1) A new
concrete bifurcation structure with two slide gates would be
constructed at the end of the existing outlet conduit; (2) a 9-foot-
diameter, 475-foot-long steel penstock; (3) a powerhouse, located on
the south side of the dam, containing one generating unit with a total
capacity of 7.0 megawatts (MW); (4) a 60-foot-long, 140-foot-wide
tailrace; and (5) a 4.16/69 KV substation; (6) a 3.5-mile-long, 69
kilo-Volt (kV) transmission line. The proposed project would have an
average annual generation of 21.0 GWh, and operate run-of-river
utilizing surplus water from the Nolin Lake Dam, as directed by the
Corps.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822.
NL Hydro's Project No. 14324-000 would consist of: (1) A
bifurcation structure; (2) a 10-foot-diameter, 140-foot-long steel
penstock; (3) a powerhouse, located on the south side of the dam,
containing one generating unit with a total capacity of 8.0 MW; (4) a
tailrace; and (5) a 3.1-mile-long, 25 kV transmission line. The
proposed project would have an average annual generation of 24.5 GWh,
and operate run-of-river utilizing surplus water from the Nolin Lake
Dam, as directed by the Corps.
Applicant Contact: Mr. Vincent Lamarra, Symbiotics LLC, 975 South
State Highway 89/91, Logan, UT 84321. (435) 752-2580.
FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14319-000, P- or P-14324-000) in the docket
number field to access the document. For assistance, contact FERC
Online Support.
Dated: November 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-30870 Filed 11-30-11; 8:45 am]