KC Hydo LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 71960 [2011-29934]

Download as PDF 71960 Federal Register / Vol. 76, No. 224 / Monday, November 21, 2011 / Notices FERC Contact: Michael Watts; phone: (202) 502–6123. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14249–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: November 10, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–29930 Filed 11–18–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission emcdonald on DSK5VPTVN1PROD with NOTICES [Project No. 14244–000] KC Hydo LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 5, 2011, KC Hydo LLC of New Hampshire filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act VerDate Mar<15>2010 16:00 Nov 18, 2011 Jkt 226001 (FPA), proposing to study the feasibility of the Alton Dam Hydropower Project (Alton Dam Project or project) to be located on Merrymeeting River, near the Town of Alton, Belknap County, New Hampshire. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) The existing 190-footlong, 16-foot-high Alton dam, which is owned by the New Hampshire Fish and Game Department and includes a 85foot-long concrete spillway; (2) an existing 720 square acre impoundment; (3) a newly constructed powerhouse; (4) new electrical generating equipment with total hydraulic capacity of 160 cubic feet per second (cfs) and total installed generating capacity of 0.16 megawatts connected to a rehabilitated 60-inch-diameter penstock; (5) rehabilitated intake gate structure and trash racks; (6) a newly excavated 200foot-long tailrace; (7) an approximately 500-foot-long transmission line; and (8) appurtenant facilities. The estimated annual generation of the Alton Dam Project would be 0.650 gigawatt-hours (GWH). Applicant Contact: Ms. Kelly Sackheim, Principal, KC Hydro LLC of New Hampshire, 5096 Cocoa Palm Way, Fair Oaks, CA 95628; phone: (301) 401– 5978. FERC Contact: John Ramer; phone: (202) 502–8969. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866)–208–3676, or for TTY, PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14244–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: November 10, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–29934 Filed 11–18–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14247–000] KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 8, 2011, KC Hydro LLC of New Hampshire filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Nashua Main Street Dam Hydropower Project (Main Street Dam Project or project) to be located on Salmon Brook, near the City of Nashua, Hillsborough County, New Hampshire. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) The existing 75-footlong, 18-foot-high Main Street dam, which is owned by Pennichuck Water Works Company and includes a 31-footlong crested weir spillway and a 54inch-diameter cast iron penstock; (2) the existing Salmon Brook Reservoir having a total storage capacity of 40 acre-feet and a surface area of 10-acres at the spillway elevation of 130 feet mean sea level (msl); (3) connecting new electrical E:\FR\FM\21NON1.SGM 21NON1

Agencies

[Federal Register Volume 76, Number 224 (Monday, November 21, 2011)]
[Notices]
[Page 71960]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29934]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14244-000]


 KC Hydo LLC of New Hampshire; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On August 5, 2011, KC Hydo LLC of New Hampshire filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Alton Dam Hydropower Project (Alton Dam Project or project) to be 
located on Merrymeeting River, near the Town of Alton, Belknap County, 
New Hampshire. The sole purpose of a preliminary permit, if issued, is 
to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) The 
existing 190-foot-long, 16-foot-high Alton dam, which is owned by the 
New Hampshire Fish and Game Department and includes a 85-foot-long 
concrete spillway; (2) an existing 720 square acre impoundment; (3) a 
newly constructed powerhouse; (4) new electrical generating equipment 
with total hydraulic capacity of 160 cubic feet per second (cfs) and 
total installed generating capacity of 0.16 megawatts connected to a 
rehabilitated 60-inch-diameter penstock; (5) rehabilitated intake gate 
structure and trash racks; (6) a newly excavated 200-foot-long 
tailrace; (7) an approximately 500-foot-long transmission line; and (8) 
appurtenant facilities. The estimated annual generation of the Alton 
Dam Project would be 0.650 gigawatt-hours (GWH).
    Applicant Contact: Ms. Kelly Sackheim, Principal, KC Hydro LLC of 
New Hampshire, 5096 Cocoa Palm Way, Fair Oaks, CA 95628; phone: (301) 
401-5978.
    FERC Contact: John Ramer; phone: (202) 502-8969.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-(866)-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14244-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: November 10, 2011.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2011-29934 Filed 11-18-11; 8:45 am]