Riverbank Hydro No. 11 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 67180-67181 [2011-28103]

Download as PDF jlentini on DSK4TPTVN1PROD with NOTICES 67180 Federal Register / Vol. 76, No. 210 / Monday, October 31, 2011 / Notices issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) A forebay; (2) an intake structure; (3) a powerhouse containing two generating units with a total capacity of 10.0 megawatts (MW); (4) a tailrace structure; and (5) 10.1-mile-long, 25 kilo-volt (KV) transmission line. The project would have an estimated average annual generation of 24.0 gigawatthours (GWh), and operate run-of-river utilizing surplus water from the Millwood Dam, as directed by the Corps. Applicant Contact: Mr. Kuo-Bao Tong, Riverbank Power Corporation, Royal Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite 3230, Toronto, ON, Canada M5J2J4. (416) 861– 0092 x 154. FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502– 6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number VerDate Mar<15>2010 17:21 Oct 28, 2011 Jkt 226001 (P–14133–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–28093 Filed 10–28–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14254–000] FFP Project 8 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 11, 2011, FFP Project 8 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project located on the Wax Lake Outlet in St. Mary Parish, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed in-stream hydrokinetic project would consist of: (1) Up to 4,928 SmarTurbine generating units installed in arrays on the water bottom; (2) the total capacity of the installation would be up to 197,120 kilowatts; (3) flexible cables would convey each array’s power to a metering station; and (4) a 13-milelong, 34.5 kilo-Volt transmission line would interconnect with the power grid. The proposed project would have an average annual generation of 448,295,232 kilowatt-hours (kWh), which would be sold to a local utility. Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp., 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283–2822. FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502– 6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14254–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–28112 Filed 10–28–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14165–000] Riverbank Hydro No. 11 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 2, 2011, Riverbank Hydro No. 11 LLC (Riverbank) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project at the U.S. Army Corps of Engineers’ (Corps) Nolin River Dam, located on the Nolin River, in Edmonson County, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary E:\FR\FM\31OCN1.SGM 31OCN1 jlentini on DSK4TPTVN1PROD with NOTICES Federal Register / Vol. 76, No. 210 / Monday, October 31, 2011 / Notices permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) A bifurcation from the existing outlet structure; (2) a 10-foot-diameter, 140-foot-long penstock; (3) a powerhouse containing one generating unit with a total capacity of 8.0 megawatts (MW); (4) a tailrace structure; and (5) an 3.1-mile-long, 25 kilovolt (kV) transmission line. The project would have an estimated average annual generation of 24.5 gigawatt-hours (GWh), and operate run-of-river utilizing surplus water from the Kentucky River Lock & Dam No. 3, as directed by the Corps. Applicant Contact: Mr. Kuo-Bao Tong, Riverbank Power Corporation, Royal Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite 3230, Toronto, ON, Canada M5J2J4. (416) 861– 0092 x 154. FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502– 6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14165–000) in the docket number VerDate Mar<15>2010 17:21 Oct 28, 2011 Jkt 226001 field to access the document. For assistance, contact FERC Online Support. Dated: October 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–28103 Filed 10–28–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14256–000] Windsor Machinery Co., Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 15, 2011, Windsor Machinery Co., Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Braendly Hydroelectric Project to be located on Fishkill Creek in Dutchess County, New York. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would redevelop an abandoned project and consist of: (1) An existing 130-foot-long, 18-foot-high cut stone with a concrete cap dam creating a reservoir with a surface area of approximately 3.04 acres and a total storage capacity of 15 acrefeet at a normal maximum operating elevation of 119.5 feet mean sea level (msl); (2) a new 5-foot-diameter, 200foot-long penstock replacing an existing penstock in its entirety; (3) a new 35foot-long by 35-foot-wide 3-storey high powerhouse at the site of an original powerhouse containing one turbine unit with a rated capacity of 225 kilowatts; (4) an existing 10-foot-long by 5-footwide tailrace; (5) a new 480-volt, 400foot-long transmission line extending from the powerhouse to a nearby building; and (6) appurtenant facilities. The project would have an annual generation of 1,600 megawatt-hours. Applicant Contact: Sarah L. Bower, Windsor Machinery Co., Inc., 16 Orbit Lane, Hopewell Junction, NY 12533; phone: (845) 897–4194. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 67181 Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–(866) 208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/elibrary. asp. Enter the docket number (P–14256– 000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 25, 2011. Kimberly D. Bose, Secretary. [FR Doc. 2011–28086 Filed 10–28–11; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14134–000] Qualified Hydro 21 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications On April 1, 2011, Qualified Hydro 21 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project at the U.S. Army Corps of Engineers’ (Corps) Arkansas E:\FR\FM\31OCN1.SGM 31OCN1

Agencies

[Federal Register Volume 76, Number 210 (Monday, October 31, 2011)]
[Notices]
[Pages 67180-67181]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-28103]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14165-000]


Riverbank Hydro No. 11 LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On May 2, 2011, Riverbank Hydro No. 11 LLC (Riverbank) filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of a 
hydropower project at the U.S. Army Corps of Engineers' (Corps) Nolin 
River Dam, located on the Nolin River, in Edmonson County, Kentucky. 
The sole purpose of a preliminary permit, if issued, is to grant the 
permit holder priority to file a license application during the permit 
term. A preliminary

[[Page 67181]]

permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of: (1) A bifurcation from the 
existing outlet structure; (2) a 10-foot-diameter, 140-foot-long 
penstock; (3) a powerhouse containing one generating unit with a total 
capacity of 8.0 megawatts (MW); (4) a tailrace structure; and (5) an 
3.1-mile-long, 25 kilovolt (kV) transmission line. The project would 
have an estimated average annual generation of 24.5 gigawatt-hours 
(GWh), and operate run-of-river utilizing surplus water from the 
Kentucky River Lock & Dam No. 3, as directed by the Corps.
    Applicant Contact: Mr. Kuo-Bao Tong, Riverbank Power Corporation, 
Royal Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite 
3230, Toronto, ON, Canada M5J2J4. (416) 861-0092 x 154.
    FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-(866) 208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14165-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-28103 Filed 10-28-11; 8:45 am]
BILLING CODE 6717-01-P