KC Hydo LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 71960 [2011-29934]
Download as PDF
71960
Federal Register / Vol. 76, No. 224 / Monday, November 21, 2011 / Notices
FERC Contact: Michael Watts; phone:
(202) 502–6123.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14249–000)
in the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: November 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29930 Filed 11–18–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
emcdonald on DSK5VPTVN1PROD with NOTICES
[Project No. 14244–000]
KC Hydo LLC of New Hampshire;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On August 5, 2011, KC Hydo LLC of
New Hampshire filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
VerDate Mar<15>2010
16:00 Nov 18, 2011
Jkt 226001
(FPA), proposing to study the feasibility
of the Alton Dam Hydropower Project
(Alton Dam Project or project) to be
located on Merrymeeting River, near the
Town of Alton, Belknap County, New
Hampshire. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) The existing 190-footlong, 16-foot-high Alton dam, which is
owned by the New Hampshire Fish and
Game Department and includes a 85foot-long concrete spillway; (2) an
existing 720 square acre impoundment;
(3) a newly constructed powerhouse; (4)
new electrical generating equipment
with total hydraulic capacity of 160
cubic feet per second (cfs) and total
installed generating capacity of 0.16
megawatts connected to a rehabilitated
60-inch-diameter penstock; (5)
rehabilitated intake gate structure and
trash racks; (6) a newly excavated 200foot-long tailrace; (7) an approximately
500-foot-long transmission line; and (8)
appurtenant facilities. The estimated
annual generation of the Alton Dam
Project would be 0.650 gigawatt-hours
(GWH).
Applicant Contact: Ms. Kelly
Sackheim, Principal, KC Hydro LLC of
New Hampshire, 5096 Cocoa Palm Way,
Fair Oaks, CA 95628; phone: (301) 401–
5978.
FERC Contact: John Ramer; phone:
(202) 502–8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866)–208–3676, or for TTY,
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14244–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: November 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29934 Filed 11–18–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14247–000]
KC Hydro LLC of New Hampshire;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On August 8, 2011, KC Hydro LLC of
New Hampshire filed an application for
a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Nashua Main Street Dam
Hydropower Project (Main Street Dam
Project or project) to be located on
Salmon Brook, near the City of Nashua,
Hillsborough County, New Hampshire.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) The existing 75-footlong, 18-foot-high Main Street dam,
which is owned by Pennichuck Water
Works Company and includes a 31-footlong crested weir spillway and a 54inch-diameter cast iron penstock; (2) the
existing Salmon Brook Reservoir having
a total storage capacity of 40 acre-feet
and a surface area of 10-acres at the
spillway elevation of 130 feet mean sea
level (msl); (3) connecting new electrical
E:\FR\FM\21NON1.SGM
21NON1
Agencies
[Federal Register Volume 76, Number 224 (Monday, November 21, 2011)]
[Notices]
[Page 71960]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29934]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14244-000]
KC Hydo LLC of New Hampshire; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On August 5, 2011, KC Hydo LLC of New Hampshire filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Alton Dam Hydropower Project (Alton Dam Project or project) to be
located on Merrymeeting River, near the Town of Alton, Belknap County,
New Hampshire. The sole purpose of a preliminary permit, if issued, is
to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following: (1) The
existing 190-foot-long, 16-foot-high Alton dam, which is owned by the
New Hampshire Fish and Game Department and includes a 85-foot-long
concrete spillway; (2) an existing 720 square acre impoundment; (3) a
newly constructed powerhouse; (4) new electrical generating equipment
with total hydraulic capacity of 160 cubic feet per second (cfs) and
total installed generating capacity of 0.16 megawatts connected to a
rehabilitated 60-inch-diameter penstock; (5) rehabilitated intake gate
structure and trash racks; (6) a newly excavated 200-foot-long
tailrace; (7) an approximately 500-foot-long transmission line; and (8)
appurtenant facilities. The estimated annual generation of the Alton
Dam Project would be 0.650 gigawatt-hours (GWH).
Applicant Contact: Ms. Kelly Sackheim, Principal, KC Hydro LLC of
New Hampshire, 5096 Cocoa Palm Way, Fair Oaks, CA 95628; phone: (301)
401-5978.
FERC Contact: John Ramer; phone: (202) 502-8969.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-(866)-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14244-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: November 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-29934 Filed 11-18-11; 8:45 am]
BILLING CODE 6717-01-P