DCP Midstream, LP; Notice of Intent To Prepare an Environmental Assessment for the Proposed LaSalle Pipeline Project and Request for Comments on Environmental Issues, 70717-70719 [2011-29400]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 220 / Tuesday, November 15, 2011 / Notices
Comment Date: 5 p.m. ET on 11/25/
2011.
Docket Numbers: ER12–350–000.
Applicants: Wolverine Trading, LLC.
Description: Wolverine Trading, LLC,
FERC Electric MBR Tariff to be effective
11/4/2011.
Filed Date: 11/03/2011.
Accession Number: 20111103–5127.
Comment Date: 5 p.m. ET on 11/25/
2011.
Docket Numbers: ER12–351–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: 11–03–11 MRES
Attachments O, GG, and MM to be
effective 1/1/2012 under ER12–351.
Filed Date: 11/03/2011.
Accession Number: 20111103–5131.
Comment Date: 5 p.m. ET on 11/25/
2011.
Docket Numbers: ER12–352–000.
Applicants: Southern California
Edison Company.
Description: SGIA WDT SERV AG
SCE–Littlerock SGF1 Project to be
effective 11/5/2011.
Filed Date: 11/04/2011.
Accession Number: 20111104–5005.
Comment Date: 5 p.m. ET on 11/25/
2011.
Docket Numbers: ER12–353–000.
Applicants: Sconza Candy Company.
Description: Notice of cancellation of
Sconza Candy Company.
Filed Date: 11/03/2011.
Accession Number: 20111103–5166.
Comment Date: 5 p.m. ET on 11/25/
2011.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 4, 2011.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2011–29394 Filed 11–14–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
19:06 Nov 14, 2011
Jkt 226001
typically-asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site (https://
www.ferc.gov).
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP11–549–000]
DCP Midstream, LP; Notice of Intent To
Prepare an Environmental Assessment
for the Proposed LaSalle Pipeline
Project and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the LaSalle Pipeline Project involving
construction and operation of facilities
by DCP Midstream, LP (DCP) in Weld
County, Colorado. This EA will be used
by the Commission in its decisionmaking process to determine whether
the project is in the public convenience
and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues need to be
evaluated in the EA. Please note that the
scoping period will close on December
8, 2011.
Comments may be submitted in
written form. Further details on how to
submit written comments are provided
in the Public Participation section of
this notice.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives are
asked to notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the project is
approved by the Commission, that
approval conveys with it the right of
eminent domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice DCP provided to landowners.
This fact sheet addresses a number of
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
70717
Summary of the Proposed Project
DCP proposes to construct and
operate approximately 11.3 miles of
12.75-inch-diameter natural gas pipeline
in Weld County, Colorado. The LaSalle
Pipeline Project (Project) would provide
about 230 million standard cubic feet of
natural gas per day to the markets in
Colorado and neighboring areas.
According to DCP, its project would
reduce the strain and continue servicing
the needs of several exploration and
production companies in providing
needed infrastructure to gather, process,
and distribute new natural gas supplies.
The Project would consist of the
following facilities:
• approximately 11.3 miles of 12.75inch-diameter natural gas pipeline;
• one pig 1 launcher and receiver; and
• one block valve;
The general location of the project
facilities is shown in appendix 1.2
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 106.67 acres of
land for the aboveground facilities and
the pipeline. Following construction,
about 0.35 acre would be maintained for
permanent operation of the Project’s
facilities; the remaining acreage would
be restored and allowed to revert to
former uses. The proposed Project route
would share a 50-foot-wide permanent
easement with a newly constructed nonjurisdictional gathering pipeline,
located approximately 10 feet south of
the proposed Project alignment.
Locations for contractor and/or pipe
yards have yet to be identified.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
1 A ‘‘pig’’ is a tool that is inserted into and moves
through the pipeline, and is used for cleaning the
pipeline, internal inspections, or other purposes.
2 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at https://
www.ferc.gov using the link called ‘‘eLibrary’’ or
from the Commission’s Public Reference Room, 888
First Street NE., Washington, DC 20426, or call
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
E:\FR\FM\15NON1.SGM
15NON1
mstockstill on DSK4VPTVN1PROD with NOTICES
70718
Federal Register / Vol. 76, No. 220 / Tuesday, November 15, 2011 / Notices
Necessity. NEPA also requires us 3 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. All comments
received will be considered during the
preparation of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• geology and soils;
• land use;
• socioeconomics;
• water resources, fisheries, and
wetlands;
• cultural resources;
• vegetation and wildlife;
• air quality and noise;
• endangered and threatened species;
and
• public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be presented in the EA. The
EA will be placed in the public record
and, depending on the comments
received during the scoping process,
may be published and distributed to the
public. A comment period will be
allotted if the EA is published for
review. We will consider all comments
on the EA before we make our
recommendations to the Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section beginning below.
With this notice, we are asking
agencies with jurisdiction and/or
special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. These agencies may choose to
participate once they have evaluated the
proposal relative to their
responsibilities. Agencies that would
like to request cooperating agency status
should follow the instructions for filing
comments provided under the Public
Participation section of this notice.
3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
VerDate Mar<15>2010
19:06 Nov 14, 2011
Jkt 226001
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with
applicable State Historic Preservation
Office (SHPO), and to solicit their views
and those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.4 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project is further developed. On
natural gas facility projects, the APE at
a minimum encompasses all areas
subject to ground disturbance (examples
include construction right-of-way,
contractor/pipe storage yards,
compressor stations, and access roads).
Our EA for this project will document
our findings on the impacts on historic
properties and summarize the status of
consultations under section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that they will be received in
Washington, DC on or before December
8, 2011
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP11–549–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert eFiling staff
available to assist you at (202) 502–8258
or efiling@ferc.gov.
(1) You may file your comments
electronically by using the eComment
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. An eComment
is an easy method for interested persons
to submit brief, text-only comments on
a project;
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Historic properties are
defined in those regulations as any prehistoric or
historic district, site, building, structure, or object
included in or eligible for inclusion in the National
Register of Historic Places.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s Web site at https://
www.ferc.gov under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making. A comment on a particular
project is considered a ‘‘Comment on a
Filing’’; or
(3) You may file a paper copy of your
comments at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Room 1A, Washington,
DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If the EA is published for distribution,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
E:\FR\FM\15NON1.SGM
15NON1
Federal Register / Vol. 76, No. 220 / Tuesday, November 15, 2011 / Notices
intervenor are included in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at https://www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP11–549). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: November 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29400 Filed 11–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13994–001]
mstockstill on DSK4VPTVN1PROD with NOTICES
Public Utility District No. 1 of
Snohomish County; Notice of Intent To
File License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 13994–001.
c. Date Filed: September 9, 2011.
d. Submitted by: Public Utility
District No. 1 of Snohomish County
(Snohomish PUD).
VerDate Mar<15>2010
19:06 Nov 14, 2011
Jkt 226001
e. Name of Project: Hancock Creek
Hydroelectric Project.
f. Location: On Hancock Creek, in
King County, Washington. No federal
lands are occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Kim
D. Moore, Assistant General Manager of
Generation, Water, and Corporate
Services; Public Utility District No. 1 of
Snohomish County; 2320 California
Street; P.O. Box 1107; Everett, WA
98206–1107; (425) 783–8606; email:
KDMoore@snopud.com.
i. FERC Contact: Kelly Wolcott at
(202) 502–6480; or email at
kelly.wolcott@ferc.gov.
j. Snohomish PUD No. 1 filed its
request to use the Traditional Licensing
Process on September 9, 2011.
Snohomish PUD provided public notice
of its request on September 8, 2011. In
a letter dated November 7, 2011, the
Director of the Division of Hydropower
Licensing approved Snohomish PUD’s
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the Washington State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Snohomish PUD as the Commission’s
non-federal representative for carrying
out informal consultation, pursuant to
section 7 of the Endangered Species Act,
section 305 of the Magnuson-Stevens
Fishery Conservation and Management
Act, and section 106 of the National
Historic Preservation Act.
m. Snohomish PUD filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
70719
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: November 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29406 Filed 11–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13948–001]
Public Utility District No. 1 of
Snohomish County; Notice of Intent To
File License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 13948–001.
c. Date Filed: September 9, 2011.
d. Submitted By: Public Utility
District No. 1 of Snohomish County
(Snohomish PUD).
e. Name of Project: Calligan Creek
Hydroelectric Project.
f. Location: On Calligan Creek, in
King County, Washington. No federal
lands are occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Kim
D. Moore, Assistant General Manager of
Generation, Water, and Corporate
Services; Public Utility District No. 1 of
Snohomish County; 2320 California
Street; P.O. Box 1107; Everett, WA
98206–1107; (425) 783–8606; email:
KDMoore@snopud.com.
i. FERC Contact: Kelly Wolcott at
(202) 502–6480; or email at
kelly.wolcott@ferc.gov.
j. Snohomish PUD No. 1 filed its
request to use the Traditional Licensing
Process on September 9, 2011.
Snohomish PUD provided public notice
of its request on September 8, 2011. In
a letter dated November 7, 2011, the
Director of the Division of Hydropower
E:\FR\FM\15NON1.SGM
15NON1
Agencies
[Federal Register Volume 76, Number 220 (Tuesday, November 15, 2011)]
[Notices]
[Pages 70717-70719]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29400]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP11-549-000]
DCP Midstream, LP; Notice of Intent To Prepare an Environmental
Assessment for the Proposed LaSalle Pipeline Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the LaSalle Pipeline Project
involving construction and operation of facilities by DCP Midstream, LP
(DCP) in Weld County, Colorado. This EA will be used by the Commission
in its decision-making process to determine whether the project is in
the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues need to be evaluated in the EA. Please note that
the scoping period will close on December 8, 2011.
Comments may be submitted in written form. Further details on how
to submit written comments are provided in the Public Participation
section of this notice.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives are asked to notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the proposed facilities.
The company would seek to negotiate a mutually acceptable agreement.
However, if the project is approved by the Commission, that approval
conveys with it the right of eminent domain. Therefore, if easement
negotiations fail to produce an agreement, the pipeline company could
initiate condemnation proceedings where compensation would be
determined in accordance with state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice DCP provided to landowners. This fact sheet addresses a
number of typically-asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings. It is
also available for viewing on the FERC Web site (https://www.ferc.gov).
Summary of the Proposed Project
DCP proposes to construct and operate approximately 11.3 miles of
12.75-inch-diameter natural gas pipeline in Weld County, Colorado. The
LaSalle Pipeline Project (Project) would provide about 230 million
standard cubic feet of natural gas per day to the markets in Colorado
and neighboring areas. According to DCP, its project would reduce the
strain and continue servicing the needs of several exploration and
production companies in providing needed infrastructure to gather,
process, and distribute new natural gas supplies.
The Project would consist of the following facilities:
approximately 11.3 miles of 12.75-inch-diameter natural
gas pipeline;
one pig \1\ launcher and receiver; and
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that is inserted into and moves through
the pipeline, and is used for cleaning the pipeline, internal
inspections, or other purposes.
---------------------------------------------------------------------------
one block valve;
The general location of the project facilities is shown in appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of appendices were sent to
all those receiving this notice in the mail and are available at
https://www.ferc.gov using the link called ``eLibrary'' or from the
Commission's Public Reference Room, 888 First Street NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 106.67
acres of land for the aboveground facilities and the pipeline.
Following construction, about 0.35 acre would be maintained for
permanent operation of the Project's facilities; the remaining acreage
would be restored and allowed to revert to former uses. The proposed
Project route would share a 50-foot-wide permanent easement with a
newly constructed non-jurisdictional gathering pipeline, located
approximately 10 feet south of the proposed Project alignment.
Locations for contractor and/or pipe yards have yet to be identified.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and
[[Page 70718]]
Necessity. NEPA also requires us \3\ to discover and address concerns
the public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
notice, the Commission requests public comments on the scope of the
issues to address in the EA. All comments received will be considered
during the preparation of the EA.
---------------------------------------------------------------------------
\3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
geology and soils;
land use;
socioeconomics;
water resources, fisheries, and wetlands;
cultural resources;
vegetation and wildlife;
air quality and noise;
endangered and threatened species; and
public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be presented in the EA.
The EA will be placed in the public record and, depending on the
comments received during the scoping process, may be published and
distributed to the public. A comment period will be allotted if the EA
is published for review. We will consider all comments on the EA before
we make our recommendations to the Commission. To ensure your comments
are considered, please carefully follow the instructions in the Public
Participation section beginning below.
With this notice, we are asking agencies with jurisdiction and/or
special expertise with respect to environmental issues to formally
cooperate with us in the preparation of the EA. These agencies may
choose to participate once they have evaluated the proposal relative to
their responsibilities. Agencies that would like to request cooperating
agency status should follow the instructions for filing comments
provided under the Public Participation section of this notice.
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with applicable State Historic Preservation Office (SHPO), and to
solicit their views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\4\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPO as the project is
further developed. On natural gas facility projects, the APE at a
minimum encompasses all areas subject to ground disturbance (examples
include construction right-of-way, contractor/pipe storage yards,
compressor stations, and access roads). Our EA for this project will
document our findings on the impacts on historic properties and
summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Historic
properties are defined in those regulations as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that they will be received in Washington, DC on or before December 8,
2011
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP11-549-000) with your
submission. The Commission encourages electronic filing of comments and
has expert eFiling staff available to assist you at (202) 502-8258 or
efiling@ferc.gov.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. An eComment is an
easy method for interested persons to submit brief, text-only comments
on a project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's Web site at https://www.ferc.gov under the link to Documents and Filings. With eFiling, you
can provide comments in a variety of formats by attaching them as a
file with your submission. New eFiling users must first create an
account by clicking on ``eRegister.'' You will be asked to select the
type of filing you are making. A comment on a particular project is
considered a ``Comment on a Filing''; or
(3) You may file a paper copy of your comments at the following
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If the EA is published for distribution, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an
[[Page 70719]]
intervenor are included in the User's Guide under the ``e-filing'' link
on the Commission's Web site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at https://www.ferc.gov using the ``eLibrary'' link. Click
on the eLibrary link, click on ``General Search'' and enter the docket
number, excluding the last three digits in the Docket Number field
(i.e., CP11-549). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: November 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-29400 Filed 11-14-11; 8:45 am]
BILLING CODE 6717-01-P