FFP Project 101 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 74784 [2011-30868]

Download as PDF 74784 Federal Register / Vol. 76, No. 231 / Thursday, December 1, 2011 / Notices intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14309–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: November 23, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–30869 Filed 11–30–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14300–000] emcdonald on DSK5VPTVN1PROD with NOTICES FFP Project 101 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 3, 2011, FFP Project 101 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project at the U.S. Army Corps of Engineers’ (Corps) Oologah Lake Dam, located on the Verdigris River, in Rogers County, Oklahoma. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary VerDate Mar<15>2010 17:34 Nov 30, 2011 Jkt 226001 permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) A 75-foot by 50-foot intake structure; (2) a 100-foot-long approach channel; (3) two 12-foot-diameter, 700foot-long steel penstocks; (4) a powerhouse, located on the north side of the dam, containing two generating units with a total capacity of 20.0 megawatts; (5) a 230-foot-long, 100-footwide tailrace; (6) a 4.16/12.5 kilo-Volt (kV) substation; and (7) a 250-foot-long, 12.5 kV transmission line. The proposed project would have an average annual generation of 60.0 gigawatt-hours, and operate run-of-river utilizing surplus water from the Oologah Lake Dam, as directed by the Corps. Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp., 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822. FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502– 6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14300–000) in the docket number field to access the PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 document. For assistance, contact FERC Online Support. Dated: November 23, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–30868 Filed 11–30–11; 8:45 am] BILLING CODE 6717–01–P FEDERAL ELECTION COMMISSION Sunshine Act Notice Federal Election Commission. Date and Time: Tuesday, November 29, 2011 at 10 a.m. PLACE: 999 E Street, NW., Washington, DC STATUS: This meeting was closed to the public. ITEMS TO BE DISCUSSED: Compliance matters pursuant to 2 U.S.C. 437g. Audits conducted pursuant to 2 U.S.C. 437g, 438(b), and Title 26, U.S.C. Matters concerning participation in civil actions or proceedings or arbitration. Internal personnel rules and procedures or matters affecting a particular employee. * * * * * PERSON TO CONTACT FOR INFORMATION: Judith Ingram, Press Officer, Telephone: (202) 694–1220. AGENCY: DATES: Shelley E. Garr, Deputy Secretary of the Commission. [FR Doc. 2011–31064 Filed 11–29–11; 4:15 pm] BILLING CODE 6715–01–P FEDERAL MARITIME COMMISSION [Docket No. 11–21] Minto Explorations Ltd. v. Pacific and Arctic Railway and Navigation Company; Notice of Filing of Complaint and Assignment Notice is given that a complaint has been filed with the Federal Maritime Commission (Commission) by Minto Explorations Ltd. (Minto), hereinafter ‘‘Complainant,’’ against Pacific and Arctic Railway and Navigation Company (‘‘PARN’’) or ‘‘Respondent’’. Complainant asserts that it is a Canadian corporation which is a ‘‘wholly owned subsidiary of Capstone Mining Corp.’’ Complainant alleges that Respondent is an Alaska corporation which operates as a marine terminal operator. Complainant alleges that Respondent’s ‘‘dockage tariff, under which the vessels used by Minto pay a E:\FR\FM\01DEN1.SGM 01DEN1

Agencies

[Federal Register Volume 76, Number 231 (Thursday, December 1, 2011)]
[Notices]
[Page 74784]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-30868]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14300-000]


 FFP Project 101 LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On October 3, 2011, FFP Project 101 LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of a hydropower project at 
the U.S. Army Corps of Engineers' (Corps) Oologah Lake Dam, located on 
the Verdigris River, in Rogers County, Oklahoma. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of: (1) A 75-foot by 50-foot 
intake structure; (2) a 100-foot-long approach channel; (3) two 12-
foot-diameter, 700-foot-long steel penstocks; (4) a powerhouse, located 
on the north side of the dam, containing two generating units with a 
total capacity of 20.0 megawatts; (5) a 230-foot-long, 100-foot-wide 
tailrace; (6) a 4.16/12.5 kilo-Volt (kV) substation; and (7) a 250-
foot-long, 12.5 kV transmission line. The proposed project would have 
an average annual generation of 60.0 gigawatt-hours, and operate run-
of-river utilizing surplus water from the Oologah Lake Dam, as directed 
by the Corps.
    Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp., 
239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822.
    FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-(866) 208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14300-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: November 23, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-30868 Filed 11-30-11; 8:45 am]
BILLING CODE 6717-01-P