Natural Currents Energy Services, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications, 71004-71005 [2011-29550]
Download as PDF
71004
Federal Register / Vol. 76, No. 221 / Wednesday, November 16, 2011 / Notices
TABLE 5.1—TEST LOAD SIZES—Continued
Container volume
cu. ft. ≥ <
2.10–2.20
2.20–2.30
2.30–2.40
2.40–2.50
2.50–2.60
2.60–2.70
2.70–2.80
2.80–2.90
2.90–3.00
3.00–3.10
3.10–3.20
3.20–3.30
3.30–3.40
3.40–3.50
3.50–3.60
3.60–3.70
3.70–3.80
3.80–3.90
3.90–4.00
4.00–4.10
4.10–4.20
4.20–4.30
4.30–4.40
4.40–4.50
4.50–4.60
4.60–4.70
4.70–4.80
4.80–4.90
4.90–5.00
5.00–5.10
5.10–5.20
5.20–5.30
5.30–5.40
5.40–5.50
5.50–5.60
5.60–5.70
5.70–5.80
5.80–5.90
5.90–6.00
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
Minimum load
liter ≥ <
lb
59.5–62.3
62.3–65.1
65.1–68.0
68.0–70.8
70.8–73.6
73.6–76.5
76.5–79.3
79.3–82.1
82.1–85.0
85.0–87.8
87.8–90.6
90.6–93.4
93.4–96.3
96.3–99.1
99.1–101.9
101.9–104.8
104.8–107.6
107.6–110.4
110.4–113.3
113.3–116.1
116.1–118.9
118.9–121.8
121.8–124.6
124.6–127.4
127.4–130.3
130.3–133.1
133.1–135.9
135.9–138.8
138.8–141.6
141.6–144.4
144.4–147.2
147.2–150.1
150.1–152.9
152.9–155.7
155.7–158.6
158.6–161.4
161.4–164.2
164.2–167.1
167.1–169.9
Maximum load
kg
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
lb
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
1.36
Average load
kg
8.80
9.20
9.60
10.00
10.50
10.90
11.30
11.70
12.10
12.50
12.90
13.30
13.70
14.10
14.60
15.00
15.40
15.80
16.20
16.60
17.00
17.40
17.80
18.20
18.70
19.10
19.50
19.90
20.30
20.70
21.10
21.50
21.90
22.30
22.80
23.20
23.60
24.00
24.40
lb
3.99
4.17
4.35
4.54
4.76
4.94
5.13
5.31
5.49
5.67
5.85
6.03
6.21
6.40
6.62
6.80
6.99
7.16
7.34
7.53
7.72
7.90
8.09
8.27
8.46
8.65
8.83
9.02
9.20
9.39
9.58
9.76
9.95
10.13
10.32
10.51
10.69
10.88
11.06
kg
5.90
6.10
6.30
6.50
6.75
6.95
7.15
7.35
7.55
7.75
7.95
8.15
8.35
8.55
8.80
9.00
9.20
9.40
9.60
9.80
10.00
10.20
10.40
10.60
10.80
11.00
11.20
11.40
11.60
11.90
12.10
12.30
12.50
12.70
12.90
13.10
13.30
13.50
13.70
2.68
2.77
2.86
2.95
3.06
3.15
3.24
3.33
3.42
3.52
3.61
3.70
3.79
3.88
3.99
4.08
4.17
4.26
4.35
4.45
4.54
4.63
4.72
4.82
4.91
5.00
5.10
5.19
5.28
5.38
5.47
5.56
5.65
5.75
5.84
5.93
6.03
6.12
6.21
Notes:
(1) All test load weights are bone dry weights.
(2) Allowable tolerance on the test load weights are ± 0.10 lbs (0.05 kg).
[FR Doc. 2011–29598 Filed 11–15–11; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
[Project No. 14224–000]
Natural Currents Energy Services,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions to
Intervene, and Competing Applications
On July 14, 2011, Natural Currents
Energy Services, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Margate Tidal
Energy Project, which would be located
on the Beach Thoroughfare in Atlantic
VerDate Mar<15>2010
17:45 Nov 15, 2011
Jkt 226001
County, New Jersey. The proposed
project would not use a dam or
impoundment. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) Installation of 10 to 30 NC Sea
Dragon or Red Hawk tidal turbines at a
rated capacity of 100 kilowatts, (2) an
estimated 200–1,500 meters in length of
additional transmission infrastructure,
and (3) appurtenant facilities. The
project is estimated to have an annual
minimum generation of 3,504,000
kilowatt-hours with the installation of
10 units.
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
Applicant Contact: Mr. Roger Bason,
Natural Currents Energy Services, LLC,
24 Roxanne Boulevard, Highland, New
York 12561, (845) 691–4009.
FERC Contact: Woohee Choi (202)
502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
E:\FR\FM\16NON1.SGM
16NON1
Federal Register / Vol. 76, No. 221 / Wednesday, November 16, 2011 / Notices
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14224–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: November 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29550 Filed 11–15–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1490–052]
mstockstill on DSK4VPTVN1PROD with NOTICES
Brazos River Authority; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Surrender of
License.
b. Project No.: 1490–052.
c. Date Filed: July 20, 2011, and
supplemented October 28, 2011.
d. Applicant: Brazos River Authority.
e. Name of Project: Morris Sheppard
Hydroelectric Project.
f. Location: On the Brazos River, in
Palo Pinto, Young and Stephens
Counties, Texas.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. John A.
Whittaker, IV, Winston & Strawn LLP,
1700 K Street NW., Washington, DC
20006, (202) 282–5766,
jwhittaker@winston.com.
i. FERC Contact: Mr. Jeremy Jessup,
(202) 502–6779, Jeremy.Jessup@ferc.gov.
VerDate Mar<15>2010
17:45 Nov 15, 2011
Jkt 226001
j. Deadline for filing comments,
motions to intervene, and protests, is 30
days from the issuance date of this
notice. All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project number (P–
1490–052) on any comments, motions,
or protests filed.
k. Description of Request: The
applicant proposes to surrender the
license and decommission the
generating facilities for the Morris
Sheppard Project (P–1490). The
applicant states that the project is not
economically feasible due to the repairs
that would be necessary to restore
generation and continued expenses
associated with administering lands
along the shoreline of the reservoir. The
applicant proposes to retain the existing
dam and project reservoir, and install a
control outlet structure for continued
use in water management and supply
operations.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
PO 00000
Frm 00052
Fmt 4703
Sfmt 9990
71005
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) Bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the license
surrender. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29548 Filed 11–15–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\16NON1.SGM
16NON1
Agencies
[Federal Register Volume 76, Number 221 (Wednesday, November 16, 2011)]
[Notices]
[Pages 71004-71005]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29550]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14224-000]
Natural Currents Energy Services, LLC; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
to Intervene, and Competing Applications
On July 14, 2011, Natural Currents Energy Services, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Margate Tidal Energy Project,
which would be located on the Beach Thoroughfare in Atlantic County,
New Jersey. The proposed project would not use a dam or impoundment.
The sole purpose of a preliminary permit, if issued, is to grant the
permit holder priority to file a license application during the permit
term. A preliminary permit does not authorize the permit holder to
perform any land-disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed project would consist of: (1) Installation of 10 to 30
NC Sea Dragon or Red Hawk tidal turbines at a rated capacity of 100
kilowatts, (2) an estimated 200-1,500 meters in length of additional
transmission infrastructure, and (3) appurtenant facilities. The
project is estimated to have an annual minimum generation of 3,504,000
kilowatt-hours with the installation of 10 units.
Applicant Contact: Mr. Roger Bason, Natural Currents Energy
Services, LLC, 24 Roxanne Boulevard, Highland, New York 12561, (845)
691-4009.
FERC Contact: Woohee Choi (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the
[[Page 71005]]
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at 1-(866) 208-3676, or for
TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14224-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: November 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-29550 Filed 11-15-11; 8:45 am]