FFP Project 91 LLC; Riverbank Hydro No. 23 LLC; Lock Hydro Friends Fund III; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 73615-73616 [2011-30681]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 229 / Tuesday, November 29, 2011 / Notices
powerhouse containing two generating
units with a total capacity of 18.0 MW;
(3) a 275-foot-long, 100-foot-wide
tailrace; (4) a 3.0-mile-long, 34.0 kV
transmission line. The proposed project
would have an average annual
generation of 87.0 GWh, and operate
run-of-river utilizing surplus water from
the A. I. Selden Lock & Dam, as directed
by the Corps.
Applicant Contact: Mr. Douglas
Spaulding, Nelson Energy LLC, 8441
Wayzata Blvd., Suite 101, Golden
Valley, MN 55426. (952) 544–8133.
Riverbank’s Project No. 14267–000
would consist of: (1) A forebay; (2) an
intake structure; (3) a powerhouse
containing two generating units with a
total capacity of 10.7 MW; (4) a tailrace
structure; and (5) a 3.0-mile-long, 46 KV
transmission line. The project would
have an estimated average annual
generation of 41.4 gigawatt-hours
(GWh), and operate run-of-river
utilizing surplus water from the A. I.
Selden Lock & Dam, as directed by the
Corps.
Applicant Contact: Mr. Vincent
Lamarra, Riverbank Power USA, 975
South State Highway 89/91, Logan, UT
84321. (435) 752–2580.
FFP 96’s Project No. 14273–000
would consist of: (1) An 380-foot-long,
90-foot-wide approach channel; (2) a
powerhouse, located on the northwest
side of the dam, containing two
generating units with a total capacity of
15.2 MW; (3) a 340-foot-long, 130-footwide tailrace; (4) a 4.16/115 KV
substation; and (5) a 2.9-mile-long, 115
kV transmission line. The proposed
project would have an average annual
generation of 60.7 GWh, and operate
run-of-river utilizing surplus water from
the A. I. Selden Lock & Dam, as directed
by the Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston,
MA 02114. (978) 283–2822.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
VerDate Mar<15>2010
15:20 Nov 28, 2011
Jkt 226001
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14260–000, P–14264–000, 14267–
000, or P–14273–000) in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
73615
FFP 91’s Project No. 14275–000
would consist of: (1) An 360-foot-long,
50-foot-wide approach channel; (2) a
powerhouse, located on the west side of
the dam, containing one generating
units with a total capacity of 6.3 MW;
(3) a 230-foot-long, 55-foot-wide
tailrace; (4) a 4.16/69 KV substation; and
(5) a 0.5-mile-long, 69 KV transmission
line. The proposed project would have
an average annual generation of 25.1
GWh, KV operate run-of-river utilizing
surplus water from Kentucky River Lock
& Dam No. 10, as directed by the Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston,
MA 02114. (978) 283–2822.
Riverbank’s Project No. 14279–000
would consist of: (1) A forebay; (2) an
intake structure; (3) a powerhouse
containing two generating units with a
total capacity of 4.2 MW; (4) a tailrace
structure; and (5) a 0.16-mile-long, 25
KV transmission line. The project would
have an estimated average annual
Dated: November 22, 2011.
generation of 21.0 gigawatt-hours
Kimberly D. Bose,
(GWh), and operate run-of-river
Secretary.
utilizing surplus water from the
Kentucky River Lock & Dam No. 10, as
[FR Doc. 2011–30678 Filed 11–28–11; 8:45 am]
directed by the Corps.
BILLING CODE 6717–01–P
Applicant Contact: Mr. Vincent
Lamarra, Riverbank Power USA, 975
South State Highway 89/91, Logan, UT
DEPARTMENT OF ENERGY
84321. (435) 752–2580.
Federal Energy Regulatory
Lock Hydro’s Project No. 14282–000
Commission
would consist of: (1) Increasing the
existing dam height by four feet to
[Project Nos. 14275–000; 14279–000; 14282–
increase the reservoir level; (2) a
000]
powerhouse constructed in an
abandoned lock containing four
FFP Project 91 LLC; Riverbank Hydro
generating units with a total combined
No. 23 LLC; Lock Hydro Friends Fund
capacity of 4.0 megawatts (MW); (3) a
III; Notice of Competing Preliminary
new switchyard containing a
Permit Applications Accepted for
transformer; and (4) a proposed 0.8Filing and Soliciting Comments,
mile-long, 34.5 kilo-volt (KV)
Motions To Intervene, and Competing
transmission line to an existing power
Applications
line. The proposed project would have
On September 1, 2011, FFP Project 91 an average annual generation of 22.776
LLC (FFP 91), Riverbank Hydro No. 23
GWh, and operate run-of-river utilizing
LLC (Riverbank), and Lock Hydro
surplus water from the Kentucky River
Friends Fund III (Lock Hydro), filed
Lock & Dam No. 10, as directed by the
preliminary permit applications,
Corps.
pursuant to section 4(f) of the Federal
Applicant Contact: Mr. Wayne F.
Power Act, proposing to study the
Krouse, Hydro Green Energy, 5090
feasibility of a hydropower project at the Richmond Avenue #390, Houston, TX
U.S. Army Corps of Engineers’ (Corps)
77056. (877) 556–6566.
Kentucky River Lock & Dam No. 10,
FERC Contact: Michael Spencer,
located on the Kentucky River in Clark
michael.spencer@ferc.gov, (202) 502–
and Madison Counties, Kentucky. The
6093.
Deadline for filing comments, motions
sole purpose of a preliminary permit, if
to intervene, competing applications
issued, is to grant the permit holder
(without notices of intent), or notices of
priority to file a license application
intent to file competing applications: 60
during the permit term. A preliminary
days from the issuance of this notice.
permit does not authorize the permit
Competing applications and notices of
holder to perform any land-disturbing
activities or otherwise enter upon lands intent must meet the requirements of 18
CFR 4.36. Comments, motions to
or waters owned by others without the
intervene, notices of intent, and
owners’ express permission.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
E:\FR\FM\29NON1.SGM
29NON1
73616
Federal Register / Vol. 76, No. 229 / Tuesday, November 29, 2011 / Notices
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
Lock Hydro’s Project No. 14262–000
would consist of: (1) Increase the
existing dam height by four feet to
increase the reservoir level; (2) a
powerhouse constructed in an
abandoned lock, containing four
generating units with a total combined
capacity of 4.0 megawatts (MW); (3) a
new switchyard containing a
transformer; and (4) a proposed 1.2mile-long, 25.0 kilo-volt (kV)
transmission line to an existing power
line. The proposed project would have
an average annual generation of 22.776
GWh, and operate run-of-river utilizing
surplus water from the Kentucky River
Lock & Dam No. 11, as directed by the
Corps.
Applicant Contact: Mr. Wayne F.
Krouse, Hydro Green Energy, 5090
Richmond Avenue #390, Houston, TX
77056. (877) 556–6566.
FFP 92’s Project No. 14276–000
would consist of: (1) An 350-foot-long,
50-foot-wide approach channel; (2) a
powerhouse, located on the south side
Dated: November 22, 2011.
of the dam, containing one generating
Kimberly D. Bose,
units with a total capacity of 4.9 MW;
Secretary.
(3) a 280-foot-long, 70-foot-wide
tailrace; (4) a 4.16/69 KV substation; and
[FR Doc. 2011–30681 Filed 11–28–11; 8:45 am]
(5) a 4.5-mile-long, 69 kV transmission
BILLING CODE 6717–01–P
line. The proposed project would have
an average annual generation of 19.5
DEPARTMENT OF ENERGY
GWh, and operate run-of-river utilizing
surplus water from Kentucky River Lock
Federal Energy Regulatory
& Dam No. 11, as directed by the Corps.
Commission
Applicant Contact: Ms. Ramya
[Project Nos. 14262–000; 14276–000; 14280– Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston,
000]
MA 02114. (978) 283–2822.
Riverbank’s Project No. 14280–000
Lock Hydro Friends Fund VIII, FFP
would consist of: (1) A forebay; (2) an
Project 92 LLC, Riverbank Hydro No.
intake structure; (3) a powerhouse
24 LLC; Notice of Competing
containing two generating units with a
Preliminary Permit Applications
total capacity of 4.6 MW; (4) a tailrace
Accepted for Filing and Soliciting
structure; and (5) a 2.0-mile-long, 25 KV
Comments, Motions To Intervene, and
transmission line. The project would
Competing Applications
have an estimated average annual
On September 1, 2011, Lock Hydro
generation of 21.3 gigawatt-hours
Friends Fund VIII (Lock Hydro), FFP
(GWh), and operate run-of-river
Project 92 LLC (FFP 92), and Riverbank
utilizing surplus water from the
Hydro No. 24 LLC (Riverbank), filed
Kentucky River Lock & Dam No. 11, as
preliminary permit applications,
directed by the Corps.
pursuant to section 4(f) of the Federal
Applicant Contact: Mr. Vincent
Power Act, proposing to study the
Lamarra, Riverbank Power USA, 975
feasibility of a hydropower project at the South State Highway 89/91, Logan, UT
U.S. Army Corps of Engineers’ (Corps)
84321. (435) 752–2580.
Kentucky River Lock & Dam No. 11,
FERC Contact: Michael Spencer,
located on the Kentucky River in Estill
michael.spencer@ferc.gov, (202) 502–
and Madison Counties, Kentucky. The
6093.
Deadline for filing comments, motions
sole purpose of a preliminary permit, if
to intervene, competing applications
issued, is to grant the permit holder
(without notices of intent), or notices of
priority to file a license application
mstockstill on DSK4VPTVN1PROD with NOTICES
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14275–000, 14279–000, or P–14282–
000) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
VerDate Mar<15>2010
15:20 Nov 28, 2011
Jkt 226001
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14262–000, 14276–000, or P–14280–
000) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: November 22, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–30680 Filed 11–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 13214–002; 14274–000]
Lock 12 Hydro Partners; FFP Project
107 LLC; Notice of Competing
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On September 1, 2011, Lock 12 Hydro
Partners (Lock 12), and FFP Project 107
LLC (FFP 107) filed preliminary permit
applications, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of a hydropower
project at the U.S. Army Corps of
Engineers’ (Corps) Kentucky River Lock
and Dam No. 12, located on the
Kentucky River in Estill County,
Kentucky. The sole purpose of a
E:\FR\FM\29NON1.SGM
29NON1
Agencies
[Federal Register Volume 76, Number 229 (Tuesday, November 29, 2011)]
[Notices]
[Pages 73615-73616]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-30681]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 14275-000; 14279-000; 14282-000]
FFP Project 91 LLC; Riverbank Hydro No. 23 LLC; Lock Hydro
Friends Fund III; Notice of Competing Preliminary Permit Applications
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On September 1, 2011, FFP Project 91 LLC (FFP 91), Riverbank Hydro
No. 23 LLC (Riverbank), and Lock Hydro Friends Fund III (Lock Hydro),
filed preliminary permit applications, pursuant to section 4(f) of the
Federal Power Act, proposing to study the feasibility of a hydropower
project at the U.S. Army Corps of Engineers' (Corps) Kentucky River
Lock & Dam No. 10, located on the Kentucky River in Clark and Madison
Counties, Kentucky. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
FFP 91's Project No. 14275-000 would consist of: (1) An 360-foot-
long, 50-foot-wide approach channel; (2) a powerhouse, located on the
west side of the dam, containing one generating units with a total
capacity of 6.3 MW; (3) a 230-foot-long, 55-foot-wide tailrace; (4) a
4.16/69 KV substation; and (5) a 0.5-mile-long, 69 KV transmission
line. The proposed project would have an average annual generation of
25.1 GWh, KV operate run-of-river utilizing surplus water from Kentucky
River Lock & Dam No. 10, as directed by the Corps.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822.
Riverbank's Project No. 14279-000 would consist of: (1) A forebay;
(2) an intake structure; (3) a powerhouse containing two generating
units with a total capacity of 4.2 MW; (4) a tailrace structure; and
(5) a 0.16-mile-long, 25 KV transmission line. The project would have
an estimated average annual generation of 21.0 gigawatt-hours (GWh),
and operate run-of-river utilizing surplus water from the Kentucky
River Lock & Dam No. 10, as directed by the Corps.
Applicant Contact: Mr. Vincent Lamarra, Riverbank Power USA, 975
South State Highway 89/91, Logan, UT 84321. (435) 752-2580.
Lock Hydro's Project No. 14282-000 would consist of: (1) Increasing
the existing dam height by four feet to increase the reservoir level;
(2) a powerhouse constructed in an abandoned lock containing four
generating units with a total combined capacity of 4.0 megawatts (MW);
(3) a new switchyard containing a transformer; and (4) a proposed 0.8-
mile-long, 34.5 kilo-volt (KV) transmission line to an existing power
line. The proposed project would have an average annual generation of
22.776 GWh, and operate run-of-river utilizing surplus water from the
Kentucky River Lock & Dam No. 10, as directed by the Corps.
Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090
Richmond Avenue 390, Houston, TX 77056. (877) 556-6566.
FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
[[Page 73616]]
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14275-000, 14279-000, or P-14282-000) in the
docket number field to access the document. For assistance, contact
FERC Online Support.
Dated: November 22, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-30681 Filed 11-28-11; 8:45 am]