Buy America Waiver Notification, 72026 [2011-29971]
Download as PDF
emcdonald on DSK5VPTVN1PROD with NOTICES
72026
Federal Register / Vol. 76, No. 224 / Monday, November 21, 2011 / Notices
properties to noise exposure contours
depicted on a noise exposure map
submitted under section 47503 of the
Act, it should be noted that the FAA is
not involved in any way in determining
the relative locations of specific
properties with regard to the depicted
noise contours, or in interpreting the
noise exposure maps to resolve
questions concerning, for example,
which properties should be covered by
the provisions of section 47506 of the
Act. These functions are inseparable
from the ultimate land use control and
planning responsibilities of local
government. These local responsibilities
are not changed in any way under Part
150 or through FAA’s review of noise
exposure maps. Therefore, the
responsibility for the detailed
overlaying of noise exposure contours
onto the map depicting properties on
the surface rests exclusively with the
airport operator that submitted those
maps, or with those public agencies and
planning agencies with which
consultation is required under section
47503 of the Act. The FAA has relied on
the certification by the airport operator,
under section 150.21 of part 150, that
the statutorily required consultation has
been accomplished.
The FAA has formally received the
noise compatibility program for W.K.
Kellogg Airport, also effective on
November 1, 2011. Preliminary review
of the submitted material indicates that
it conforms to the requirements for the
submittal of noise compatibility
programs, but that further review will be
necessary prior to approval or
disapproval of the program. The formal
review period, limited by law to a
maximum of 180 days, will be
completed on or before April 28, 2012.
The FAA’s detailed evaluation will be
conducted under the provisions of
section 150.33 of part 150. The primary
considerations in the evaluation process
are whether the proposed measures may
reduce the level of aviation safety,
create an undue burden on interstate or
foreign commerce, or be reasonably
consistent with obtaining the goal of
reducing existing non-compatible land
uses and preventing the introduction of
additional non-compatible land uses.
Interested persons are invited to
comment on the proposed program with
specific reference to these factors. All
comments should be sent to Katherine
S. Delaney at the address under FOR
FURTHER INFORMATION CONTACT. All
relevant comments, other than those
properly addressed to local land use
authorities; will be considered by the
FAA to the extent practicable. Copies of
the noise exposure maps, the FAA’s
evaluation of the maps, and the
VerDate Mar<15>2010
16:00 Nov 18, 2011
Jkt 226001
proposed noise compatibility program
are available for examination at the
following locations:
Federal Aviation Administration,
Detroit Airports District Office, 11677
S. Wayne Road, Ste. 107, Romulus, MI
48174, 8 a.m.–4:30 p.m.
W.K. Kellogg Airport, Mr. Lawrence
Bowron, 15551 S. Airport Road, Battle
Creek, MI 49015, 8 a.m.–4:30 p.m.
Questions may be directed to the
individual named above under the
heading, FOR FURTHER INFORMATION
CONTACT.
Issued in Romulus, Michigan, November 1,
2011.
John L. Mayfield, Jr.,
Manager, Detroit Airports District Office.
[FR Doc. 2011–29899 Filed 11–18–11; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Buy America Waiver Notification
Federal Highway
Administration (FHWA), DOT.
ACTION: Notice.
AGENCY:
This notice provides
information regarding the FHWA’s
finding that a Buy America waiver is
appropriate for an automated battery
switching mechanism for an electric
battery switching station in the State of
California.
DATES: The effective date of the waiver
is November 21, 2011.
FOR FURTHER INFORMATION CONTACT: For
questions about this notice, please
contact Mr. Gerald Yakowenko, FHWA
Office of Program Administration, (202)
366–1562, or via email at
gerald.yakowenko@dot.gov. For legal
questions, please contact Mr. Michael
Harkins, FHWA Office of the Chief
Counsel, (202) 366–4928, or via email at
michael.harkins@dot.gov. Office hours
for the FHWA are from 8 a.m. to
4:30 p.m., e.t., Monday through Friday,
except Federal holidays.
SUPPLEMENTARY INFORMATION:
SUMMARY:
Electronic Access
An electronic copy of this document
may be downloaded from the Federal
Register’s home page at: https://
www.archives.gov and the Government
Printing Office’s database at: https://
www.access.gpo.gov/nara.
iron products (including protective
coatings) that are permanently
incorporated in a Federal-aid
construction project. The regulation also
provides for a waiver of the Buy
America requirements when the
application would be inconsistent with
the public interest or when satisfactory
quality domestic steel and iron products
are not sufficiently available. This
notice provides information regarding
the FHWA’s finding that a Buy America
waiver is appropriate to use a nondomestic automated battery switching
mechanism for an electric battery
switching station in California.
In accordance with Division A,
section 123 of the ‘‘Consolidated
Appropriations Act, 2010’’ (Pub. L. 111–
117), the FHWA published a notice of
intent to issue a waiver on its Web site
for an automated battery switching
mechanism for an electric battery
switching station in California (https://
www.fhwa.dot.gov/construction/
contracts/waivers.cfm?id=58) on May
31st. The FHWA received one comment
in response to the publication, which
opposed the granting of Buy America
waivers in general, but did not identify
any domestic source for this product.
During the 15-day comment period, the
FHWA conducted additional
nationwide review to locate potential
domestic manufacturers for an
automated battery switching mechanism
for an electric battery switching station
in California. Based on all the
information available to the agency, the
FHWA concludes that there are no
domestic manufacturers of an
automated battery switching mechanism
for an electric battery switching station.
In accordance with the provisions of
section 117 of the Safe, Accountable,
Flexible, Efficient Transportation Equity
Act: A Legacy of Users Technical
Corrections Act of 2008 (Pub. L. 110–
244, 122 Stat. 1572), the FHWA is
providing this notice as its finding that
a waiver of Buy America requirements
is appropriate. The FHWA invites
public comment on this finding for an
additional 15 days following the
effective date of the finding. Comments
may be submitted to the FHWA’s Web
site via the link provided to the
automated batter switching mechanism
waiver page noted above.
Authority: 23 U.S.C. 313; Pub. L. 110–161,
23 CFR 635.410.
Background
The FHWA’s Buy America policy in
23 CFR 635.410 requires a domestic
manufacturing process for any steel or
Issued on: November 10, 2011.
Victor M. Mendez,
Administrator.
[FR Doc. 2011–29971 Filed 11–18–11; 8:45 am]
PO 00000
Frm 00095
Fmt 4703
Sfmt 9990
BILLING CODE 4910–22–P
E:\FR\FM\21NON1.SGM
21NON1
Agencies
[Federal Register Volume 76, Number 224 (Monday, November 21, 2011)]
[Notices]
[Page 72026]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29971]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Buy America Waiver Notification
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This notice provides information regarding the FHWA's finding
that a Buy America waiver is appropriate for an automated battery
switching mechanism for an electric battery switching station in the
State of California.
DATES: The effective date of the waiver is November 21, 2011.
FOR FURTHER INFORMATION CONTACT: For questions about this notice,
please contact Mr. Gerald Yakowenko, FHWA Office of Program
Administration, (202) 366-1562, or via email at
gerald.yakowenko@dot.gov. For legal questions, please contact Mr.
Michael Harkins, FHWA Office of the Chief Counsel, (202) 366-4928, or
via email at michael.harkins@dot.gov. Office hours for the FHWA are
from 8 a.m. to 4:30 p.m., e.t., Monday through Friday, except Federal
holidays.
SUPPLEMENTARY INFORMATION:
Electronic Access
An electronic copy of this document may be downloaded from the
Federal Register's home page at: https://www.archives.gov and the
Government Printing Office's database at: https://www.access.gpo.gov/nara.
Background
The FHWA's Buy America policy in 23 CFR 635.410 requires a domestic
manufacturing process for any steel or iron products (including
protective coatings) that are permanently incorporated in a Federal-aid
construction project. The regulation also provides for a waiver of the
Buy America requirements when the application would be inconsistent
with the public interest or when satisfactory quality domestic steel
and iron products are not sufficiently available. This notice provides
information regarding the FHWA's finding that a Buy America waiver is
appropriate to use a non-domestic automated battery switching mechanism
for an electric battery switching station in California.
In accordance with Division A, section 123 of the ``Consolidated
Appropriations Act, 2010'' (Pub. L. 111-117), the FHWA published a
notice of intent to issue a waiver on its Web site for an automated
battery switching mechanism for an electric battery switching station
in California (https://www.fhwa.dot.gov/construction/contracts/waivers.cfm?id=58) on May 31st. The FHWA received one comment in
response to the publication, which opposed the granting of Buy America
waivers in general, but did not identify any domestic source for this
product. During the 15-day comment period, the FHWA conducted
additional nationwide review to locate potential domestic manufacturers
for an automated battery switching mechanism for an electric battery
switching station in California. Based on all the information available
to the agency, the FHWA concludes that there are no domestic
manufacturers of an automated battery switching mechanism for an
electric battery switching station.
In accordance with the provisions of section 117 of the Safe,
Accountable, Flexible, Efficient Transportation Equity Act: A Legacy of
Users Technical Corrections Act of 2008 (Pub. L. 110-244, 122 Stat.
1572), the FHWA is providing this notice as its finding that a waiver
of Buy America requirements is appropriate. The FHWA invites public
comment on this finding for an additional 15 days following the
effective date of the finding. Comments may be submitted to the FHWA's
Web site via the link provided to the automated batter switching
mechanism waiver page noted above.
Authority: 23 U.S.C. 313; Pub. L. 110-161, 23 CFR 635.410.
Issued on: November 10, 2011.
Victor M. Mendez,
Administrator.
[FR Doc. 2011-29971 Filed 11-18-11; 8:45 am]