Shetek Wind Inc., Jeffers South, LLC and Allco Renewable Energy Limited, Midwest Independent Transmission System Operator, Inc.; Notice of Filing of Response to Data Request, 71007 [2011-29542]

Download as PDF Federal Register / Vol. 76, No. 221 / Wednesday, November 16, 2011 / Notices Docket No. RM10–23, Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities Docket No. RM11–26, Promoting Transmission Investment Through Pricing Reform Docket No. ER10–1791, Midwest Independent Transmission System Operator, Inc. Dated: November 9, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–29545 Filed 11–15–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1354–081] mstockstill on DSK4VPTVN1PROD with NOTICES Pacific Gas & Electric Company; Notice of Availability of Supplemental Environmental Assessment In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Energy Regulatory Commission’s (Commission) regulations (18 CFR part 380), Commission staff prepared a Supplemental Environmental Assessment (SEA), to supplement the Final EA that was issued on February 19, 2010 regarding Pacific Gas & Electric Company’s (PG&E) proposal to perform Commission-required seismic remediation work at Crane Valley Dam, part of the Crane Valley Hydroelectric Project. The Crane Valley Project occupies approximately 738 acres of federal lands within the Sierra National Forest, and is located approximately 40 miles northeast of the city of Fresno in Madera County, California. PG&E is currently performing the seismic remediation work and supporting activities analyzed in the February 19, 2010 Final EA. PG&E is proposing two new contingency actions that are necessary to ensure that the seismic work at Crane Valley Dam can be completed in a timely manner. First, PG&E proposes to increase the amount of imported rock fill hauled from off-site quarries to ensure an adequate supply of quality rock for completion of the work. Second, PG&E proposes to install, and operate on an as-needed basis, a primary bypass diversion to pass water around the dam to assist in reservoir level control during work on the upstream face of the dam, as well as a minimum flow bypass diversion to ensure VerDate Mar<15>2010 17:45 Nov 15, 2011 Jkt 226001 continuation of required minimum flow releases. The SEA examines the environmental effects of PG&E’s proposed contingency actions and resource protection and mitigation plans that PG&E would follow in accordance with consultation with federal and state resource agencies, and also recommends further measures to minimize any environmental effects. In the SEA, staff concludes that the proposed contingency actions, compliance with the resource protection and mitigation plans, and the recommended measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the SEA is available for review at the Commission’s Public Reference Room, or it may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number (P–1354) in the docket number field to access the document. For assistance, call (202) 502–8222, or (202) 502–8659 (for TTY). For further information on this notice, please contact B. Peter Yarrington at (202) 502–6129. Dated: November 9, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–29541 Filed 11–15–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY 71007 accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Comments and protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make commenters or protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on November 28, 2011. Federal Energy Regulatory Commission Dated: November 9, 2011. Kimberly D. Bose, Secretary. [Docket No. EL11–53–000] [FR Doc. 2011–29542 Filed 11–15–11; 8:45 am] BILLING CODE 6717–01–P Shetek Wind Inc., Jeffers South, LLC and Allco Renewable Energy Limited, Midwest Independent Transmission System Operator, Inc.; Notice of Filing of Response to Data Request Take notice that on November 7, 2011, in response to a request for additional information relevant to the complaint filed in the above-captioned proceeding, Midwest Independent Transmission System Operator, Inc. (MISO) submitted responses to questions from Commission staff. MISO states that copies of the response were served on all parties in the Commission’s eService list for the proceeding, on all Tariff Customers under the Tariff, MISO Members, member representatives of Transmission Owners and Non-Transmission Owners, MISO Advisory Committee participants, and all state commissions within the region. Any person desiring to intervene or to comment on this filing must file in PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER12–348–000] Mercuria Energy America, Inc.; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Mercuria Energy America, Inc.’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal E:\FR\FM\16NON1.SGM 16NON1

Agencies

[Federal Register Volume 76, Number 221 (Wednesday, November 16, 2011)]
[Notices]
[Page 71007]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29542]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL11-53-000]


Shetek Wind Inc., Jeffers South, LLC and Allco Renewable Energy 
Limited, Midwest Independent Transmission System Operator, Inc.; Notice 
of Filing of Response to Data Request

    Take notice that on November 7, 2011, in response to a request for 
additional information relevant to the complaint filed in the above-
captioned proceeding, Midwest Independent Transmission System Operator, 
Inc. (MISO) submitted responses to questions from Commission staff.
    MISO states that copies of the response were served on all parties 
in the Commission's eService list for the proceeding, on all Tariff 
Customers under the Tariff, MISO Members, member representatives of 
Transmission Owners and Non-Transmission Owners, MISO Advisory 
Committee participants, and all state commissions within the region.
    Any person desiring to intervene or to comment on this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Comments and 
protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make commenters 
or protestants parties to the proceeding. Any person wishing to become 
a party must file a notice of intervention or motion to intervene, as 
appropriate.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on November 28, 2011.

    Dated: November 9, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-29542 Filed 11-15-11; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.