Drawbridge Operation Regulation; Atlantic Intracoastal Waterway (AIWW), Elizabeth River, Southern Branch, Chesapeake, VA, 69633 [2011-29013]

Download as PDF jlentini on DSK4TPTVN1PROD with RULES Federal Register / Vol. 76, No. 217 / Wednesday, November 9, 2011 / Rules and Regulations docket are part of docket USCG–2011– 1020 and are available online by going to https://www.regulations.gov, inserting USCG–2011–1020 in the ‘‘Keyword’’ box and then clicking ‘‘Search’’. They are also available for inspection or copying at the Docket Management Facility (M–30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or email Kay Wade, Bridge Administration Branch, Coast Guard; telephone (504) 671–2128, email Kay.B.Wade@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone (202) 366–9826. SUPPLEMENTARY INFORMATION: The Union Pacific Railroad has requested a temporary deviation from the operating schedule for the swing span bridge across the Calcasieu River, mile 36.4, at Westlake, Calcasieu Parish, Louisiana. The swing span bridge has a vertical clearance of 1.07 feet above mean high water, elevation 3.56 feet Mean Gulf Level in the closed-to-navigation position. In accordance with 33 CFR 117.5, the bridge currently opens on signal for the passage of vessels. This deviation allows the swing span of the bridge to remain closed-to-navigation from 8 a.m. through 6 p.m. on Thursday, November 10, Thursday, November 17, and Thursday, November 24, 2011. The swing span of the bridge will open for the passage of vessels from 12 noon to 1 p.m. on Thursday, November 17 and Thursday, November 24, 2011. The closures are necessary in order to remove the existing structural steel, shafts, and gears; and to install two new main drive motors, gears, and wiring on both sides of the pivot pier of the turn span. This maintenance is essential for the continued operation of the bridge. Notices will be published in the Eighth Coast Guard District Local Notice to Mariners and will be broadcast via the Coast Guard Broadcast Notice to Mariners System. Navigation on the waterway is minimal at the bridge site. The very limited commercial traffic at the bridge site consists of commercial tugs with tows. There are only two companies that transit above the bridge. The bridge will be able to open for emergencies if necessary. There are no alternate waterway routes available. Based on experience and coordination with VerDate Mar<15>2010 17:58 Nov 08, 2011 Jkt 226001 waterway users, it has been determined that these closures will not have a significant effect on vessels that use the waterway. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. [FR Doc. 2011–29043 Filed 11–8–11; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2011–1021] Drawbridge Operation Regulation; Atlantic Intracoastal Waterway (AIWW), Elizabeth River, Southern Branch, Chesapeake, VA Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. AGENCY: The Commander, Fifth Coast Guard District, has issued a temporary deviation from the regulations governing the operation of the Norfolk Southern #7 Railroad Bridge across the Elizabeth River (Southern Branch), AIWW mile 5.8, at Chesapeake, VA. Under this temporary deviation, the drawbridge may remain in the closed position on specific dates and times to facilitate laying new rail. DATES: This deviation is effective from 7 a.m. on November 28, 2011 to 5 p.m. on November 29, 2011. ADDRESSES: Documents indicated in this preamble as being available in the docket are part of docket USCG–2011– 1021 and are available online at https:// www.regulations.gov, inserting USCG– 2011–1021 in the ‘‘Keyword’’ box and then clicking ‘‘Search’’. They are also available for inspection or copying at the Docket Management Facility (M–30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or PO 00000 Frm 00033 Fmt 4700 Sfmt 4700 email Mr. Jim Rousseau, Bridge Management Specialist, Fifth Coast Guard District; telephone: (757) 398– 6557; Email: James.L.Rousseau2@uscg.mil. If you have any questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone: (202) 366–9826. The Norfolk Southern Corporation, who owns and operates this single-leaf bascule drawbridge, has requested a temporary deviation from the current operating regulations set out in 33 CFR 117.997(e) to facilitate laying new rail. SUPPLEMENTARY INFORMATION: Dated: November 1, 2011. Eric A. Washburn, Bridge Administrator. SUMMARY: 69633 Under the current operating schedule, the bridge shall be left in the open position at all times and will only be lowered for the passage of trains and to perform periodic maintenance. The Norfolk Southern #7 Bridge, at AIWW mile 5.8, across the Elizabeth River (Southern Branch) in Chesapeake, VA, has a vertical clearance in the closed position to vessels of 7 feet above mean high water. To facilitate laying new rail, the drawbridge will be maintained in the closed-to-navigation position from 7 a.m. to 5 p.m. on November 28 and 29, 2011. The bridge normally operates in the open position with several vessels transiting a week. Coordination with waterway users has been completed. The Coast Guard will inform the users of the waterway through our Local and Broadcast Notices to Mariners of the opening restrictions of the draw span to minimize transiting delays caused by the temporary deviation. There are no alternate routes available but vessels may pass between 5 p.m. and 7 a.m. Mariners able to pass under the bridge in the closed position may do so at any time and the bridge is able to open for emergencies. Mariners are advised to proceed with caution. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: October 26, 2011. Waverly W. Gregory, Jr., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2011–29013 Filed 11–8–11; 8:45 am] BILLING CODE 9110–04–P E:\FR\FM\09NOR1.SGM 09NOR1

Agencies

[Federal Register Volume 76, Number 217 (Wednesday, November 9, 2011)]
[Rules and Regulations]
[Page 69633]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29013]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2011-1021]


Drawbridge Operation Regulation; Atlantic Intracoastal Waterway 
(AIWW), Elizabeth River, Southern Branch, Chesapeake, VA

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, Fifth Coast Guard District, has issued a 
temporary deviation from the regulations governing the operation of the 
Norfolk Southern 7 Railroad Bridge across the Elizabeth River 
(Southern Branch), AIWW mile 5.8, at Chesapeake, VA. Under this 
temporary deviation, the drawbridge may remain in the closed position 
on specific dates and times to facilitate laying new rail.

DATES: This deviation is effective from 7 a.m. on November 28, 2011 to 
5 p.m. on November 29, 2011.

ADDRESSES: Documents indicated in this preamble as being available in 
the docket are part of docket USCG-2011-1021 and are available online 
at https://www.regulations.gov, inserting USCG-2011-1021 in the 
``Keyword'' box and then clicking ``Search''. They are also available 
for inspection or copying at the Docket Management Facility (M-30), 
U.S. Department of Transportation, West Building Ground Floor, Room 
W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, 
call or email Mr. Jim Rousseau, Bridge Management Specialist, Fifth 
Coast Guard District; telephone: (757) 398-6557; Email: 
James.L.Rousseau2@uscg.mil. If you have any questions on viewing the 
docket, call Renee V. Wright, Program Manager, Docket Operations, 
telephone: (202) 366-9826.

SUPPLEMENTARY INFORMATION: The Norfolk Southern Corporation, who owns 
and operates this single-leaf bascule drawbridge, has requested a 
temporary deviation from the current operating regulations set out in 
33 CFR 117.997(e) to facilitate laying new rail.
    Under the current operating schedule, the bridge shall be left in 
the open position at all times and will only be lowered for the passage 
of trains and to perform periodic maintenance. The Norfolk Southern 
7 Bridge, at AIWW mile 5.8, across the Elizabeth River 
(Southern Branch) in Chesapeake, VA, has a vertical clearance in the 
closed position to vessels of 7 feet above mean high water.
    To facilitate laying new rail, the drawbridge will be maintained in 
the closed-to-navigation position from 7 a.m. to 5 p.m. on November 28 
and 29, 2011. The bridge normally operates in the open position with 
several vessels transiting a week. Coordination with waterway users has 
been completed.
    The Coast Guard will inform the users of the waterway through our 
Local and Broadcast Notices to Mariners of the opening restrictions of 
the draw span to minimize transiting delays caused by the temporary 
deviation. There are no alternate routes available but vessels may pass 
between 5 p.m. and 7 a.m. Mariners able to pass under the bridge in the 
closed position may do so at any time and the bridge is able to open 
for emergencies. Mariners are advised to proceed with caution.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the designated 
time period.
    This deviation from the operating regulations is authorized under 
33 CFR 117.35.

    Dated: October 26, 2011.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2011-29013 Filed 11-8-11; 8:45 am]
BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.