Drawbridge Operation Regulation; Atlantic Intracoastal Waterway (AIWW), Elizabeth River, Southern Branch, Chesapeake, VA, 69633 [2011-29013]
Download as PDF
jlentini on DSK4TPTVN1PROD with RULES
Federal Register / Vol. 76, No. 217 / Wednesday, November 9, 2011 / Rules and Regulations
docket are part of docket USCG–2011–
1020 and are available online by going
to https://www.regulations.gov, inserting
USCG–2011–1020 in the ‘‘Keyword’’
box and then clicking ‘‘Search’’. They
are also available for inspection or
copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email Kay Wade, Bridge Administration
Branch, Coast Guard; telephone (504)
671–2128, email Kay.B.Wade@uscg.mil.
If you have questions on viewing the
docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone
(202) 366–9826.
SUPPLEMENTARY INFORMATION: The Union
Pacific Railroad has requested a
temporary deviation from the operating
schedule for the swing span bridge
across the Calcasieu River, mile 36.4, at
Westlake, Calcasieu Parish, Louisiana.
The swing span bridge has a vertical
clearance of 1.07 feet above mean high
water, elevation 3.56 feet Mean Gulf
Level in the closed-to-navigation
position.
In accordance with 33 CFR 117.5, the
bridge currently opens on signal for the
passage of vessels. This deviation allows
the swing span of the bridge to remain
closed-to-navigation from 8 a.m.
through 6 p.m. on Thursday, November
10, Thursday, November 17, and
Thursday, November 24, 2011. The
swing span of the bridge will open for
the passage of vessels from 12 noon to
1 p.m. on Thursday, November 17 and
Thursday, November 24, 2011.
The closures are necessary in order to
remove the existing structural steel,
shafts, and gears; and to install two new
main drive motors, gears, and wiring on
both sides of the pivot pier of the turn
span. This maintenance is essential for
the continued operation of the bridge.
Notices will be published in the Eighth
Coast Guard District Local Notice to
Mariners and will be broadcast via the
Coast Guard Broadcast Notice to
Mariners System.
Navigation on the waterway is
minimal at the bridge site. The very
limited commercial traffic at the bridge
site consists of commercial tugs with
tows. There are only two companies that
transit above the bridge. The bridge will
be able to open for emergencies if
necessary. There are no alternate
waterway routes available. Based on
experience and coordination with
VerDate Mar<15>2010
17:58 Nov 08, 2011
Jkt 226001
waterway users, it has been determined
that these closures will not have a
significant effect on vessels that use the
waterway.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
[FR Doc. 2011–29043 Filed 11–8–11; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–1021]
Drawbridge Operation Regulation;
Atlantic Intracoastal Waterway (AIWW),
Elizabeth River, Southern Branch,
Chesapeake, VA
Coast Guard, DHS.
ACTION: Notice of temporary deviation
from regulations.
AGENCY:
The Commander, Fifth Coast
Guard District, has issued a temporary
deviation from the regulations
governing the operation of the Norfolk
Southern #7 Railroad Bridge across the
Elizabeth River (Southern Branch),
AIWW mile 5.8, at Chesapeake, VA.
Under this temporary deviation, the
drawbridge may remain in the closed
position on specific dates and times to
facilitate laying new rail.
DATES: This deviation is effective from
7 a.m. on November 28, 2011 to 5 p.m.
on November 29, 2011.
ADDRESSES: Documents indicated in this
preamble as being available in the
docket are part of docket USCG–2011–
1021 and are available online at https://
www.regulations.gov, inserting USCG–
2011–1021 in the ‘‘Keyword’’ box and
then clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
PO 00000
Frm 00033
Fmt 4700
Sfmt 4700
email Mr. Jim Rousseau, Bridge
Management Specialist, Fifth Coast
Guard District; telephone: (757) 398–
6557; Email:
James.L.Rousseau2@uscg.mil. If you
have any questions on viewing the
docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone:
(202) 366–9826.
The
Norfolk Southern Corporation, who
owns and operates this single-leaf
bascule drawbridge, has requested a
temporary deviation from the current
operating regulations set out in 33 CFR
117.997(e) to facilitate laying new rail.
SUPPLEMENTARY INFORMATION:
Dated: November 1, 2011.
Eric A. Washburn,
Bridge Administrator.
SUMMARY:
69633
Under the current operating schedule,
the bridge shall be left in the open
position at all times and will only be
lowered for the passage of trains and to
perform periodic maintenance. The
Norfolk Southern #7 Bridge, at AIWW
mile 5.8, across the Elizabeth River
(Southern Branch) in Chesapeake, VA,
has a vertical clearance in the closed
position to vessels of 7 feet above mean
high water.
To facilitate laying new rail, the
drawbridge will be maintained in the
closed-to-navigation position from 7
a.m. to 5 p.m. on November 28 and 29,
2011. The bridge normally operates in
the open position with several vessels
transiting a week. Coordination with
waterway users has been completed.
The Coast Guard will inform the users
of the waterway through our Local and
Broadcast Notices to Mariners of the
opening restrictions of the draw span to
minimize transiting delays caused by
the temporary deviation. There are no
alternate routes available but vessels
may pass between 5 p.m. and 7 a.m.
Mariners able to pass under the bridge
in the closed position may do so at any
time and the bridge is able to open for
emergencies. Mariners are advised to
proceed with caution.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: October 26, 2011.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2011–29013 Filed 11–8–11; 8:45 am]
BILLING CODE 9110–04–P
E:\FR\FM\09NOR1.SGM
09NOR1
Agencies
[Federal Register Volume 76, Number 217 (Wednesday, November 9, 2011)]
[Rules and Regulations]
[Page 69633]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-29013]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2011-1021]
Drawbridge Operation Regulation; Atlantic Intracoastal Waterway
(AIWW), Elizabeth River, Southern Branch, Chesapeake, VA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Fifth Coast Guard District, has issued a
temporary deviation from the regulations governing the operation of the
Norfolk Southern 7 Railroad Bridge across the Elizabeth River
(Southern Branch), AIWW mile 5.8, at Chesapeake, VA. Under this
temporary deviation, the drawbridge may remain in the closed position
on specific dates and times to facilitate laying new rail.
DATES: This deviation is effective from 7 a.m. on November 28, 2011 to
5 p.m. on November 29, 2011.
ADDRESSES: Documents indicated in this preamble as being available in
the docket are part of docket USCG-2011-1021 and are available online
at https://www.regulations.gov, inserting USCG-2011-1021 in the
``Keyword'' box and then clicking ``Search''. They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or email Mr. Jim Rousseau, Bridge Management Specialist, Fifth
Coast Guard District; telephone: (757) 398-6557; Email:
James.L.Rousseau2@uscg.mil. If you have any questions on viewing the
docket, call Renee V. Wright, Program Manager, Docket Operations,
telephone: (202) 366-9826.
SUPPLEMENTARY INFORMATION: The Norfolk Southern Corporation, who owns
and operates this single-leaf bascule drawbridge, has requested a
temporary deviation from the current operating regulations set out in
33 CFR 117.997(e) to facilitate laying new rail.
Under the current operating schedule, the bridge shall be left in
the open position at all times and will only be lowered for the passage
of trains and to perform periodic maintenance. The Norfolk Southern
7 Bridge, at AIWW mile 5.8, across the Elizabeth River
(Southern Branch) in Chesapeake, VA, has a vertical clearance in the
closed position to vessels of 7 feet above mean high water.
To facilitate laying new rail, the drawbridge will be maintained in
the closed-to-navigation position from 7 a.m. to 5 p.m. on November 28
and 29, 2011. The bridge normally operates in the open position with
several vessels transiting a week. Coordination with waterway users has
been completed.
The Coast Guard will inform the users of the waterway through our
Local and Broadcast Notices to Mariners of the opening restrictions of
the draw span to minimize transiting delays caused by the temporary
deviation. There are no alternate routes available but vessels may pass
between 5 p.m. and 7 a.m. Mariners able to pass under the bridge in the
closed position may do so at any time and the bridge is able to open
for emergencies. Mariners are advised to proceed with caution.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period.
This deviation from the operating regulations is authorized under
33 CFR 117.35.
Dated: October 26, 2011.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2011-29013 Filed 11-8-11; 8:45 am]
BILLING CODE 9110-04-P