Riverbank Hydro No. 6 LLC, Lock Hydro Friends Fund XLVII, FFP Project 52 LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 67167 [2011-28111]
Download as PDF
Federal Register / Vol. 76, No. 210 / Monday, October 31, 2011 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14172–000, 14178–000 and
14190–000]
jlentini on DSK4TPTVN1PROD with NOTICES
Riverbank Hydro No. 6 LLC, Lock
Hydro Friends Fund XLVII, FFP Project
52 LLC; Notice of Competing
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 2, 2011, Riverbank Hydro No.
6 LLC (Riverbank), and on May 3, 2011,
Lock Hydro Friends Fund XLVII (Lock
Hydro), and FFP Project 52 LLC (FFP
52) filed preliminary permit
applications, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of a hydropower
project at the U.S. Army Corps of
Engineers’ (Corps) Toad Suck Ferry
Lock and Dam, located on the Kentucky
River, in Perry and Faulkner Counties,
Arkansas. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
Riverbank’s Project No. 14172–000
would consist of: (1) A forebay; (2) an
intake structure; (3) a powerhouse
containing two generating units with a
total capacity of 37.8 megawatts (MW);
(4) a tailrace structure; and (5) a 12.6mile-long, 69 kilo-volt (kV) transmission
line. The project would have an
estimated average annual generation of
78.8 gigawatt-hours (GWh), and operate
run-of-river utilizing surplus water from
the Toad Suck Ferry Lock and Dam, as
directed by the Corps.
Applicant Contact: Mr. Kuo-Bao
Tong, Riverbank Power Corporation,
Royal Bank Plaza, South Tower, P.O.
Box 166, 200 Bay Street, Suite 3230,
Toronto, ON, Canada M5J2J4. (416) 861–
0092 x 154.
Lock Hydro’s Project No. 14178–000
would consist of: (1) Three lock frame
modules, each frame module will be
109-feet long, 40-feet-high and contain
ten generating units with a total
combined capacity of 22.5 MW; (2) a
new switchyard containing a
transformer; and (3) a proposed 2.0mile-long, 115 kV transmission line to
an existing distribution line. The
proposed project would have an average
annual generation of 147.926 GWh, and
operate run-of-river utilizing surplus
VerDate Mar<15>2010
17:21 Oct 28, 2011
Jkt 226001
water from the Toad Suck Ferry Lock
and Dam, as directed by the Corps.
Applicant Contact: Mr. Wayne F.
Krouse, Hydro Green Energy, 5090
Richmond Avenue #390, Houston, TX
77056. (877) 556–6566 x 709.
FFP 52’s Project No. 14190–000
would consist of: (1) An 900-foot-long,
300-foot-wide approach channel; (2) a
powerhouse, located on the west side of
the dam, containing four generating
units with a total capacity of 40.0 MW;
(3) a 1,560-foot-long, 320-foot-wide
tailrace; (4) a 7.2/69 KV substation; and
(5) a 1.25-mile-long, 69 kV transmission
line. The proposed project would have
an average annual generation of 160.0
GWh, and operate run-of-river utilizing
surplus water from the Toad Suck Ferry
Lock and Dam, as directed by the Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston,
MA 02114. (978) 283–2822.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14172–000, P–14178–000, or P–
14190–000) in the docket number field
to access the document. For assistance,
contact FERC Online Support.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
67167
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–28111 Filed 10–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14131–000; 14135–000; 14138–
000]
Riverbank Hydro No. 1 LLC; Qualified
Hydro 20 LLC; Lock Hydro Friends
Fund XXXVII; Notice of Competing
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On April 1, 2011, Riverbank Hydro
No. 1 LLC (Riverbank), Qualified Hydro
20 LLC (Qualified Hydro) and Lock
Hydro Friends Fund XXXVI (Lock
Hydro) filed preliminary permit
applications, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of a hydropower
project at the U.S. Army Corps of
Engineers’ (Corps) Aberdeen Lock &
Dam, located on the Tombigbee River in
Monroe County, Mississippi. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
Riverbank’s Project No. 14131–000
would consist of: (1) A forebay; (2) an
intake structure; (3) a powerhouse
containing one generating units with a
total capacity of 10 megawatts (MW); (4)
a tailrace structure; and (5) 4-mile-long,
25 kilo-volt (KV) transmission line. The
project would have an estimated average
annual generation of 142.0 gigawatthours (GWh) and operate run-of-river
utilizing surplus water from the
Aberdeen Lock & Dam, as directed by
the Corps.
Applicant Contact: Mr. Kuo-Bao
Tong, Riverbank Power Corporation,
Royal Bank Plaza, South Tower, P.O.
Box 166, 200 Bay Street, Suite 3230,
Toronto, ON, Canada M5J2J4. (416) 861–
0092 x 154.
Qualified Hydro’s Project No. 14135–
000 would consist of: (1) An 130-footlong, 120-foot-wide approach channel;
(2) a powerhouse, located on the east
side of the dam, containing two
generating units with a total capacity of
8.0 MW; (3) a 225-foot-long, 100-foot-
E:\FR\FM\31OCN1.SGM
31OCN1
Agencies
[Federal Register Volume 76, Number 210 (Monday, October 31, 2011)]
[Notices]
[Page 67167]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-28111]
[[Page 67167]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 14172-000, 14178-000 and 14190-000]
Riverbank Hydro No. 6 LLC, Lock Hydro Friends Fund XLVII, FFP
Project 52 LLC; Notice of Competing Preliminary Permit Applications
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On May 2, 2011, Riverbank Hydro No. 6 LLC (Riverbank), and on May
3, 2011, Lock Hydro Friends Fund XLVII (Lock Hydro), and FFP Project 52
LLC (FFP 52) filed preliminary permit applications, pursuant to section
4(f) of the Federal Power Act, proposing to study the feasibility of a
hydropower project at the U.S. Army Corps of Engineers' (Corps) Toad
Suck Ferry Lock and Dam, located on the Kentucky River, in Perry and
Faulkner Counties, Arkansas. The sole purpose of a preliminary permit,
if issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
Riverbank's Project No. 14172-000 would consist of: (1) A forebay;
(2) an intake structure; (3) a powerhouse containing two generating
units with a total capacity of 37.8 megawatts (MW); (4) a tailrace
structure; and (5) a 12.6-mile-long, 69 kilo-volt (kV) transmission
line. The project would have an estimated average annual generation of
78.8 gigawatt-hours (GWh), and operate run-of-river utilizing surplus
water from the Toad Suck Ferry Lock and Dam, as directed by the Corps.
Applicant Contact: Mr. Kuo-Bao Tong, Riverbank Power Corporation,
Royal Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite
3230, Toronto, ON, Canada M5J2J4. (416) 861-0092 x 154.
Lock Hydro's Project No. 14178-000 would consist of: (1) Three lock
frame modules, each frame module will be 109-feet long, 40-feet-high
and contain ten generating units with a total combined capacity of 22.5
MW; (2) a new switchyard containing a transformer; and (3) a proposed
2.0-mile-long, 115 kV transmission line to an existing distribution
line. The proposed project would have an average annual generation of
147.926 GWh, and operate run-of-river utilizing surplus water from the
Toad Suck Ferry Lock and Dam, as directed by the Corps.
Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090
Richmond Avenue 390, Houston, TX 77056. (877) 556-6566 x 709.
FFP 52's Project No. 14190-000 would consist of: (1) An 900-foot-
long, 300-foot-wide approach channel; (2) a powerhouse, located on the
west side of the dam, containing four generating units with a total
capacity of 40.0 MW; (3) a 1,560-foot-long, 320-foot-wide tailrace; (4)
a 7.2/69 KV substation; and (5) a 1.25-mile-long, 69 kV transmission
line. The proposed project would have an average annual generation of
160.0 GWh, and operate run-of-river utilizing surplus water from the
Toad Suck Ferry Lock and Dam, as directed by the Corps.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822.
FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14172-000, P-14178-000, or P-14190-000) in
the docket number field to access the document. For assistance, contact
FERC Online Support.
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-28111 Filed 10-28-11; 8:45 am]
BILLING CODE 6717-01-P