Riverbank Hydro No. 12 LLC; Lock Hydro Friends Fund XXXVI; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 67170-67171 [2011-28107]
Download as PDF
jlentini on DSK4TPTVN1PROD with NOTICES
67170
Federal Register / Vol. 76, No. 210 / Monday, October 31, 2011 / Notices
project at the U.S. Army Corps of
Engineers’ (Corps) Kentucky River Lock
& Dam No. 3, located on the Kentucky
River, in Henry and Owen Counties,
Kentucky. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
Riverbank’s Project No. 14164–000
would consist of: (1) A forebay; (2) an
intake structure; (3) a powerhouse
containing one generating unit with a
total capacity of 9.8 megawatts (MW);
(4) a tailrace structure; and (5) an 8.1mile-long, 25 kilo-volt (kV) transmission
line. The project would have an
estimated average annual generation of
28.6 gigawatt-hours (GWh), and operate
run-of-river utilizing surplus water from
the Kentucky River Lock & Dam No. 3,
as directed by the Corps.
Applicant Contact: Mr. Kuo-Bao Tong,
Riverbank Power Corporation, Royal
Bank Plaza, South Tower, P.O. Box 166,
200 Bay Street, Suite 3230, Toronto, ON,
Canada M5J2J4. (416) 861–0092 x 154.
Lock Hydro’s Project No. 14189–000
would consist of: (1) One lock frame
modules, the frame module will be 45feet long, 20-feet-high and contain four
generating units with a total combined
capacity of 3.0 MW; (2) a new
switchyard containing a transformer;
and (3) a proposed 2.0-mile-long, 115
kV transmission line to an existing
distribution line. The proposed project
would have an average annual
generation of 13.149 GWh, and operate
run-of-river utilizing surplus water from
the Kentucky River Lock & Dam No. 3,
as directed by the Corps.
Applicant Contact: Mr. Wayne F.
Krouse, Hydro Green Energy, 5090
Richmond Avenue #390, Houston, TX
77056. (877) 556–6566 x 709.
FFP 56’s Project No. 14198–000 would
consist of: (1) An 150-foot-long, 100foot-wide approach channel; (2) a
powerhouse, located on the east side of
the dam, containing two generating
units with a total capacity of 5.8 MW;
(3) a 200-foot-long, 75-foot-wide
tailrace; (4) a 4.6/25 KV substation; and
(5) a 0.25-mile-long, 25 kV transmission
line. The proposed project would have
an average annual generation of 23.2
GWh, and operate run-of-river utilizing
surplus water from the Kentucky River
Lock & Dam No. 3, as directed by the
Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power Corp.,
VerDate Mar<15>2010
17:21 Oct 28, 2011
Jkt 226001
239 Causeway Street, Suite 300, Boston,
MA 02114. (978) 283–2822.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14164–000, P–14189–000, or P–
14198–000) in the docket number field
to access the document. For assistance,
contact FERC Online Support.
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–28102 Filed 10–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14175–000; 14183–000]
Riverbank Hydro No. 12 LLC; Lock
Hydro Friends Fund XXXVI; Notice of
Competing Preliminary Permit
Applications Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On May 2, 2011, Riverbank Hydro No.
12 LLC (Riverbank), and on May 3,
2011, Lock Hydro Friends Fund XXXVI
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
(Lock Hydro) filed preliminary permit
applications, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of a hydropower
project at the U.S. Army Corps of
Engineers’ (Corps) Green River Lock &
Dam No. 2, located on the Green River,
in McLean County, Kentucky. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
Riverbank’s Project No. 14175–000
would consist of: (1) A forebay; (2) an
intake structure; (3) a powerhouse
containing one generating unit with a
total capacity of 10.0 megawatts (MW);
(4) a tailrace structure; and (5) a 1.1mile-long, 25 kilo-volt (kV) transmission
line. The project would have an
estimated average annual generation of
32.5 gigawatt-hours (GWh), and operate
run-of-river utilizing surplus water from
the Green River Lock & Dam No. 2, as
directed by the Corps.
Applicant Contact: Mr. Kuo-Bao
Tong, Riverbank Power Corporation,
Royal Bank Plaza, South Tower, P.O.
Box 166, 200 Bay Street, Suite 3230,
Toronto, ON, Canada M5J2J4. (416) 861–
0092 x 154.
Lock Hydro’s Project No. 14183–000
would consist of: (1) One lock frame
modules, the frame module will be 45feet long, 20-feet-high and contain four
generating units with a total combined
capacity of 3.0 MW; (2) a new
switchyard containing a transformer;
and (3) a proposed 2.0-mile-long, 115
kV transmission line to an existing
distribution line. The proposed project
would have an average annual
generation of 13.149 GWh, and operate
run-of-river utilizing surplus water from
the Green River Lock & Dam No. 2, as
directed by the Corps.
Applicant Contact: Mr. Wayne F.
Krouse, Hydro Green Energy, 5090
Richmond Avenue #390, Houston, TX
77056. (877) 556–6566 x 709.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
E:\FR\FM\31OCN1.SGM
31OCN1
Federal Register / Vol. 76, No. 210 / Monday, October 31, 2011 / Notices
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
Solia’s Project No. 14163–000 would
consist of: (1) A 150-foot-long headrace
intake channel; (2) a powerhouse
containing two generating units with a
total capacity of 32.0 megawatts (MW);
(3) a 140-foot-long tailrace; (4) a 3.5mile-long, 34.5 kilo-volt (kV)
transmission line. The proposed project
would have an average annual
generation of 130.0 gigawatt-hours
(GWh), and operate run-of-river
utilizing surplus water from the Howell
Heflin Lock & Dam, as directed by the
Corps.
Applicant Contact: Mr. Douglas
Spaulding, Nelson Energy LLC, 8441
Wayzata Blvd., Suite 101, Golden
Valley, MN 55426. (952) 544–8133.
Riverbank’s Project No. 14174–000
would consist of: (1) A forebay; (2) an
intake structure; (3) a powerhouse
containing two generating units with a
total capacity of 24.7 MW; (4) a tailrace
structure; and (5) an 11.0-mile-long, 69
kV transmission line. The project would
Dated: October 25, 2011.
have an estimated average annual
Kimberly D. Bose,
generation of 91.6 GWh, and operate
Secretary.
run-of-river utilizing surplus water from
the Howell Heflin Lock & Dam, as
[FR Doc. 2011–28107 Filed 10–28–11; 8:45 am]
directed by the Corps.
BILLING CODE 6717–01–P
Applicant Contact: Mr. Kuo-Bao
Tong, Riverbank Power Corporation,
Royal Bank Plaza, South Tower, P.O.
DEPARTMENT OF ENERGY
Box 166, 200 Bay Street, Suite 3230,
Federal Energy Regulatory
Toronto, ON, Canada M5J2J4. (416) 861–
Commission
0092 x 154.
Lock Hydro’s Project No. 14181–000
[Project Nos. 14163–000; 14174–000; 14181–
would consist of: (1) Two lock frame
000; 14195–000]
modules, each frame module will be
109-feet long, 40-feet-high and contain
Solia 7 Hydroelectric LLC; Riverbank
Hydro No. 20 LLC; Lock Hydro Friends ten generating units with a total
Fund XLIII; FFP Project 53 LLC; Notice combined capacity of 15.0 MW; (2) a
new switchyard containing a
of Competing Preliminary Permit
transformer; and (3) a proposed 20.0Applications Accepted for Filing and
mile-long, 115 kV transmission line to
Soliciting Comments, Motions To
Intervene, and Competing Applications an existing distribution line. The
proposed project would have an average
On May 2, 2011, Solia 7 Hydroelectric annual generation of 78.894 GWh, and
LLC (Solia), and Riverbank Hydro No.
operate run-of-river utilizing surplus
20 LLC (Riverbank), and on May 3,
water from the Howell Heflin Lock &
2011, Lock Hydro Friends Fund XLIII
Dam, as directed by the Corps.
(Lock Hydro), and FFP Project 53 LLC
Applicant Contact: Mr. Wayne F.
(FFP 53) filed preliminary permit
Krouse, Hydro Green Energy, 5090
applications, pursuant to section 4(f) of
Richmond Avenue #390, Houston, TX
the Federal Power Act, proposing to
77056. (877) 556–6566 x 709.
FFP 53’s Project No. 14195–000 would
study the feasibility of a hydropower
consist of: (1) An 280-foot-long, 75-footproject at the U.S. Army Corps of
Engineers’ (Corps) Howell Heflin Lock & wide approach channel; (2) a
powerhouse, located on the west side of
Dam, located on the Tombigbee River,
the dam, containing two generating
in Greene County, Alabama. The sole
units with a total capacity of 24.0 MW;
purpose of a preliminary permit, if
(3) a 250-foot-long, 130-foot-wide
issued, is to grant the permit holder
tailrace; (4) a 7.2/115 KV substation; and
priority to file a license application
(5) a 1.5-mile-long, 69 kV transmission
during the permit term. A preliminary
jlentini on DSK4TPTVN1PROD with NOTICES
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support. Although
the Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/elibrary.
asp. Enter the docket number (P–14175–
000, or P–14183–000) in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
VerDate Mar<15>2010
17:21 Oct 28, 2011
Jkt 226001
PO 00000
Frm 00044
Fmt 4703
Sfmt 9990
67171
line. The proposed project would have
an average annual generation of 96.0
GWh, and operate run-of-river utilizing
surplus water from the Howell Heflin
Lock & Dam, as directed by the Corps.
Applicant Contact: Ms. Ramya
Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston,
MA 02114. (978) 283–2822.
FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.
ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support. Although
the Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/elibrary.
asp. Enter the docket number (P–14163–
000, P–14174–000, 14181–000, or P–
14195–000) in the docket number field
to access the document. For assistance,
contact FERC Online Support.
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–28094 Filed 10–28–11; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\31OCN1.SGM
31OCN1
Agencies
[Federal Register Volume 76, Number 210 (Monday, October 31, 2011)]
[Notices]
[Pages 67170-67171]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-28107]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 14175-000; 14183-000]
Riverbank Hydro No. 12 LLC; Lock Hydro Friends Fund XXXVI; Notice
of Competing Preliminary Permit Applications Accepted for Filing and
Soliciting Comments, Motions To Intervene, and Competing Applications
On May 2, 2011, Riverbank Hydro No. 12 LLC (Riverbank), and on May
3, 2011, Lock Hydro Friends Fund XXXVI (Lock Hydro) filed preliminary
permit applications, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of a hydropower project at the U.S.
Army Corps of Engineers' (Corps) Green River Lock & Dam No. 2, located
on the Green River, in McLean County, Kentucky. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
Riverbank's Project No. 14175-000 would consist of: (1) A forebay;
(2) an intake structure; (3) a powerhouse containing one generating
unit with a total capacity of 10.0 megawatts (MW); (4) a tailrace
structure; and (5) a 1.1-mile-long, 25 kilo-volt (kV) transmission
line. The project would have an estimated average annual generation of
32.5 gigawatt-hours (GWh), and operate run-of-river utilizing surplus
water from the Green River Lock & Dam No. 2, as directed by the Corps.
Applicant Contact: Mr. Kuo-Bao Tong, Riverbank Power Corporation,
Royal Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite
3230, Toronto, ON, Canada M5J2J4. (416) 861-0092 x 154.
Lock Hydro's Project No. 14183-000 would consist of: (1) One lock
frame modules, the frame module will be 45-feet long, 20-feet-high and
contain four generating units with a total combined capacity of 3.0 MW;
(2) a new switchyard containing a transformer; and (3) a proposed 2.0-
mile-long, 115 kV transmission line to an existing distribution line.
The proposed project would have an average annual generation of 13.149
GWh, and operate run-of-river utilizing surplus water from the Green
River Lock & Dam No. 2, as directed by the Corps.
Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090
Richmond Avenue 390, Houston, TX 77056. (877) 556-6566 x 709.
FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18
[[Page 67171]]
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14175-000, or P-14183-000) in the docket
number field to access the document. For assistance, contact FERC
Online Support.
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-28107 Filed 10-28-11; 8:45 am]
BILLING CODE 6717-01-P