Apache Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 74783-74784 [2011-30869]

Download as PDF Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices Hydroelectric Project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc. gov or toll-free at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/esubscribenow.htm to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–(866) 208–3676, or for TTY, (202) 502–8659. Please contact Carolyn Templeton by telephone at (202) 502–8785 or by email at carolyn.templeton@ferc.gov if you have any questions. Dated: November 23, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–30872 Filed 11–30–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14325–000] emcdonald on DSK5VPTVN1PROD with NOTICES American River Power II, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On November 10, 2011, American River Power II, LLC (AMP II) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project located at the U.S. Army Corps of Engineers’ (Corps) Olmsted Lock & Dam, located on the Ohio River in Ballard County, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 The proposed project would consist of the following: (1) A intake channel; (2) a powerhouse containing three generating unit with a total capacity of 63.0 megawatts; (3) a tailrace; (4) a 52,783-foot-long, 230.0 kilo-volt transmission line. The proposed project would have an average annual generation of 300.0 gigawatt-hours (GWh), and operate run-of-river utilizing surplus water from the Olmsted Lock & Dam, as directed by the Corps. Applicant Contact: Mr. John P. Henry, American River Power II, LLC, 726 Eldridge Avenue, Collingswood, NJ 08107–1708. (856) 240–0707. FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502– 6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14325–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: November 23, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–30866 Filed 11–30–11; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 74783 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14309–000] Apache Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 26, 2011, Apache Hydro LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a pump storage hydropower project located on Dry Wash, Apache Canyon, in Hudspeth, Culberson, and Reeves Counties, Texas. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed pumped storage project would consist of the following: (1) A 210-foot-high, 1,610-foot-long earth fill dam; (2) a 20-foot-high, 340-foot-long saddle dam; (3) an upper reservoir with a surface area of 134.0 acres and an 11,726 acre-foot storage capacity; (4) a 170-foot-high, 1,270.0-foot-long earth fill dam creating; (5) a lower reservoir with a surface area of 209.0 acres and an 14,139 acre-foot storage capacity; (6) one 32-foot-diameter, 2,713-foot-long penstock; (7) a bifurcation to four 11foot-diameter, and 640-foot-long penstocks; (8) a powerhouse/pumping station containing four pump/generating units with a total generating capacity of 1,271 megawatts; (9) a substation; (10) a 208.0-mile-long, 345 kilo-Volt transmission line to an existing substation near Midland, Texas; and (11) existing roads will be upgraded for access to the project. The proposed project would have an average annual generation of 3,683.0 gigawatt-hours (GWh). Applicant Contact: Mr. Vincent Lamarra, Symbiotics LLC, 975 South State Highway 89/91, Logan, UT 84321. (435) 752–2580. FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502– 6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of E:\FR\FM\01DEN1.SGM 01DEN1 74784 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14309–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: November 23, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–30869 Filed 11–30–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14300–000] emcdonald on DSK5VPTVN1PROD with NOTICES FFP Project 101 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 3, 2011, FFP Project 101 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project at the U.S. Army Corps of Engineers’ (Corps) Oologah Lake Dam, located on the Verdigris River, in Rogers County, Oklahoma. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) A 75-foot by 50-foot intake structure; (2) a 100-foot-long approach channel; (3) two 12-foot-diameter, 700foot-long steel penstocks; (4) a powerhouse, located on the north side of the dam, containing two generating units with a total capacity of 20.0 megawatts; (5) a 230-foot-long, 100-footwide tailrace; (6) a 4.16/12.5 kilo-Volt (kV) substation; and (7) a 250-foot-long, 12.5 kV transmission line. The proposed project would have an average annual generation of 60.0 gigawatt-hours, and operate run-of-river utilizing surplus water from the Oologah Lake Dam, as directed by the Corps. Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp., 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822. FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502– 6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14300–000) in the docket number field to access the PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 document. For assistance, contact FERC Online Support. Dated: November 23, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–30868 Filed 11–30–11; 8:45 am] BILLING CODE 6717–01–P FEDERAL ELECTION COMMISSION Sunshine Act Notice Federal Election Commission. Date and Time: Tuesday, November 29, 2011 at 10 a.m. PLACE: 999 E Street, NW., Washington, DC STATUS: This meeting was closed to the public. ITEMS TO BE DISCUSSED: Compliance matters pursuant to 2 U.S.C. 437g. Audits conducted pursuant to 2 U.S.C. 437g, 438(b), and Title 26, U.S.C. Matters concerning participation in civil actions or proceedings or arbitration. Internal personnel rules and procedures or matters affecting a particular employee. * * * * * PERSON TO CONTACT FOR INFORMATION: Judith Ingram, Press Officer, Telephone: (202) 694–1220. AGENCY: DATES: Shelley E. Garr, Deputy Secretary of the Commission. [FR Doc. 2011–31064 Filed 11–29–11; 4:15 pm] BILLING CODE 6715–01–P FEDERAL MARITIME COMMISSION [Docket No. 11–21] Minto Explorations Ltd. v. Pacific and Arctic Railway and Navigation Company; Notice of Filing of Complaint and Assignment Notice is given that a complaint has been filed with the Federal Maritime Commission (Commission) by Minto Explorations Ltd. (Minto), hereinafter ‘‘Complainant,’’ against Pacific and Arctic Railway and Navigation Company (‘‘PARN’’) or ‘‘Respondent’’. Complainant asserts that it is a Canadian corporation which is a ‘‘wholly owned subsidiary of Capstone Mining Corp.’’ Complainant alleges that Respondent is an Alaska corporation which operates as a marine terminal operator. Complainant alleges that Respondent’s ‘‘dockage tariff, under which the vessels used by Minto pay a E:\FR\FM\01DEN1.SGM 01DEN1

Agencies

[Federal Register Volume 76, Number 231 (Thursday, December 1, 2011)]
[Notices]
[Pages 74783-74784]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-30869]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14309-000]


 Apache Hydro LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On October 26, 2011, Apache Hydro LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of a pump storage hydropower 
project located on Dry Wash, Apache Canyon, in Hudspeth, Culberson, and 
Reeves Counties, Texas. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed pumped storage project would consist of the following: 
(1) A 210-foot-high, 1,610-foot-long earth fill dam; (2) a 20-foot-
high, 340-foot-long saddle dam; (3) an upper reservoir with a surface 
area of 134.0 acres and an 11,726 acre-foot storage capacity; (4) a 
170-foot-high, 1,270.0-foot-long earth fill dam creating; (5) a lower 
reservoir with a surface area of 209.0 acres and an 14,139 acre-foot 
storage capacity; (6) one 32-foot-diameter, 2,713-foot-long penstock; 
(7) a bifurcation to four 11-foot-diameter, and 640-foot-long 
penstocks; (8) a powerhouse/pumping station containing four pump/
generating units with a total generating capacity of 1,271 megawatts; 
(9) a substation; (10) a 208.0-mile-long, 345 kilo-Volt transmission 
line to an existing substation near Midland, Texas; and (11) existing 
roads will be upgraded for access to the project. The proposed project 
would have an average annual generation of 3,683.0 gigawatt-hours 
(GWh).
    Applicant Contact: Mr. Vincent Lamarra, Symbiotics LLC, 975 South 
State Highway 89/91, Logan, UT 84321. (435) 752-2580.
    FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of

[[Page 74784]]

intent must meet the requirements of 18 CFR 4.36. Comments, motions to 
intervene, notices of intent, and competing applications may be filed 
electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at 1-(866) 208-3676, or for 
TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14309-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: November 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-30869 Filed 11-30-11; 8:45 am]
BILLING CODE 6717-01-P