Reliability Technical Conference Agenda, 71011-71013 [2011-29546]

Download as PDF Federal Register / Vol. 76, No. 221 / Wednesday, November 16, 2011 / Notices 71011 DEPARTMENT OF ENERGY [FR Doc. 2011–29549 Filed 11–15–11; 8:45 am] BILLING CODE 6717–01–C Federal Energy Regulatory Commission Reliability Technical Conference Agenda As announced in the Notice of Technical Conference issued on October 7, 2011, the Commission will hold a technical conference on Tuesday, November 29, 2011, from 1 p.m. to 5 p.m. and Wednesday, November 30, 2011, from 9 a.m. to 4 p.m. to explore the progress made on the priorities for addressing risks to reliability that were identified in earlier Commission technical conferences. The conference also will discuss emerging issues, including processes used by planning authorities and other entities to identify reliability concerns that may arise in the course of compliance with Environmental Protection Agency regulations, and the tools and processes (including tariffs and market rules) available to address any identified reliability concerns. The agenda for this conference is attached. Commission members will participate in this conference. The Commission will be accepting written comments regarding the matters discussed at this technical conference. Any person or entity wishing to submit written comments regarding the matters discussed at the conference should submit such comments in Docket No. AD12–1–000, on or before December 9, 2011. Information on this event will be posted on the Calendar of Events on the Commission’s Web site, https:// VerDate Mar<15>2010 17:45 Nov 15, 2011 Jkt 226001 www.ferc.gov, prior to the event. The conference will be transcribed. Transcripts will be available immediately for a fee from Ace Reporting Company ((202) 347–3700 or 1–(800) 336–6646). A free webcast of this event is also available through https://www.ferc.gov. Anyone with Internet access who desires to listen to this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to the webcast. The Capitol Connection provides technical support for webcasts and offers the option of listening to the meeting via phone-bridge for a fee. If you have any questions, visit https:// www.CapitolConnection.org or call (703) 993–3100. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov or call toll free 1–(866) 208–3372 (voice) or (202) 208–1659 (TTY), or send a FAX to (202) 208–2106 with the required accommodations. For more information about this conference, please contact: Sarah McKinley, Office of External Affairs, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, (202) 502–8368, sarah.mckinley@ferc.gov. PO 00000 Frm 00058 Fmt 4703 Sfmt 4703 Docket No. AD12–1–000 Docket No. RC11–6–000 Docket No. EL11–62–000 Dated: November 9, 2011. Kimberly D. Bose, Secretary. Reliability Technical Conference Commissioner-Led Reliability Technical Conference November 29, 2011 1 p.m.–5 p.m. November 30, 2011 9 a.m.–4 p.m. Agenda November 29, 2011 1 p.m. Commissioners’ Opening Remarks 1:20 p.m. Introductions Commissioner Cheryl LaFleur, Chair 1:25 p.m. Panel I: Identifying Priorities for NERC Activities Presentations: NERC will be invited to provide an update on its priorities as identified in the February 8, 2011 Reliability Technical Conference. Panelists will be invited to express their general views on how NERC’s prioritization tool has been working. Has NERC addressed concerns raised at the February 8, 2011 Reliability Technical Conference. Panelists will be asked to address some or all of the following: a. What are the most critical reliability issues and/or standards development initiatives that needed to be addressed in 2011 and 2012? What is the status of the priorities identified by NERC at the E:\FR\FM\16NON1.SGM 16NON1 EN16NO11.065</GPH> mstockstill on DSK4VPTVN1PROD with NOTICES Reliability Technical Conference .................................................................................................................................. North American Electric Reliability Corporation ........................................................................................................ Public Service Commission of South Carolina and the South Carolina Office of Regulatory Staff ........................ Not consolidated. 71012 Federal Register / Vol. 76, No. 221 / Wednesday, November 16, 2011 / Notices February technical conference? Has NERC’s prioritization tool been useful? b. One of the priorities was improving the compliance and enforcement process. How is that being addressed? c. What are the biggest challenges to addressing these priorities and/or completing these initiatives in an effective and timely manner? What next steps are appropriate to timely and effectively address the priorities discussed? d. How do NERC and reliability standards development teams incorporate in new or re-ordered priorities regarding reliability standards into their work plans? How are emerging issues considered and are any becoming high priorities? mstockstill on DSK4VPTVN1PROD with NOTICES Panelists • Gerry W. Cauley, President and Chief Executive Officer, North American Electric Reliability Corporation (NERC) • Kevin Burke, Chairman, President and CEO, Consolidated Edison Inc., on behalf of Consolidated Edison and the Edison Electric Institute (EEI) • Mike Smith, President and Chief Executive Officer, Georgia Transmission Corporation, on behalf of Georgia Transmission Corp. and the National Rural Electric Association (NRECA) • John A. Anderson, President, Electricity Consumers Resource Council (ELCON) • Allen Mosher, Senior Director of Policy Analysis and Reliability, American Public Power Association (APPA); NERC Standards Committee Chairman • Deborah Le Vine, Director, System Operations, California Independent System Operator Corporation (CAISO) • William J. Gallagher, NERC Member Representatives Committee Chairman; Retired CEO, Vermont Public Power Supply Authority • Peter Fraser, Acting Managing Director of Regulatory Policy, Ontario Energy Board 3:30 p.m. Panel II: Incorporating Lessons Learned into a More Reliable Grid Presentations: Panelists will address how lessons learned are incorporated into NERC priorities. Panelists will be asked to address some or all of the following: a. How do lessons learned from events analysis get disseminated to industry? b. How do NERC’s non-standards processes such as the Industry Alerts, Recommendations, Event Analysis, Essential Actions, Lessons Learned and Compliance Application Notices interact with the reliability standards? To what extent do these processes aid VerDate Mar<15>2010 17:45 Nov 15, 2011 Jkt 226001 in identifying important reliability matters that are not addressed under the existing Reliability Standards? c. Is the alerts process getting the message out on issues of immediate importance? d. How do you gauge whether industry is appropriately implementing NERC alerts or lessons learned from an event analysis? e. Is there a feedback loop into the Reliability Standards development process to determine if there is a gap in the standards? If so, how has that been working? If not, should there be? Panelists • Gerry W. Cauley, President and Chief Executive Officer, North American Electric Reliability Corporation • Thomas J. Galloway, President and Chief Executive Officer, North American Transmission Forum • Tom Burgess, Executive Director, Integrated System Planning and Development, FirstEnergy, on behalf of FirstEnergy and EEI • Scott Helyer, Vice President, Transmission at Tenaska, on behalf of Electric Power Supply Association (EPSA) • State Commission(s) to be Announced • Mary Kipp, Senior Vice President, General Counsel and Chief Compliance Officer, El Paso Electric Commissioner Closing Comments November 30, 2011 9 a.m. Commissioners’ Opening Remarks 9:20 a.m. Introductions Commissioner Cheryl LaFleur, Chair 9: 30 a.m. Remarks: Janet McCabe, Principal Deputy Assistant Administrator for Air and Radiation, U.S. Environmental Protection Agency 9:40 a.m. Panel III: Presentations and Discussion on the Current State of Processes for Identifying UnitSpecific Local or Regional Reliability Issues in Response to Final EPA Regulations Presentations: Panelists will be asked to describe their local and regional processes for identifying unit-specific reliability issues in response to final EPA environmental requirements. Panelists should address the following broad questions in their presentations: a. How should reliability aspects of EPA’s proposed and final regulations be addressed? What local or regional processes are used to plan for emerging issues such as the EPA regulations? How are you incorporating the EPA regulations into this process? b. What have you proposed to the EPA regarding an exemption process? PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 Do you support the exemption process changes identified by the RTOs or other entities in comments to the EPA? Do you have any alternative proposals? c. What market structures and tariff rules are used to address local and regional reliability issues that may arise from generation retirements potentially triggered by EPA regulations? Are any changes to market and tariff rules needed? d. Do you have the right tools to identify any problems that may arise? Are there other process changes that could help address reliability-related requests for exemptions from the EPA regulations? Panelists • Mark Lauby, Vice President and Director of Reliability Assessment and Performance Analysis, North American Electric Reliability Corporation • Michael Kormos, Senior Vice President of Operations, PJM Interconnection, L.L.C. • Carl Monroe, Executive Vice President and Chief Operating Officer, Southwest Power Pool (SPP) • Thomas F. Farrell II, Chairman, President & CEO—Dominion, on behalf of EEI • Kathleen Barron, Vice President, Federal Regulatory Affairs and Policy, Exelon Corporation • Anthony Topazi, Chief Operating Officer, Southern Company • State Commission(s) to be Announced 12 p.m. Lunch 12:45 p.m. Continuation of Panel III Discussion with Commissioners: Open dialogue and questions and answers between Panel 1 and Commissioners. 2:15 p.m. Break 2:30 p.m. Panel IV: Discussion on multijurisdictional processes. Presentations: Panelists will be asked to describe how they coordinate processes such as the state integrated resource planning with their reliability planning and the safety valve proposal. Panelists should address the following broad questions in their presentations: a. What, if any role should the Commission or DOE play in studying replacement generation or other reliability solutions due to retirements? What role does the retail regulator, such as a state public utility commission or municipal authority play in forming your bulk power system reliability plans? b. Do you support the exemption process changes identified by the RTOs or other entities in comments to the EPA? What role can the Commission play in evaluating individual requests E:\FR\FM\16NON1.SGM 16NON1 Federal Register / Vol. 76, No. 221 / Wednesday, November 16, 2011 / Notices under a safety-valve approach? Do you have any alternative proposals? Assistant General Counsel, GenOn Energy, Inc. Panelists Commissioner Closing Comments • Patricia A. Hoffman, Assistant Secretary for Electricity & Infrastructure Reliability, U.S. Department of Energy • Gerry W. Cauley, President and Chief Executive Officer, North American Electric Reliability Corporation (NERC) • Nick Akins, CEO of American Electric Power (AEP), on behalf of AEP and EEI • Clair J. Moeller, Vice President Transmission Asset Management, Midwest Independent Transmission System Operator, Inc. (MISO) • State Commission(s) to be Announced • Eric Baker, President and Chief Executive Officer, Wolverine Electric Power Cooperative • Debra Raggio, Vice President, Government and Regulatory Affairs, [FR Doc. 2011–29546 Filed 11–15–11; 8:45 am] 71013 Room 2C, 888 First Street NE., Washington, DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda.* PLACE: Note: Items listed on the agenda may be deleted without further notice. BILLING CODE 6717–01–P CONTACT PERSON FOR MORE INFORMATION: DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice November 10, 2011. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY: Agency Holding Meeting: Federal Energy Regulatory Commission. DATES: Date and Time: November 17, 2011, 10 a.m. Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 975th Meeting REGULAR MEETING [November 17, 2011, 10 a.m.] Item No. Docket No. Company Administrative A–1 ............. A–2 ............. AD02–1–000 ............................................................................................ AD02–7–000 ............................................................................................ A–3 ............. AD07–13–004 .......................................................................................... Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. 2011 Report on Enforcement. Electric E–1 ............. ER11–4574–000 ...................................................................................... E–2 ............. RR11–1–002 ............................................................................................ E–3 E–4 E–5 E–6 ER11–3616–000, ER11–3616–001 ......................................................... RD11–3–000 ............................................................................................ RD11–10–000 .......................................................................................... RC11–1–001 ............................................................................................ RC11–2–001 ............................................................................................ EL11–33–001 .......................................................................................... EL11–58–000 .......................................................................................... ER05–1065–011, OA07–32–008 ............................................................ ER09–1273–002, ER09–1273–004 ......................................................... ER11–2875–001, ER11–2875–002 ......................................................... EL11–20–001 .......................................................................................... ............. ............. ............. ............. E–7 ............. E–8 ............. E–9 ............. E–10 ........... E–11 ........... E–12 ........... E–13 ........... E–14 ........... ER10–1706–001, ER10–1706–002 ......................................................... RR11–5–000 ............................................................................................ ER11–4215–000 ...................................................................................... PJM Interconnection, L.L.C. and Trans-Allegheny Interstate Line Company. Nebraska Public Power District and Southwest Power Pool Regional Entity. California Independent System Operator Corporation. North American Electric Reliability Corporation. North American Electric Reliability Corporation. Cedar Creek Wind Energy, LLC. Milford Wind Corridor Phase I, LLC. Northeast Transmission Development, LLC. Duke Energy Ohio, Inc. Entergy Services, Inc. Westar Energy, Inc. PJM Interconnection, L.L.C. PJM Power Providers Group v. PJM Interconnection, L.L.C. California Independent System Operator Corporation. North American Electric Reliability Corporation. Nevada Power Company. Gas mstockstill on DSK4VPTVN1PROD with NOTICES G–1 ............ RM11–15–000 ......................................................................................... G–2 ............ G–3 ............ G–4 ............ RP12–121–000 ........................................................................................ RP12–122–000 ........................................................................................ RP12–123–000 ........................................................................................ Bidding by Affiliates in Open Seasons for Pipeline Capacity. Bear Creek Storage Company L.L.C. MIGC LLC. ANR Storage Company. Hydro H–1 H–2 H–3 H–4 ............ ............ ............ ............ VerDate Mar<15>2010 RM11–6–000 ........................................................................................... P–2576–151 ............................................................................................ P–2601–015 ............................................................................................ P–11858–004 .......................................................................................... 17:45 Nov 15, 2011 Jkt 226001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 Annual Charges for Use of Government Lands. FirstLight Hydro Generating Company. Duke Energy Carolinas, LLC. The Nevada Hydro Company, Inc. E:\FR\FM\16NON1.SGM 16NON1

Agencies

[Federal Register Volume 76, Number 221 (Wednesday, November 16, 2011)]
[Notices]
[Pages 71011-71013]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29546]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Reliability Technical Conference Agenda

Reliability Technical Conference.  Docket No. AD12-1-000
North American Electric            Docket No. RC11-6-000
 Reliability Corporation.
Public Service Commission of       Docket No. EL11-62-000
 South Carolina and the South
 Carolina Office of Regulatory
 Staff.
 
Not consolidated.

    As announced in the Notice of Technical Conference issued on 
October 7, 2011, the Commission will hold a technical conference on 
Tuesday, November 29, 2011, from 1 p.m. to 5 p.m. and Wednesday, 
November 30, 2011, from 9 a.m. to 4 p.m. to explore the progress made 
on the priorities for addressing risks to reliability that were 
identified in earlier Commission technical conferences. The conference 
also will discuss emerging issues, including processes used by planning 
authorities and other entities to identify reliability concerns that 
may arise in the course of compliance with Environmental Protection 
Agency regulations, and the tools and processes (including tariffs and 
market rules) available to address any identified reliability concerns. 
The agenda for this conference is attached. Commission members will 
participate in this conference.
    The Commission will be accepting written comments regarding the 
matters discussed at this technical conference. Any person or entity 
wishing to submit written comments regarding the matters discussed at 
the conference should submit such comments in Docket No. AD12-1-000, on 
or before December 9, 2011.
    Information on this event will be posted on the Calendar of Events 
on the Commission's Web site, https://www.ferc.gov, prior to the event. 
The conference will be transcribed. Transcripts will be available 
immediately for a fee from Ace Reporting Company ((202) 347-3700 or 1-
(800) 336-6646). A free webcast of this event is also available through 
https://www.ferc.gov. Anyone with Internet access who desires to listen 
to this event can do so by navigating to www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to the webcast. The Capitol Connection provides technical 
support for webcasts and offers the option of listening to the meeting 
via phone-bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or call (703) 993-3100.
    Commission conferences are accessible under section 508 of the 
Rehabilitation Act of 1973. For accessibility accommodations, please 
send an email to accessibility@ferc.gov or call toll free 1-(866) 208-
3372 (voice) or (202) 208-1659 (TTY), or send a FAX to (202) 208-2106 
with the required accommodations.
    For more information about this conference, please contact:
    Sarah McKinley, Office of External Affairs, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, 
(202) 502-8368, sarah.mckinley@ferc.gov.

    Dated: November 9, 2011.
Kimberly D. Bose,
Secretary.

Reliability Technical Conference

Commissioner-Led Reliability Technical Conference

November 29, 2011
1 p.m.-5 p.m.
November 30, 2011
9 a.m.-4 p.m.
Agenda
November 29, 2011
1 p.m. Commissioners' Opening Remarks
1:20 p.m. Introductions
    Commissioner Cheryl LaFleur, Chair
1:25 p.m. Panel I: Identifying Priorities for NERC Activities

    Presentations: NERC will be invited to provide an update on its 
priorities as identified in the February 8, 2011 Reliability Technical 
Conference. Panelists will be invited to express their general views on 
how NERC's prioritization tool has been working. Has NERC addressed 
concerns raised at the February 8, 2011 Reliability Technical 
Conference. Panelists will be asked to address some or all of the 
following:
    a. What are the most critical reliability issues and/or standards 
development initiatives that needed to be addressed in 2011 and 2012? 
What is the status of the priorities identified by NERC at the

[[Page 71012]]

February technical conference? Has NERC's prioritization tool been 
useful?
    b. One of the priorities was improving the compliance and 
enforcement process. How is that being addressed?
    c. What are the biggest challenges to addressing these priorities 
and/or completing these initiatives in an effective and timely manner? 
What next steps are appropriate to timely and effectively address the 
priorities discussed?
    d. How do NERC and reliability standards development teams 
incorporate in new or re-ordered priorities regarding reliability 
standards into their work plans? How are emerging issues considered and 
are any becoming high priorities?

Panelists

     Gerry W. Cauley, President and Chief Executive Officer, 
North American Electric Reliability Corporation (NERC)
     Kevin Burke, Chairman, President and CEO, Consolidated 
Edison Inc., on behalf of Consolidated Edison and the Edison Electric 
Institute (EEI)
     Mike Smith, President and Chief Executive Officer, Georgia 
Transmission Corporation, on behalf of Georgia Transmission Corp. and 
the National Rural Electric Association (NRECA)
     John A. Anderson, President, Electricity Consumers 
Resource Council (ELCON)
     Allen Mosher, Senior Director of Policy Analysis and 
Reliability, American Public Power Association (APPA); NERC Standards 
Committee Chairman
     Deborah Le Vine, Director, System Operations, California 
Independent System Operator Corporation (CAISO)
     William J. Gallagher, NERC Member Representatives 
Committee Chairman; Retired CEO, Vermont Public Power Supply Authority
     Peter Fraser, Acting Managing Director of Regulatory 
Policy, Ontario Energy Board

3:30 p.m. Panel II: Incorporating Lessons Learned into a More Reliable 
Grid

    Presentations: Panelists will address how lessons learned are 
incorporated into NERC priorities. Panelists will be asked to address 
some or all of the following:
    a. How do lessons learned from events analysis get disseminated to 
industry?
    b. How do NERC's non-standards processes such as the Industry 
Alerts, Recommendations, Event Analysis, Essential Actions, Lessons 
Learned and Compliance Application Notices interact with the 
reliability standards? To what extent do these processes aid in 
identifying important reliability matters that are not addressed under 
the existing Reliability Standards?
    c. Is the alerts process getting the message out on issues of 
immediate importance?
    d. How do you gauge whether industry is appropriately implementing 
NERC alerts or lessons learned from an event analysis?
    e. Is there a feedback loop into the Reliability Standards 
development process to determine if there is a gap in the standards? If 
so, how has that been working? If not, should there be?

Panelists

     Gerry W. Cauley, President and Chief Executive Officer, 
North American Electric Reliability Corporation
     Thomas J. Galloway, President and Chief Executive Officer, 
North American Transmission Forum
     Tom Burgess, Executive Director, Integrated System 
Planning and Development, FirstEnergy, on behalf of FirstEnergy and EEI
     Scott Helyer, Vice President, Transmission at Tenaska, on 
behalf of Electric Power Supply Association (EPSA)
     State Commission(s) to be Announced
     Mary Kipp, Senior Vice President, General Counsel and 
Chief Compliance Officer, El Paso Electric

Commissioner Closing Comments

November 30, 2011
9 a.m. Commissioners' Opening Remarks
9:20 a.m. Introductions
    Commissioner Cheryl LaFleur, Chair
9: 30 a.m. Remarks: Janet McCabe, Principal Deputy Assistant 
Administrator for Air and Radiation, U.S. Environmental Protection 
Agency
9:40 a.m. Panel III: Presentations and Discussion on the Current State 
of Processes for Identifying Unit-Specific Local or Regional 
Reliability Issues in Response to Final EPA Regulations

    Presentations: Panelists will be asked to describe their local and 
regional processes for identifying unit-specific reliability issues in 
response to final EPA environmental requirements. Panelists should 
address the following broad questions in their presentations:
    a. How should reliability aspects of EPA's proposed and final 
regulations be addressed? What local or regional processes are used to 
plan for emerging issues such as the EPA regulations? How are you 
incorporating the EPA regulations into this process?
    b. What have you proposed to the EPA regarding an exemption 
process? Do you support the exemption process changes identified by the 
RTOs or other entities in comments to the EPA? Do you have any 
alternative proposals?
    c. What market structures and tariff rules are used to address 
local and regional reliability issues that may arise from generation 
retirements potentially triggered by EPA regulations? Are any changes 
to market and tariff rules needed?
    d. Do you have the right tools to identify any problems that may 
arise? Are there other process changes that could help address 
reliability-related requests for exemptions from the EPA regulations?

Panelists

     Mark Lauby, Vice President and Director of Reliability 
Assessment and Performance Analysis, North American Electric 
Reliability Corporation
     Michael Kormos, Senior Vice President of Operations, PJM 
Interconnection, L.L.C.
     Carl Monroe, Executive Vice President and Chief Operating 
Officer, Southwest Power Pool (SPP)
     Thomas F. Farrell II, Chairman, President & CEO--Dominion, 
on behalf of EEI
     Kathleen Barron, Vice President, Federal Regulatory 
Affairs and Policy, Exelon Corporation
     Anthony Topazi, Chief Operating Officer, Southern Company
     State Commission(s) to be Announced

12 p.m. Lunch
12:45 p.m. Continuation of Panel III

    Discussion with Commissioners: Open dialogue and questions and 
answers between Panel 1 and Commissioners.

2:15 p.m. Break
2:30 p.m. Panel IV: Discussion on multi-jurisdictional processes.

    Presentations: Panelists will be asked to describe how they 
coordinate processes such as the state integrated resource planning 
with their reliability planning and the safety valve proposal. 
Panelists should address the following broad questions in their 
presentations:
    a. What, if any role should the Commission or DOE play in studying 
replacement generation or other reliability solutions due to 
retirements? What role does the retail regulator, such as a state 
public utility commission or municipal authority play in forming your 
bulk power system reliability plans?
    b. Do you support the exemption process changes identified by the 
RTOs or other entities in comments to the EPA? What role can the 
Commission play in evaluating individual requests

[[Page 71013]]

under a safety-valve approach? Do you have any alternative proposals?

Panelists

     Patricia A. Hoffman, Assistant Secretary for Electricity & 
Infrastructure Reliability, U.S. Department of Energy
     Gerry W. Cauley, President and Chief Executive Officer, 
North American Electric Reliability Corporation (NERC)
     Nick Akins, CEO of American Electric Power (AEP), on 
behalf of AEP and EEI
     Clair J. Moeller, Vice President Transmission Asset 
Management, Midwest Independent Transmission System Operator, Inc. 
(MISO)
     State Commission(s) to be Announced
     Eric Baker, President and Chief Executive Officer, 
Wolverine Electric Power Cooperative
     Debra Raggio, Vice President, Government and Regulatory 
Affairs, Assistant General Counsel, GenOn Energy, Inc.

Commissioner Closing Comments

[FR Doc. 2011-29546 Filed 11-15-11; 8:45 am]