Carbon Zero, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 70713-70714 [2011-29352]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 76, No. 220 / Tuesday, November 15, 2011 / Notices
SAMUELSON, SCOTT L
SATYAPAL, SUNITA NMN
SCHAAL, ALFRED MICHAEL
SCHEINMAN, ADAM M
SCHOENBAUER, MARTIN J
SCHUNEMAN, PATRICIA J
SCOTT, RANDAL S
SEDILLO, DAVID NMN
SENA, RICHARD F
SHEELY, KENNETH B
SHEPPARD, CATHERINE M
SHERRY, THEODORE D
SHOOP, DOUG S
SHORT, STEPHANIE A
SILVER, JONATHAN M
SILVERSTEIN, BRIAN L
SIMONSON, STEVEN C
SKUBEL, STEPHEN C
SMITH, CHRISTOPHER A
SMITH, KEVIN W
SMITH, THOMAS Z
SMITH-KEVERN, REBECCA F
SNIDER, ERIC S
SNIDER, LINDA J
SNYDER, ROGER E
SPEARS, TERREL J
SPERLING, GILBERT P
STAKER, THOMAS R
STALLMAN, ROBERT M
STARK, RICHARD M
STEARRETT, BARBARA H
STENSETH, WILLIAM LYNN
STEPHENSON, APRIL G
STONE, BARBARA R
STONE, RUTH RENEE
STRAYER, MICHAEL R
STREIT, LISA D
STUCKY, JEAN SEIBERT
SURASH, JOHN E
SWEETNAM, GLEN E
SYKES, MERLE L
SYNAKOWSKI, EDMUND J
TALBOT JR, GERALD L
THOMPSON, MICHAEL A
THRESS JR, DONALD F
TOCZKO, JAMES E
TOMER, BRADLEY J
TRAUTMAN, STEPHEN J
TRIAY, INES R
TUCKER, CRAIG A
TURNER, SHELLEY P
TURNURE, JAMES T
TYNER, TERESA M
UNRUH, TIMOTHY D
URIE, MATTHEW C
VALDEZ, WILLIAM J
VAN DAM, JAMES W
VAVOSO, THOMAS G
VEGA, GILBERT NMN
VENUTO, KENNETH T
VILLAR, JOSE A
WADDELL, JOSEPH F
WAGNER, M PATRICE
WAISLEY, SANDRA L
WARD, GARY K
WARNICK, WALTER L
WARREN, BRADLEY S
WEATHERWAX, SHARLENE C
WEEBER, DANIEL M
VerDate Mar<15>2010
19:06 Nov 14, 2011
Jkt 226001
WEEDALL, MICHAEL J
WEIS, MICHAEL J
WELLING, DAVID CRAIG
WESTON-DAWKES, ANDREW P
WHITNEY, JAMES M
WILBER, DEBORAH A
WILCHER, LARRY D
WILLIAMS JR, MELVIN G
WILLIAMS, ALICE C
WILLIAMS, RHYS M
WILLIAMS, THOMAS D
WILSON JR, THOMAS NMN
WINTERS, MATTHEW A
WOOD, JAMES F
WORLEY, MICHAEL N
WORTHINGTON, JON C
WORTHINGTON, PATRICIA R
WRIGHT, STEPHEN J
WYKA JR, THEODORE A
YOSHIDA, PHYLLIS G
ZABRANSKY, DAVID K
ZAMORSKI, MICHAEL J
ZEH, CHARLES M
ZIEMIANSKI, EDWARD J
Issued in Washington, DC, November 2,
2011.
Sarah J. Bonilla,
Director, Office of Human Capital
Management.
[FR Doc. 2011–29464 Filed 11–14–11; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Senior Executive Service; Performance
Review Board
U.S. Department of Energy.
Designation of Performance
Review Board Chair.
AGENCY:
ACTION:
This notice provides the
Performance Review Board Chair
designee for the Department of Energy.
DATES: This appointment is effective as
of September 30, 2011.
Susan F. Beard
SUMMARY:
Issued in Washington, DC, November 2,
2011.
Sarah J. Bonilla,
Director, Office of Human Capital
Management.
[FR Doc. 2011–29465 Filed 11–14–11; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14308–000]
Carbon Zero, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests
Take notice that the following
hydroelectric application has been filed
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
70713
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
from Licensing.
b. Project No.: 14308–000.
c. Date Filed: October 24, 2011.
d. Applicant: Carbon Zero, LLC.
e. Name of Project: Vermont Tissue
Mill Hydroelectric Project.
f. Location: On the Walloomsac River,
in the Town of Bennington, Bennington
County, Vermont. The project would not
occupy lands of the United States.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: William F.
Scully, Carbon Zero, LLC, P.O. Box 338,
North Bennington, VT 05257; (802) 442–
0311; wfscully@gmail.com.
i. FERC Contact: Amy K. Chang, (202)
502–8250 or Amy.Chang@ferc.gov.
j. Cooperating Agencies: Federal,
state, local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to Section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: December 23, 2011.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov/docs-filing/
ferconline.asp). Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
E:\FR\FM\15NON1.SGM
15NON1
mstockstill on DSK4VPTVN1PROD with NOTICES
70714
Federal Register / Vol. 76, No. 220 / Tuesday, November 15, 2011 / Notices
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
m. The application is not ready for
environmental analysis at this time.
n. Vermont Mill Tissue Hydroelectic
Project would consist of two existing
dams separated by a 400-foot-long
island and include: (1) An 85-foot-long,
15-foot-high principal dam with an
uncontrolled spillway topped by 4-inchhigh replaceable flashboards; (2) an 80foot-long, 15.3-foot-high dam with an
emergency spillway; (3) an existing 6foot-high by 6-foot-wide clean-out gate
located under the spillway of the
principal dam; (4) an existing 6.4-acre
impoundment with a normal water
surface elevation of 550 feet above mean
sea level; (5) an existing intake structure
equipped with one 12-foot-high by 9foot-long and three 12-foot-high by 12foot-long headgates and trashracks
connected to two water conveyance
channels, one 50 feet long and one 75
feet long; (6) an existing powerhouse
with three new turbine generating units
with a total installed capacity of 349
kilowatts; and (7) a new 100-foot-long
transmission line. In addition to
installing the new turbine generating
units and new transmission line listed
above, the applicant proposes to
renovate and repair the trashracks and
tailrace retaining wall, and excavate a
new tailrace downstream of the
principal dam. The project would be
operated in a run-of-river mode and
would generate an annual average of
approximately 1,257 megawatt-hours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Vermont State
Historic Preservation Officer (SHPO), as
required by 106, National Historic
Preservation Act, and the regulations of
VerDate Mar<15>2010
19:06 Nov 14, 2011
Jkt 226001
the Advisory Council on Historic
Preservation, 36, CFR, at 800.4.
q. Procedural schedule: The
application will be processed according
to the following Hydro Licensing
Schedule. Revisions to the schedule will
be made as appropriate (e.g., if scoping
is waived, the schedule would be
shortened).
Issue Deficiency Letter .........
Issue Notice of Acceptance
Issue Scoping Document .....
Issue Notice ready for environmental analysis.
Issue Notice of the availability of the EA.
January 2012.
March 2012.
March 2012.
May 2012.
October 2012.
Dated: November 7, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29352 Filed 11–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3043–016]
Arkansas Electric Cooperative
Corporation and The Bank of New York
Mellon, as Owner Trustee; Notice of
Application for Partial Transfer of
License, and Soliciting Comments and
Motions To Intervene
On October 27, 2011, Arkansas
Electric Cooperative Corporation
(AECC) and The Bank of New York
Mellon, as Owner Trustee (co-licensee)
filed an application for transfer of
license for the Arkansas River Lock and
Dam No. 13, Hydroelectric Project No.
3043, located on the Arkansas River in
Crawford County, Arkansas.
Applicants seek Commission approval
to transfer the license for the Arkansas
River Lock and Dam No. 13
Hydroelectric Project from The Bank of
New York Mellon, as Owner Trustee,
co-licensee to AECC as sole licensee.
Applicants’ Contact: AECC: Robert M.
Lyford, Senior Vice President and
General Counsel, Arkansas Electric
Cooperative Corporation, P.O. Box
194208, Little Rock, AR 72219–4208,
(501) 570–2268 and Sean T. Beeny,
Jeffrey K. Janike, Miller, Balis & O’Neill,
P.C., 1015 15th Street, NW., 12th Floor,
Washington, DC 20005, (202) 296–2960.
Co-licensee: The Bank of New York
Mellon, c/o the Bank of Mellon Trust
Company, N.A., 700 South Flower
Street, Suite 500, Los Angeles, CA
90019, Attention: Corporate Unit.
FERC Contact: Patricia W. Gillis (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments and
motions to intervene: 20 days from the
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
issuance date of this notice. Comments
and motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1) and the instructions
on the Commission’s Web site under
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–3043) in the
docket number field to access the
document. For assistance, call toll-free
1–(866) 208–3372.
Dated: November 7, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–29353 Filed 11–14–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos., P–349–174; P–2407–140]
Alabama Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Request for
drought-based temporary variance of the
Martin Project rule curve and minimum
flow releases at the Yates and Thurlow
Project.
b. Project Nos.: 349–174 and 2407–
140.
c. Date Filed: November 4, 2011.
d. Applicant: Alabama Power
Company.
e. Name of Projects: Martin
Hydroelectric Project (P–349) and Yates
and Thurlow Hydroelectric Project (P–
2407).
f. Location: The Martin Dam Project is
located on the Tallapoosa River in the
counties of Coosa, Elmore, and
Tallapoosa, Alabama. The Yates and
E:\FR\FM\15NON1.SGM
15NON1
Agencies
[Federal Register Volume 76, Number 220 (Tuesday, November 15, 2011)]
[Notices]
[Pages 70713-70714]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29352]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14308-000]
Carbon Zero, LLC; Notice of Application Tendered for Filing With
the Commission and Soliciting Additional Study Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption from Licensing.
b. Project No.: 14308-000.
c. Date Filed: October 24, 2011.
d. Applicant: Carbon Zero, LLC.
e. Name of Project: Vermont Tissue Mill Hydroelectric Project.
f. Location: On the Walloomsac River, in the Town of Bennington,
Bennington County, Vermont. The project would not occupy lands of the
United States.
g. Filed Pursuant to: Public Utility Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
h. Applicant Contact: William F. Scully, Carbon Zero, LLC, P.O. Box
338, North Bennington, VT 05257; (802) 442-0311; wfscully@gmail.com.
i. FERC Contact: Amy K. Chang, (202) 502-8250 or
Amy.Chang@ferc.gov.
j. Cooperating Agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to Section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: December 23, 2011.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov/docs-filing/ferconline.asp). Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-
3676; or, for TTY,
[[Page 70714]]
contact (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
m. The application is not ready for environmental analysis at this
time.
n. Vermont Mill Tissue Hydroelectic Project would consist of two
existing dams separated by a 400-foot-long island and include: (1) An
85-foot-long, 15-foot-high principal dam with an uncontrolled spillway
topped by 4-inch-high replaceable flashboards; (2) an 80-foot-long,
15.3-foot-high dam with an emergency spillway; (3) an existing 6-foot-
high by 6-foot-wide clean-out gate located under the spillway of the
principal dam; (4) an existing 6.4-acre impoundment with a normal water
surface elevation of 550 feet above mean sea level; (5) an existing
intake structure equipped with one 12-foot-high by 9-foot-long and
three 12-foot-high by 12-foot-long headgates and trashracks connected
to two water conveyance channels, one 50 feet long and one 75 feet
long; (6) an existing powerhouse with three new turbine generating
units with a total installed capacity of 349 kilowatts; and (7) a new
100-foot-long transmission line. In addition to installing the new
turbine generating units and new transmission line listed above, the
applicant proposes to renovate and repair the trashracks and tailrace
retaining wall, and excavate a new tailrace downstream of the principal
dam. The project would be operated in a run-of-river mode and would
generate an annual average of approximately 1,257 megawatt-hours.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. With this notice, we are initiating consultation with the
Vermont State Historic Preservation Officer (SHPO), as required by 106,
National Historic Preservation Act, and the regulations of the Advisory
Council on Historic Preservation, 36, CFR, at 800.4.
q. Procedural schedule: The application will be processed according
to the following Hydro Licensing Schedule. Revisions to the schedule
will be made as appropriate (e.g., if scoping is waived, the schedule
would be shortened).
Issue Deficiency Letter.................. January 2012.
Issue Notice of Acceptance............... March 2012.
Issue Scoping Document................... March 2012.
Issue Notice ready for environmental May 2012.
analysis.
Issue Notice of the availability of the October 2012.
EA.
Dated: November 7, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-29352 Filed 11-14-11; 8:45 am]