Sunshine Act Meeting Notice, 71013-71014 [2011-29684]

Download as PDF Federal Register / Vol. 76, No. 221 / Wednesday, November 16, 2011 / Notices under a safety-valve approach? Do you have any alternative proposals? Assistant General Counsel, GenOn Energy, Inc. Panelists Commissioner Closing Comments • Patricia A. Hoffman, Assistant Secretary for Electricity & Infrastructure Reliability, U.S. Department of Energy • Gerry W. Cauley, President and Chief Executive Officer, North American Electric Reliability Corporation (NERC) • Nick Akins, CEO of American Electric Power (AEP), on behalf of AEP and EEI • Clair J. Moeller, Vice President Transmission Asset Management, Midwest Independent Transmission System Operator, Inc. (MISO) • State Commission(s) to be Announced • Eric Baker, President and Chief Executive Officer, Wolverine Electric Power Cooperative • Debra Raggio, Vice President, Government and Regulatory Affairs, [FR Doc. 2011–29546 Filed 11–15–11; 8:45 am] 71013 Room 2C, 888 First Street NE., Washington, DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda.* PLACE: Note: Items listed on the agenda may be deleted without further notice. BILLING CODE 6717–01–P CONTACT PERSON FOR MORE INFORMATION: DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice November 10, 2011. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY: Agency Holding Meeting: Federal Energy Regulatory Commission. DATES: Date and Time: November 17, 2011, 10 a.m. Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 975th Meeting REGULAR MEETING [November 17, 2011, 10 a.m.] Item No. Docket No. Company Administrative A–1 ............. A–2 ............. AD02–1–000 ............................................................................................ AD02–7–000 ............................................................................................ A–3 ............. AD07–13–004 .......................................................................................... Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. 2011 Report on Enforcement. Electric E–1 ............. ER11–4574–000 ...................................................................................... E–2 ............. RR11–1–002 ............................................................................................ E–3 E–4 E–5 E–6 ER11–3616–000, ER11–3616–001 ......................................................... RD11–3–000 ............................................................................................ RD11–10–000 .......................................................................................... RC11–1–001 ............................................................................................ RC11–2–001 ............................................................................................ EL11–33–001 .......................................................................................... EL11–58–000 .......................................................................................... ER05–1065–011, OA07–32–008 ............................................................ ER09–1273–002, ER09–1273–004 ......................................................... ER11–2875–001, ER11–2875–002 ......................................................... EL11–20–001 .......................................................................................... ............. ............. ............. ............. E–7 ............. E–8 ............. E–9 ............. E–10 ........... E–11 ........... E–12 ........... E–13 ........... E–14 ........... ER10–1706–001, ER10–1706–002 ......................................................... RR11–5–000 ............................................................................................ ER11–4215–000 ...................................................................................... PJM Interconnection, L.L.C. and Trans-Allegheny Interstate Line Company. Nebraska Public Power District and Southwest Power Pool Regional Entity. California Independent System Operator Corporation. North American Electric Reliability Corporation. North American Electric Reliability Corporation. Cedar Creek Wind Energy, LLC. Milford Wind Corridor Phase I, LLC. Northeast Transmission Development, LLC. Duke Energy Ohio, Inc. Entergy Services, Inc. Westar Energy, Inc. PJM Interconnection, L.L.C. PJM Power Providers Group v. PJM Interconnection, L.L.C. California Independent System Operator Corporation. North American Electric Reliability Corporation. Nevada Power Company. Gas mstockstill on DSK4VPTVN1PROD with NOTICES G–1 ............ RM11–15–000 ......................................................................................... G–2 ............ G–3 ............ G–4 ............ RP12–121–000 ........................................................................................ RP12–122–000 ........................................................................................ RP12–123–000 ........................................................................................ Bidding by Affiliates in Open Seasons for Pipeline Capacity. Bear Creek Storage Company L.L.C. MIGC LLC. ANR Storage Company. Hydro H–1 H–2 H–3 H–4 ............ ............ ............ ............ VerDate Mar<15>2010 RM11–6–000 ........................................................................................... P–2576–151 ............................................................................................ P–2601–015 ............................................................................................ P–11858–004 .......................................................................................... 17:45 Nov 15, 2011 Jkt 226001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 Annual Charges for Use of Government Lands. FirstLight Hydro Generating Company. Duke Energy Carolinas, LLC. The Nevada Hydro Company, Inc. E:\FR\FM\16NON1.SGM 16NON1 71014 Federal Register / Vol. 76, No. 221 / Wednesday, November 16, 2011 / Notices REGULAR MEETING—Continued [November 17, 2011, 10 a.m.] Item No. Docket No. Company Certificates C–1 C–2 C–3 C–4 ............ ............ ............ ............ OMITTED ................................................................................................. CP11–493–000 ........................................................................................ CP11–67–000, CP11–67–001 ................................................................. CP11–36–001 .......................................................................................... A free webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to https://www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or contact Danelle Springer or David Reininger at (703) 993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. Kimberly D. Bose, Secretary. [FR Doc. 2011–29684 Filed 11–14–11; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IN03–9–000] mstockstill on DSK4VPTVN1PROD with NOTICES Idaho Power Company, IDACORP Energy, L.P., IDACORP, Inc.; Notice of Petition Take notice that on September 9, 2011, Idaho Power Company, IDACORP Energy, L.P., and IDACORP, Inc., (collectively, the IDACORP Entities) pursuant to Rule 207(a)(5) of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (FERC), 18 CFR 385.207, and Appendix B, Appendix C, and Appendix E to the Stipulation and Consent Agreement (Settlement Agreement) between VerDate Mar<15>2010 17:45 Nov 15, 2011 Jkt 226001 Dominion Transmission, Inc. Texas Eastern Transmission, LP. Tennessee Gas Pipeline Company. IDACORP Entities and the FERC Office of Enforcement, dated April 25, 2003,1 filed a petition to terminate Appendix B, Appendix C, and Appendix E to the Settlement Agreement. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 30, 2011. 1 Approved in Idaho Power Company, 103 FERC ¶ 61, 182 (2003). PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 Dated: November 9, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–29543 Filed 11–15–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–12–000] ANR Pipeline Company; Notice of Request Under Blanket Authorization Take notice that on November 1, 2011, ANR Pipeline Company (ANR), 717 Texas Street, Houston, Texas 77002, filed in Docket No. CP12–12–000, a prior notice request pursuant to sections 157.205 and 157.214 of the Federal Energy Regulatory Commission’s regulations under the Natural Gas Act for authorization to increase the maximum inventory level of natural gas stored and working storage capacity at its Cold Springs 1 (CS1) storage field located in Kalkaska County, Michigan. Specifically, ANR proposes to increase the maximum inventory level of natural gas stored from 19.2 Bcf to 19.83 Bcf and working storage capacity from 14.7 Bcf to 15.33 Bcf at its CS1 storage field. ANR states the increased capacity will be offered to customers on a firm and/ or interruptible basis, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this Application should be directed to M. Catharine Davis, Vice President U.S. Pipelines Law, ANR Pipeline Company, 717 Texas Street, Suite 2400, Houston, Texas, 77002, or call (832) 320–5509, or E:\FR\FM\16NON1.SGM 16NON1

Agencies

[Federal Register Volume 76, Number 221 (Wednesday, November 16, 2011)]
[Notices]
[Pages 71013-71014]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29684]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

November 10, 2011.
    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:
AGENCY: Agency Holding Meeting: Federal Energy Regulatory Commission.

DATES: Date and Time: November 17, 2011, 10 a.m.

PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.

STATUS: Open.

MATTERS TO BE CONSIDERED: Agenda.*

    Note: Items listed on the agenda may be deleted without further 
notice.


CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400. For a recorded message listing items struck 
from or added to the meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

975th Meeting

                                                 Regular Meeting
                                          [November 17, 2011, 10 a.m.]
----------------------------------------------------------------------------------------------------------------
      Item No.           Docket No.                                      Company
----------------------------------------------------------------------------------------------------------------
                                                 Administrative
----------------------------------------------------------------------------------------------------------------
A-1................  AD02-1-000........  Agency Business Matters.
A-2................  AD02-7-000........  Customer Matters, Reliability, Security and Market Operations.
A-3................  AD07-13-004.......  2011 Report on Enforcement.
----------------------------------------------------------------------------------------------------------------
                                                    Electric
----------------------------------------------------------------------------------------------------------------
E-1................  ER11-4574-000.....  PJM Interconnection, L.L.C. and Trans-Allegheny Interstate Line
                                          Company.
E-2................  RR11-1-002........  Nebraska Public Power District and Southwest Power Pool Regional
                                          Entity.
E-3................  ER11-3616-000,      California Independent System Operator Corporation.
                      ER11-3616-001.
E-4................  RD11-3-000........  North American Electric Reliability Corporation.
E-5................  RD11-10-000.......  North American Electric Reliability Corporation.
E-6................  RC11-1-001........  Cedar Creek Wind Energy, LLC.
                     RC11-2-001........  Milford Wind Corridor Phase I, LLC.
E-7................  EL11-33-001.......  Northeast Transmission Development, LLC.
E-8................  EL11-58-000.......  Duke Energy Ohio, Inc.
E-9................  ER05-1065-011,      Entergy Services, Inc.
                      OA07-32-008.
E-10...............  ER09-1273-002,      Westar Energy, Inc.
                      ER09-1273-004.
E-11...............  ER11-2875-001,      PJM Interconnection, L.L.C.
                      ER11-2875-002.
                     EL11-20-001.......  PJM Power Providers Group v. PJM Interconnection, L.L.C.
E-12...............  ER10-1706-001,      California Independent System Operator Corporation.
                      ER10-1706-002.
E-13...............  RR11-5-000........  North American Electric Reliability Corporation.
E-14...............  ER11-4215-000.....  Nevada Power Company.
----------------------------------------------------------------------------------------------------------------
                                                       Gas
----------------------------------------------------------------------------------------------------------------
G-1................  RM11-15-000.......  Bidding by Affiliates in Open Seasons for Pipeline Capacity.
G-2................  RP12-121-000......  Bear Creek Storage Company L.L.C.
G-3................  RP12-122-000......  MIGC LLC.
G-4................  RP12-123-000......  ANR Storage Company.
----------------------------------------------------------------------------------------------------------------
                                                      Hydro
----------------------------------------------------------------------------------------------------------------
H-1................  RM11-6-000........  Annual Charges for Use of Government Lands.
H-2................  P-2576-151........  FirstLight Hydro Generating Company.
H-3................  P-2601-015........  Duke Energy Carolinas, LLC.
H-4................  P-11858-004.......  The Nevada Hydro Company, Inc.
----------------------------------------------------------------------------------------------------------------

[[Page 71014]]

 
                                                  Certificates
----------------------------------------------------------------------------------------------------------------
C-1................  OMITTED...........  .......................................................................
C-2................  CP11-493-000......  Dominion Transmission, Inc.
C-3................  CP11-67-000, CP11-  Texas Eastern Transmission, LP.
                      67-001.
C-4................  CP11-36-001.......  Tennessee Gas Pipeline Company.
----------------------------------------------------------------------------------------------------------------

    A free webcast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this 
event can do so by navigating to https://www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its webcast. The Capitol Connection provides technical 
support for the free webcasts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://www.CapitolConnection.org or contact 
Danelle Springer or David Reininger at (703) 993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.

Kimberly D. Bose,
Secretary.
[FR Doc. 2011-29684 Filed 11-14-11; 11:15 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.