Apache Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 74783-74784 [2011-30869]
Download as PDF
Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices
Hydroelectric Project, with appropriate
environmental measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.
gov or toll-free at (866) 208–3676, or for
TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/esubscribenow.htm to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–(866) 208–3676, or for TTY,
(202) 502–8659.
Please contact Carolyn Templeton by
telephone at (202) 502–8785 or by email
at carolyn.templeton@ferc.gov if you
have any questions.
Dated: November 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–30872 Filed 11–30–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14325–000]
emcdonald on DSK5VPTVN1PROD with NOTICES
American River Power II, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Competing Applications
On November 10, 2011, American
River Power II, LLC (AMP II) filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of a hydropower project
located at the U.S. Army Corps of
Engineers’ (Corps) Olmsted Lock & Dam,
located on the Ohio River in Ballard
County, Kentucky. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
VerDate Mar<15>2010
17:34 Nov 30, 2011
Jkt 226001
The proposed project would consist of
the following: (1) A intake channel; (2)
a powerhouse containing three
generating unit with a total capacity of
63.0 megawatts; (3) a tailrace; (4) a
52,783-foot-long, 230.0 kilo-volt
transmission line. The proposed project
would have an average annual
generation of 300.0 gigawatt-hours
(GWh), and operate run-of-river
utilizing surplus water from the
Olmsted Lock & Dam, as directed by the
Corps.
Applicant Contact: Mr. John P. Henry,
American River Power II, LLC, 726
Eldridge Avenue, Collingswood, NJ
08107–1708. (856) 240–0707.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14325–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: November 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–30866 Filed 11–30–11; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
74783
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14309–000]
Apache Hydro LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On October 26, 2011, Apache Hydro
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
pump storage hydropower project
located on Dry Wash, Apache Canyon,
in Hudspeth, Culberson, and Reeves
Counties, Texas. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed pumped storage project
would consist of the following: (1) A
210-foot-high, 1,610-foot-long earth fill
dam; (2) a 20-foot-high, 340-foot-long
saddle dam; (3) an upper reservoir with
a surface area of 134.0 acres and an
11,726 acre-foot storage capacity; (4) a
170-foot-high, 1,270.0-foot-long earth
fill dam creating; (5) a lower reservoir
with a surface area of 209.0 acres and
an 14,139 acre-foot storage capacity; (6)
one 32-foot-diameter, 2,713-foot-long
penstock; (7) a bifurcation to four 11foot-diameter, and 640-foot-long
penstocks; (8) a powerhouse/pumping
station containing four pump/generating
units with a total generating capacity of
1,271 megawatts; (9) a substation; (10) a
208.0-mile-long, 345 kilo-Volt
transmission line to an existing
substation near Midland, Texas; and
(11) existing roads will be upgraded for
access to the project. The proposed
project would have an average annual
generation of 3,683.0 gigawatt-hours
(GWh).
Applicant Contact: Mr. Vincent
Lamarra, Symbiotics LLC, 975 South
State Highway 89/91, Logan, UT 84321.
(435) 752–2580.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
E:\FR\FM\01DEN1.SGM
01DEN1
74784
Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14309–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: November 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–30869 Filed 11–30–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14300–000]
emcdonald on DSK5VPTVN1PROD with NOTICES
FFP Project 101 LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On October 3, 2011, FFP Project 101
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of a
hydropower project at the U.S. Army
Corps of Engineers’ (Corps) Oologah
Lake Dam, located on the Verdigris
River, in Rogers County, Oklahoma. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
VerDate Mar<15>2010
17:34 Nov 30, 2011
Jkt 226001
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist
of: (1) A 75-foot by 50-foot intake
structure; (2) a 100-foot-long approach
channel; (3) two 12-foot-diameter, 700foot-long steel penstocks; (4) a
powerhouse, located on the north side
of the dam, containing two generating
units with a total capacity of 20.0
megawatts; (5) a 230-foot-long, 100-footwide tailrace; (6) a 4.16/12.5 kilo-Volt
(kV) substation; and (7) a 250-foot-long,
12.5 kV transmission line. The proposed
project would have an average annual
generation of 60.0 gigawatt-hours, and
operate run-of-river utilizing surplus
water from the Oologah Lake Dam, as
directed by the Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston,
MA 02114. (978) 283–2822.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14300–000)
in the docket number field to access the
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
document. For assistance, contact FERC
Online Support.
Dated: November 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–30868 Filed 11–30–11; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL ELECTION COMMISSION
Sunshine Act Notice
Federal Election Commission.
Date and Time: Tuesday,
November 29, 2011 at 10 a.m.
PLACE: 999 E Street, NW., Washington,
DC
STATUS: This meeting was closed to the
public.
ITEMS TO BE DISCUSSED:
Compliance matters pursuant to 2
U.S.C. 437g.
Audits conducted pursuant to 2
U.S.C. 437g, 438(b), and Title 26, U.S.C.
Matters concerning participation in
civil actions or proceedings or
arbitration.
Internal personnel rules and
procedures or matters affecting a
particular employee.
*
*
*
*
*
PERSON TO CONTACT FOR INFORMATION:
Judith Ingram, Press Officer, Telephone:
(202) 694–1220.
AGENCY:
DATES:
Shelley E. Garr,
Deputy Secretary of the Commission.
[FR Doc. 2011–31064 Filed 11–29–11; 4:15 pm]
BILLING CODE 6715–01–P
FEDERAL MARITIME COMMISSION
[Docket No. 11–21]
Minto Explorations Ltd. v. Pacific and
Arctic Railway and Navigation
Company; Notice of Filing of
Complaint and Assignment
Notice is given that a complaint has
been filed with the Federal Maritime
Commission (Commission) by Minto
Explorations Ltd. (Minto), hereinafter
‘‘Complainant,’’ against Pacific and
Arctic Railway and Navigation
Company (‘‘PARN’’) or ‘‘Respondent’’.
Complainant asserts that it is a
Canadian corporation which is a
‘‘wholly owned subsidiary of Capstone
Mining Corp.’’ Complainant alleges that
Respondent is an Alaska corporation
which operates as a marine terminal
operator.
Complainant alleges that
Respondent’s ‘‘dockage tariff, under
which the vessels used by Minto pay a
E:\FR\FM\01DEN1.SGM
01DEN1
Agencies
[Federal Register Volume 76, Number 231 (Thursday, December 1, 2011)]
[Notices]
[Pages 74783-74784]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-30869]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14309-000]
Apache Hydro LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On October 26, 2011, Apache Hydro LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of a pump storage hydropower
project located on Dry Wash, Apache Canyon, in Hudspeth, Culberson, and
Reeves Counties, Texas. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed pumped storage project would consist of the following:
(1) A 210-foot-high, 1,610-foot-long earth fill dam; (2) a 20-foot-
high, 340-foot-long saddle dam; (3) an upper reservoir with a surface
area of 134.0 acres and an 11,726 acre-foot storage capacity; (4) a
170-foot-high, 1,270.0-foot-long earth fill dam creating; (5) a lower
reservoir with a surface area of 209.0 acres and an 14,139 acre-foot
storage capacity; (6) one 32-foot-diameter, 2,713-foot-long penstock;
(7) a bifurcation to four 11-foot-diameter, and 640-foot-long
penstocks; (8) a powerhouse/pumping station containing four pump/
generating units with a total generating capacity of 1,271 megawatts;
(9) a substation; (10) a 208.0-mile-long, 345 kilo-Volt transmission
line to an existing substation near Midland, Texas; and (11) existing
roads will be upgraded for access to the project. The proposed project
would have an average annual generation of 3,683.0 gigawatt-hours
(GWh).
Applicant Contact: Mr. Vincent Lamarra, Symbiotics LLC, 975 South
State Highway 89/91, Logan, UT 84321. (435) 752-2580.
FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of
[[Page 74784]]
intent must meet the requirements of 18 CFR 4.36. Comments, motions to
intervene, notices of intent, and competing applications may be filed
electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at 1-(866) 208-3676, or for
TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14309-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: November 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-30869 Filed 11-30-11; 8:45 am]
BILLING CODE 6717-01-P