KC LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 70720-70721 [2011-29399]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
70720
Federal Register / Vol. 76, No. 220 / Tuesday, November 15, 2011 / Notices
Licensing approved Snohomish PUD’s
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the Washington State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Snohomish PUD as the Commission’s
non-federal representative for carrying
out informal consultation, pursuant to
section 7 of the Endangered Species Act,
section 305 of the Magnuson-Stevens
Fishery Conservation and Management
Act, and section 106 of the National
Historic Preservation Act.
m. Snohomish PUD filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1-(866) 208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
o. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: November 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29405 Filed 11–14–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
19:06 Nov 14, 2011
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14228–000]
Natural Currents Energy Services,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On July 15, 2011, Natural Currents
Energy Services, LLC filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Avalon Tidal
Energy Project, which would be located
on the Ingram Thoroughfare in Cape
May County, New Jersey. The proposed
project would not use a dam or
impoundment. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) Installation of 10 to 30 NC Sea
Dragon or Red Hawk tidal turbines at a
rated capacity of 100 kilowatts, (2) an
estimated 700 meters in length of
additional transmission infrastructure,
and (3) appurtenant facilities. The
project is estimated to have an annual
minimum generation of 3,504,000
kilowatt-hours with the installation of
10 units.
Applicant Contact: Mr. Roger Bason,
Natural Currents Energy Services, LLC,
24 Roxanne Boulevard, Highland, New
York 12561, (845) 691–4009.
FERC Contact: Woohee Choi (202)
502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
information at the end of your
comments.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/elibrary.
asp. Enter the docket number (P–14228–
000) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: November 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29407 Filed 11–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14303–000]
KC LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On October 11, 2011, KC LLC filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Tinemaha Hydropower
Project (project) to be located at
Tinemaha dam and reservoir on the
Owens River, three miles south of Big
Pine in Inyo County, California. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
(1) the existing Los Angeles Department
of Water and Power Tinemaha reservoir
earth fill dam; (2) the existing Tinemaha
reservoir with a surface area of 2,098
acres and a storage capacity of 16,405
acre-feet at a normal surface elevation of
3,871 feet msl; (3) a 200-foot-long, 72inch-diameter steel penstock; (4) a
E:\FR\FM\15NON1.SGM
15NON1
Federal Register / Vol. 76, No. 220 / Tuesday, November 15, 2011 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
powerhouse with a 0.4 megawatt Kaplan
generating unit, (5) a one-mile-long, 25
kilovolt primary transmission line; and
(6) appurtenant facilities. The proposed
project would have an estimated annual
production of 1.5 gigawatt-hours.
Applicant Contact: Ms. Kelly W.
Sackheim, Principal—KC LLC, 5096
Cocoa Palm Way, Fair Oaks, CA 95628;
phone: (301) 401–5978.
FERC Contact: Joseph Hassell; phone:
(202) 502–8079.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–(866) 208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14303–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: November 8, 2011.
Kimberly D. Bose,
Secretary
[FR Doc. 2011–29399 Filed 11–14–11; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
19:06 Nov 14, 2011
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM09–2–001]
Contract Reporting Requirements of
Intrastate Natural Gas Companies;
Notice of Availability of Form 549D
Quarterly Reports for Q1 and Q2 2011
The Commission is making available
to the public the Form No. 549D—
Quarterly Transportation & Storage
Reports for Intrastate Natural Gas and
Hinshaw Pipelines for the first and
second quarters of 2011. The data are
located on the Commission’s Web site at
https://eformspublic.ferc.gov/.
The public may search and download
the entire database for all quarters or
specific quarters or for specific
companies. As future quarterly reports
are filed with the Commission, they will
also be available on the Commission’s
Web site after the deadline for filing.
Any questions or comments regarding
the data should be sent to the
Form549D@ferc.gov mail box.
Dated: November 8, 2011.
Kimberly D. Bose,
Secretary.
70721
improve coordination and optimization
of transfer capability across the BulkPower System from a reliability and
economic perspective.
The agenda for this workshop will be
issued at a later date. Information will
be posted on the calendar page for this
event on the Commission’s web site,
https://www.ferc.gov, prior to the event.
This event will not be Web cast nor
transcribed.
Commission workshops are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations, please send an email
to accessibility@ferc.gov or call toll free
1–(866) 208–3372 (voice) or (202) 208–
1659 (TTY), or send a FAX to (202) 208–
2106 with the required
accommodations.
For more information about this
conference, please contact: Sarah
McKinley, Office of External Affairs,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426, (202) 502–8368,
sarah.mckinley@ferc.gov.
Dated: November 8, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29404 Filed 11–14–11; 8:45 am]
[FR Doc. 2011–29403 Filed 11–14–11; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
FEDERAL ELECTION COMMISSION
Federal Energy Regulatory
Commission
Sunshine Act Notice
[Docket No. AD12–5–000]
DATE
Voltage Coordination on High Voltage
Grids; Notice of Staff Workshop
PLACE:
AGENCY:
Take notice that the Federal Energy
Regulatory Commission will hold a
Workshop on Voltage Coordination on
High Voltage Grids on Thursday,
December 1, 2011 from 9 a.m. to 4:30
p.m. This staff-led workshop will be
held at the Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. The workshop
will be open for the public to attend and
advance registration is not required.
The Commission is interested in
better understanding the interaction
between voltage control, reliability, and
economic dispatch. In addition, the
Commission will consider how
improvements to dispatch and voltage
control software could improve
reliability and market efficiency. The
workshop will address how entities
currently coordinate economic dispatch
and voltage control and the capability of
existing and emerging software to
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Federal Election Commission.
& TIME: Thursday, November 17,
2011 at 10 a.m.
999 E Street, NW., Washington,
DC (Ninth Floor).
This Meeting Will Be Open to
the Public.
STATUS:
ITEMS TO BE DISCUSSED:
Correction and Approval of the Minutes
for the Meeting of October 20, 2011.
Draft Advisory Opinion 2011–19: Social
Financial, Inc. d/b/a GivingSphere.
Agency Procedure for Notice to Named
Respondents in Enforcement Matters
of Additional Material Facts and/or
Additional Potential Violations.
Management and Administrative
Matters.
Individuals who plan to attend and
require special assistance, such as sign
language interpretation or other
reasonable accommodations, should
contact Shawn Woodhead Werth,
Secretary and Clerk, at (202) 694–1040,
at least 72 hours prior to the hearing
date.
E:\FR\FM\15NON1.SGM
15NON1
Agencies
[Federal Register Volume 76, Number 220 (Tuesday, November 15, 2011)]
[Notices]
[Pages 70720-70721]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29399]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14303-000]
KC LLC; Notice of Preliminary Permit Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Competing
Applications
On October 11, 2011, KC LLC filed an application for a preliminary
permit, pursuant to section 4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the Tinemaha Hydropower Project
(project) to be located at Tinemaha dam and reservoir on the Owens
River, three miles south of Big Pine in Inyo County, California. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of (1) the existing Los Angeles
Department of Water and Power Tinemaha reservoir earth fill dam; (2)
the existing Tinemaha reservoir with a surface area of 2,098 acres and
a storage capacity of 16,405 acre-feet at a normal surface elevation of
3,871 feet msl; (3) a 200-foot-long, 72-inch-diameter steel penstock;
(4) a
[[Page 70721]]
powerhouse with a 0.4 megawatt Kaplan generating unit, (5) a one-mile-
long, 25 kilovolt primary transmission line; and (6) appurtenant
facilities. The proposed project would have an estimated annual
production of 1.5 gigawatt-hours.
Applicant Contact: Ms. Kelly W. Sackheim, Principal--KC LLC, 5096
Cocoa Palm Way, Fair Oaks, CA 95628; phone: (301) 401-5978.
FERC Contact: Joseph Hassell; phone: (202) 502-8079.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-(866) 208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14303-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: November 8, 2011.
Kimberly D. Bose,
Secretary
[FR Doc. 2011-29399 Filed 11-14-11; 8:45 am]
BILLING CODE 6717-01-P