Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI FFP Project 54 LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 67169 [2011-28100]
Download as PDF
Federal Register / Vol. 76, No. 210 / Monday, October 31, 2011 / Notices
Bevill Lock & Dam, as directed by the
Corps.
Applicant Contact: Mr. Douglas
Spaulding, Nelson Energy LLC, 8441
Wayzata Blvd., Suite 101, Golden
Valley, MN 55426. (952) 544–8133.
Riverbank’s Project No. 14173–000
would consist of: (1) A forebay; (2) an
intake structure; (3) a powerhouse
containing two generating units with a
total capacity of 20.2 MW; (4) a tailrace
structure; and (5) a 17.3-mile-long, 69
kV transmission line. The project would
Dated: October 25, 2011.
have an estimated average annual
Kimberly D. Bose,
generation of 72.6 GWh, and operate
Secretary.
run-of-river utilizing surplus water from
[FR Doc. 2011–28108 Filed 10–28–11; 8:45 am]
the Tom Bevill Lock & Dam, as directed
BILLING CODE 6717–01–P
by the Corps.
Applicant Contact: Mr. Kuo-Bao
Tong, Riverbank Power Corporation,
DEPARTMENT OF ENERGY
Royal Bank Plaza, South Tower, P.O.
Box 166, 200 Bay Street, Suite 3230,
Federal Energy Regulatory
Toronto, ON, Canada M5J2J4. (416) 861–
Commission
0092 x 154.
Lock Hydro’s Project No. 14182–000
[Project Nos. 14162–000; 14173–000; 14182–
would consist of: (1) One lock frame
000; 14192–000]
modules, the frame module will be 109feet long, 40-feet-high and contain ten
Solia 9 Hydroelectric LLC Riverbank
generating units with a total combined
Hydro No. 17 LLC Lock Hydro Friends
capacity of 15.0 MW; (2) a new
Fund XLI FFP Project 54 LLC; Notice
switchyard containing a transformer;
of Competing Preliminary Permit
and (3) a proposed 10.0-mile-long, 115
Applications Accepted for Filing and
kV transmission line to an existing
Soliciting Comments, Motions To
Intervene, and Competing Applications distribution line. The proposed project
would have an average annual
On May 2, 2011, Solia 9 Hydroelectric generation of 92.043 GWh, and operate
LLC (Solia), and Riverbank Hydro No.
run-of-river utilizing surplus water from
17 LLC (Riverbank), and on May 3,
the Tom Bevill Lock & Dam, as directed
2011, Lock Hydro Friends Fund XLI
by the Corps.
(Lock Hydro), and FFP Project 54 LLC
Applicant Contact: Mr. Wayne F.
(FFP 54) filed preliminary permit
Krouse, Hydro Green Energy, 5090
applications, pursuant to section 4(f) of
Richmond Avenue #390, Houston, TX
the Federal Power Act, proposing to
77056. (877) 556–6566 x 709.
study the feasibility of a hydropower
FFP 54’s Project No. 14192–000 would
project at the U.S. Army Corps of
consist of: (1) A 350-foot-long, 150-footEngineers’ (Corps) Tom Bevill Lock &
wide approach channel; (2) a
Dam, located on the Tombigbee River in powerhouse, located on the west side of
Pickens County, Alabama. The sole
the dam, containing two generating
purpose of a preliminary permit, if
units with a total capacity of 18.0 MW;
issued, is to grant the permit holder
(3) a 300-foot-long, 165-foot-wide
priority to file a license application
tailrace; (4) a 7.2/69 KV substation; and
during the permit term. A preliminary
(5) a 1.0-mile-long, 69 kV transmission
permit does not authorize the permit
line. The proposed project would have
holder to perform any land-disturbing
an average annual generation of 72.0
activities or otherwise enter upon lands GWh, which would be sold to a local
or waters owned by others without the
utility. The project would operate runowners’ express permission.
of-river and utilize flows released from
Solia’s Project No. 14162–000 would
the Tom Bevill Lock & Dam and operate
consist of: (1) A 150-foot-long headrace
as directed by the Corps.
intake channel; (2) a powerhouse
Applicant Contact: Ms. Ramya
containing two generating units with a
Swaminathan, Free Flow Power Corp.,
total capacity of 16.0 megawatt (MW);
239 Causeway Street, Suite 300, Boston,
(3) a 179-foot-long tailrace; (4) a 2.0MA 02114. (978) 283–2822.
mile-long, 34.5 kilo-volt (kV)
FERC Contact: Michael Spencer,
transmission line. The proposed project michael.spencer@ferc.gov, (202) 502–
would have an average annual
6093.
Deadline for filing comments, motions
generation of 75.0 gigawatt-hours
to intervene, competing applications
(GWh), and operate run-of-river
(without notices of intent), or notices of
utilizing surplus water from the Tom
jlentini on DSK4TPTVN1PROD with NOTICES
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14176–000, P–14188–000, or P–
14200–000) in the docket number field
to access the document. For assistance,
contact FERC Online Support.
VerDate Mar<15>2010
17:21 Oct 28, 2011
Jkt 226001
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
67169
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14162–000, P–14173–000, 14182–
000, or P–14192–000) in the docket
number field to access the document.
For assistance, contact FERC Online
Support.
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011–28100 Filed 10–28–11; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14164–000; 14189–000; 14198–
000]
Riverbank Hydro No. 10 LLC Lock
Hydro Friends Fund XL FFP Project 56
LLC; Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Competing
Applications
On May 2, 2011, Riverbank Hydro No.
10 LLC (Riverbank), and on May 3,
2011, Lock Hydro Friends Fund XL
(Lock Hydro), and FFP Project 56 LLC
(FFP 56) filed preliminary permit
applications, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of a hydropower
E:\FR\FM\31OCN1.SGM
31OCN1
Agencies
[Federal Register Volume 76, Number 210 (Monday, October 31, 2011)]
[Notices]
[Page 67169]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2011-28100]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 14162-000; 14173-000; 14182-000; 14192-000]
Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro
Friends Fund XLI FFP Project 54 LLC; Notice of Competing Preliminary
Permit Applications Accepted for Filing and Soliciting Comments,
Motions To Intervene, and Competing Applications
On May 2, 2011, Solia 9 Hydroelectric LLC (Solia), and Riverbank
Hydro No. 17 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends
Fund XLI (Lock Hydro), and FFP Project 54 LLC (FFP 54) filed
preliminary permit applications, pursuant to section 4(f) of the
Federal Power Act, proposing to study the feasibility of a hydropower
project at the U.S. Army Corps of Engineers' (Corps) Tom Bevill Lock &
Dam, located on the Tombigbee River in Pickens County, Alabama. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
Solia's Project No. 14162-000 would consist of: (1) A 150-foot-long
headrace intake channel; (2) a powerhouse containing two generating
units with a total capacity of 16.0 megawatt (MW); (3) a 179-foot-long
tailrace; (4) a 2.0-mile-long, 34.5 kilo-volt (kV) transmission line.
The proposed project would have an average annual generation of 75.0
gigawatt-hours (GWh), and operate run-of-river utilizing surplus water
from the Tom Bevill Lock & Dam, as directed by the Corps.
Applicant Contact: Mr. Douglas Spaulding, Nelson Energy LLC, 8441
Wayzata Blvd., Suite 101, Golden Valley, MN 55426. (952) 544-8133.
Riverbank's Project No. 14173-000 would consist of: (1) A forebay;
(2) an intake structure; (3) a powerhouse containing two generating
units with a total capacity of 20.2 MW; (4) a tailrace structure; and
(5) a 17.3-mile-long, 69 kV transmission line. The project would have
an estimated average annual generation of 72.6 GWh, and operate run-of-
river utilizing surplus water from the Tom Bevill Lock & Dam, as
directed by the Corps.
Applicant Contact: Mr. Kuo-Bao Tong, Riverbank Power Corporation,
Royal Bank Plaza, South Tower, P.O. Box 166, 200 Bay Street, Suite
3230, Toronto, ON, Canada M5J2J4. (416) 861-0092 x 154.
Lock Hydro's Project No. 14182-000 would consist of: (1) One lock
frame modules, the frame module will be 109-feet long, 40-feet-high and
contain ten generating units with a total combined capacity of 15.0 MW;
(2) a new switchyard containing a transformer; and (3) a proposed 10.0-
mile-long, 115 kV transmission line to an existing distribution line.
The proposed project would have an average annual generation of 92.043
GWh, and operate run-of-river utilizing surplus water from the Tom
Bevill Lock & Dam, as directed by the Corps.
Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090
Richmond Avenue 390, Houston, TX 77056. (877) 556-6566 x 709.
FFP 54's Project No. 14192-000 would consist of: (1) A 350-foot-
long, 150-foot-wide approach channel; (2) a powerhouse, located on the
west side of the dam, containing two generating units with a total
capacity of 18.0 MW; (3) a 300-foot-long, 165-foot-wide tailrace; (4) a
7.2/69 KV substation; and (5) a 1.0-mile-long, 69 kV transmission line.
The proposed project would have an average annual generation of 72.0
GWh, which would be sold to a local utility. The project would operate
run-of-river and utilize flows released from the Tom Bevill Lock & Dam
and operate as directed by the Corps.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corp.,
239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822.
FERC Contact: Michael Spencer, michael.spencer@ferc.gov, (202) 502-
6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support. Although the Commission strongly encourages electronic filing,
documents may also be paper-filed. To paper-file, mail an original and
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14162-000, P-14173-000, 14182-000, or P-
14192-000) in the docket number field to access the document. For
assistance, contact FERC Online Support.
Dated: October 25, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-28100 Filed 10-28-11; 8:45 am]