Drawbridge Operation Regulations; Mystic River, CT, 70348 [2011-29239]
Download as PDF
70348
Federal Register / Vol. 76, No. 219 / Monday, November 14, 2011 / Rules and Regulations
Management and Budget, with an
explanation of why using these
standards would be inconsistent with
applicable law or otherwise impractical.
Voluntary consensus standards are
technical standards (e.g., specifications
of materials, performance, design, or
operation; test methods; sampling
procedures; and related management
systems practices) that are developed or
adopted by voluntary consensus
standards bodies.
This rule does not use technical
standards. Therefore, we did not
consider the use of voluntary consensus
standards.
We have analyzed this rule under
Department of Homeland Security
Management Directive 023–01 and
Commandant Instruction M16475.lD,
which guides the Coast Guard in
complying with the National
Environmental Policy Act of 1969
(NEPA) (42 U.S.C. 4321–4370f), and
have concluded that this action is one
of a category of actions which do not
individually or cumulatively have a
significant effect on the human
environment. This rule is categorically
excluded, under figure 2–1, paragraph
(32)(e), of the Instruction.
Under figure 2–1, paragraph (32)(e), of
the Instruction, an environmental
analysis checklist and a categorical
exclusion determination are not
required for this rule.
List of Subjects in 33 CFR Part 117
Bridges.
For the reasons discussed in the
preamble, the Coast Guard amends 33
CFR part 117 as follows:
PART 117—DRAWBRIDGE
OPERATION REGULATIONS
1. The authority citation for part 117
continues to read as follows:
■
Authority: 33 U.S.C. 499; 33 CFR 1.05–1;
Department of Homeland Security Delegation
No. 0170.1.
2. In § 117.559, add new paragraph (c)
to read as follows:
■
Isle of Wight (Sinepuxent) Bay
mstockstill on DSK4VPTVN1PROD with RULES
*
*
*
*
*
(c) On July 4, the draw need not open
from 9:30 p.m. until 10:30 p.m. to
accommodate the annual July 4th
fireworks show. Should inclement
weather prevent the fireworks event
from taking place as planned, the draw
need not open from 9:30 p.m. until
10:30 p.m. on July 5th to accommodate
the annual July 4th fireworks show.
VerDate Mar<15>2010
[FR Doc. 2011–29237 Filed 11–10–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–0953]
Drawbridge Operation Regulations;
Mystic River, CT
Environment
§ 117.559
Dated: November 1, 2011.
William D. Lee,
Rear Admiral, United States Coast Guard,
Commander, Fifth Coast Guard District.
16:08 Nov 10, 2011
Jkt 226001
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Route 1 Bridge, mile
2.8, across the Mystic River, at Mystic,
Connecticut. The deviation is necessary
to facilitate a major bridge rehabilitation
project. This deviation allows the bridge
to remain in the closed position for four
and a half months.
DATES: This deviation is effective from
December 1, 2011 through April 15,
2012.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2011–
0953 and are available online at
https://www.regulations.gov, inserting
USCG–2011–0953 in the ‘‘Keyword’’
and then clicking ‘‘Search.’’ They are
also available for inspection or copying
at the Docket Management Facility (M–
30), U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email Ms. Judy Leung-Yee, Project
Officer, First Coast Guard District,
judy.k.leung-yee@uscg.mil, or telephone
(212) 668–7165. If you have questions
on viewing the docket, call Renee V.
Wright, Program Manager, Docket
Operations, telephone (202) 366–9826.
SUPPLEMENTARY INFORMATION: The Route
1 Bridge, across the Mystic River, mile
2.8, at Mystic, Connecticut, has a
vertical clearance in the closed position
of 4 feet at mean high water and 7 feet
at mean low water. The drawbridge
operation regulations are listed at 33
CFR 117.211(b).
SUMMARY:
PO 00000
Frm 00028
Fmt 4700
Sfmt 4700
The bridge rarely opens December
through April except for testing.
The waterway users are recreational
vessels of various sizes that do not
operate during the winter months when
this deviation will be in effect.
The owner of the bridge, Connecticut
Department of Transportation, requested
a temporary deviation from the
regulations to facilitate a major bridge
rehabilitation project.
During the bridge rehabilitation the
bridge will be locked in the closed
position and inoperable for any bridge
openings.
The Coast Guard contacted the
waterway users regarding the bridge
closure and no objections were received.
Under this temporary deviation the
Route 1 Bridge may remain in the closed
position from December 1, 2011 through
April 15, 2012.
Vessels that can pass under the bridge
in the closed position may do so at any
time.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: October 18, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2011–29239 Filed 11–10–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–0986]
Drawbridge Operation Regulations;
Doullut Canal, Mile 0.2, Plaquemines
Parish, Empire, LA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, Eighth
Coast Guard District, has issued a
temporary deviation from the regulation
governing the operation of the SR 11
Bridge over Doullut Canal, mile 0.2,
Plaquemines Parish, Empire, LA. This
deviation will allow the draw to remain
in the closed-to-navigation position for
the duration of the 2011 Orange King
Festival Bicycle Race.
DATES: This deviation is effective on
December 3, 2011 from 8 a.m. until
noon.
SUMMARY:
E:\FR\FM\14NOR1.SGM
14NOR1
Agencies
[Federal Register Volume 76, Number 219 (Monday, November 14, 2011)]
[Rules and Regulations]
[Page 70348]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29239]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2011-0953]
Drawbridge Operation Regulations; Mystic River, CT
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Route 1 Bridge, mile 2.8, across the Mystic River, at Mystic,
Connecticut. The deviation is necessary to facilitate a major bridge
rehabilitation project. This deviation allows the bridge to remain in
the closed position for four and a half months.
DATES: This deviation is effective from December 1, 2011 through April
15, 2012.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2011-0953 and are available online
at https://www.regulations.gov, inserting USCG-2011-0953 in the
``Keyword'' and then clicking ``Search.'' They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or email Ms. Judy Leung-Yee, Project Officer, First Coast Guard
District, judy.k.leung-yee@uscg.mil, or telephone (212) 668-7165. If
you have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone (202) 366-9826.
SUPPLEMENTARY INFORMATION: The Route 1 Bridge, across the Mystic River,
mile 2.8, at Mystic, Connecticut, has a vertical clearance in the
closed position of 4 feet at mean high water and 7 feet at mean low
water. The drawbridge operation regulations are listed at 33 CFR
117.211(b).
The bridge rarely opens December through April except for testing.
The waterway users are recreational vessels of various sizes that
do not operate during the winter months when this deviation will be in
effect.
The owner of the bridge, Connecticut Department of Transportation,
requested a temporary deviation from the regulations to facilitate a
major bridge rehabilitation project.
During the bridge rehabilitation the bridge will be locked in the
closed position and inoperable for any bridge openings.
The Coast Guard contacted the waterway users regarding the bridge
closure and no objections were received.
Under this temporary deviation the Route 1 Bridge may remain in the
closed position from December 1, 2011 through April 15, 2012.
Vessels that can pass under the bridge in the closed position may
do so at any time.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.